Constantine Construction
- Based in
- San Francisco
- On San Francisco permits
- Jul 2005 to Sep 2026
- Last 24 months
- 4 permits filed
29 permits since 2000: 22 completed, 3 in progress, 4 expired or cancelled.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Kitchen remodel permits
6 kitchen remodel permits: 4 completed, 1 in progress, 1 expired or cancelled. Typically 0 days from filing to permit and 65 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 2, 2026 | In progress issued Sep 2026 | 365 28th Av | in kind kitchen remodel.Details
in kind kitchen remodel. | $25,550 |
| May 7, 2025 | Completed final sign-off Aug 2025 | 1886 Great Hy | kitchen remodel in kind- remove & replace existing cabients + sheetrock on 3 walls + flooring. upgrade plumbing+ electrical, sheetrock +tape 3walls, install new cabinets and new flooring. gypboard to be 5/8" type x w/ 5d cooler nails @ 4"oc or equivalent screws. no change to floor & wall layout. n0Details
kitchen remodel in kind- remove & replace existing cabients + sheetrock on 3 walls + flooring. upgrade plumbing+ electrical, sheetrock +tape 3walls, install new cabinets and new flooring. gypboard to be 5/8" type x w/ 5d cooler nails @ 4"oc or equivalent screws. no change to floor & wall layout. n0 | $20,000 |
| Sep 3, 2019 | Completed final sign-off Oct 2020 | 1882 Great Hy | revision to app#201805179379. the extg kitchen will also be remodeled. additonal electrical and lighting will be done on the 2nd floor. dry-rot in exgt framing at the front bay and rear wall will be repaired/replaced as needed.front facade framing and stucco finish to be replaced in kindDetails
revision to app#201805179379. the extg kitchen will also be remodeled. additonal electrical and lighting will be done on the 2nd floor. dry-rot in exgt framing at the front bay and rear wall will be repaired/replaced as needed.front facade framing and stucco finish to be replaced in kind | $18,000 |
| Sep 22, 2015 | Expired or cancelled expired Dec 2018 | 1780 Revere Av | 1) demolish extg front stair. 2)install new front stair and landing. 3) install new exterior door, exterior windows and install new planters and pavers. 5) frame new kitchen, living room, bedroom & laundry room @ ground lvl. remove upper lvl rear stairway & deck.Details
1) demolish extg front stair. 2)install new front stair and landing. 3) install new exterior door, exterior windows and install new planters and pavers. 5) frame new kitchen, living room, bedroom & laundry room @ ground lvl. remove upper lvl rear stairway & deck. | $45,000 |
| Aug 8, 2011 | Completed final sign-off Sep 2011 | 525 Lawton St | remove existing cabinets and install new kitchen @ 2nd floor cabinets and counter tops. no (n) lighting. no structural work. provde carbon monoxide detector for each level per s.f. bldg. code.Details
remove existing cabinets and install new kitchen @ 2nd floor cabinets and counter tops. no (n) lighting. no structural work. provde carbon monoxide detector for each level per s.f. bldg. code. | $3,000 |
| Aug 12, 2008 | Completed final sign-off Aug 2008 | 2334 27th Av | revision to appl #200801172783 - delete kitchen & four bathroom remodelling. under the bay window add 120 sq ft stucco patch and new kitchen floors. recording "as-built" conditions for final inspection.Details
revision to appl #200801172783 - delete kitchen & four bathroom remodelling. under the bay window add 120 sq ft stucco patch and new kitchen floors. recording "as-built" conditions for final inspection. |