Back to bathroom remodel contractors
Cp/M Company Inc.
- Based in
- Oakland
- On San Francisco permits
- Apr 2008 to Feb 2024
- Last 24 months
- 0 permits filed
26 permits since 2000: 24 completed, 1 never finaled, 1 expired or cancelled.
Of the 1 never-finaled permit, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
6 bathroom remodel permits: 6 completed. Typically 2 days from filing to permit and 136 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Feb 6, 2024 | Completed final sign-off Mar 2024 | 917 Central Av | revision to pa# 2015-1223-5837 fill-in living space under approved 2nd fl deck. revised bathroom layout on 1st fl. no structural changesDetails
revision to pa# 2015-1223-5837 fill-in living space under approved 2nd fl deck. revised bathroom layout on 1st fl. no structural changes | $25,000 |
| Dec 23, 2015 | Completed final sign-off Mar 2024 | 917 Central Av | add partial 4th flr. vertical addition & rear horizontal addition @ 2nd/3rd fl. interior remodel of (e) kitchen & bathrooms, legalize (e) unit @ 1st flr, widen (e) driveway. seimic upgrade, replace (e) windows with marvin wood clad, (n) ext. trim & siding.Details
add partial 4th flr. vertical addition & rear horizontal addition @ 2nd/3rd fl. interior remodel of (e) kitchen & bathrooms, legalize (e) unit @ 1st flr, widen (e) driveway. seimic upgrade, replace (e) windows with marvin wood clad, (n) ext. trim & siding. | $675,000 |
| Nov 6, 2015 | Completed final sign-off Feb 2017 | 768 44th Av | remodel (e) kitchen and bathroom, appliances & fixtures, same location. all lights high efficacy and gfi circuits per nec, new cabinets. no walls moved, removed, add or infilled. all existing layouts to remain the same.Details
remodel (e) kitchen and bathroom, appliances & fixtures, same location. all lights high efficacy and gfi circuits per nec, new cabinets. no walls moved, removed, add or infilled. all existing layouts to remain the same. | $55,000 |
| Sep 30, 2014 | Completed final sign-off Mar 2015 | 454 34th Av | remodel 1 1/2 baths, new finishes, elec, plumb.Details
remodel 1 1/2 baths, new finishes, elec, plumb. | $50,000 |
| Aug 15, 2014 | Completed final sign-off Nov 2014 | 1842 40th Av | remodel 1 bathroom, new plumbing & electrical. no removal of (e) walls, fixtures in same location. to comply with cec150.0(k)5Details
remodel 1 bathroom, new plumbing & electrical. no removal of (e) walls, fixtures in same location. to comply with cec150.0(k)5 | $18,000 |
| Jun 6, 2014 | Completed final sign-off Sep 2014 | 2354 42nd Av | remodel (e) bathrooms, new fixtures, replace (e) tub & shower, new lighting and insulation, tile shower, add 1 sink. no change at wall, window and door.Details
remodel (e) bathrooms, new fixtures, replace (e) tub & shower, new lighting and insulation, tile shower, add 1 sink. no change at wall, window and door. | $40,000 |