Back to bathroom remodel contractors
Constantine Construction
- Based in
- San Francisco
- On San Francisco permits
- Jul 2005 to Sep 2026
- Last 24 months
- 4 permits filed
29 permits since 2000: 22 completed, 3 in progress, 4 expired or cancelled.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
5 bathroom remodel permits: 4 completed, 1 in progress. Typically 12 days from filing to permit and 410 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Dec 24, 2024 | In progress issued Dec 2024 | 970 Duncan St | unit 107f- bathroom remodel in kind. remove (e) flooring and install new flooring and base in living room and bedroom. replace (e) interior doors. replace wall heater and fireplace. no wall construction or modification. no reframing. no structural work. no change to floor layout or wall layout. no wDetails
unit 107f- bathroom remodel in kind. remove (e) flooring and install new flooring and base in living room and bedroom. replace (e) interior doors. replace wall heater and fireplace. no wall construction or modification. no reframing. no structural work. no change to floor layout or wall layout. no w | $8,500 |
| May 17, 2018 | Completed final sign-off Oct 2020 | 1882 Great Hy | vertical & horizontal addition. the project will add a partial 3rd flr to an (e) 2-story home. the (n) 3rd flr will include a full bathroom & living room. also, a (n) deck will be included at the front & rear of the (n) 3rd flr.Details
vertical & horizontal addition. the project will add a partial 3rd flr to an (e) 2-story home. the (n) 3rd flr will include a full bathroom & living room. also, a (n) deck will be included at the front & rear of the (n) 3rd flr. | $235,000 |
| Apr 8, 2015 | Completed final sign-off Feb 2017 | 1780 Revere Av | interior remodel: grnd flr: partitions to designate (n) room layout, 1 bathroom, 1 utility room; add new interior doors. change out (at rear) 1 window for door, 1 door for window. 2nd flr: remodel kitch, change window for door and door for window, add 1 new bathroom, remodel (e) bathroom add w/dDetails
interior remodel: grnd flr: partitions to designate (n) room layout, 1 bathroom, 1 utility room; add new interior doors. change out (at rear) 1 window for door, 1 door for window. 2nd flr: remodel kitch, change window for door and door for window, add 1 new bathroom, remodel (e) bathroom add w/d | $75,000 |
| May 1, 2013 | Completed final sign-off Feb 2014 | 31 Riverton Dr | new bedroom suite with walk-in closet & bathroom at first floor. laundry area to be relcoated, new bathroom at second floor.Details
new bedroom suite with walk-in closet & bathroom at first floor. laundry area to be relcoated, new bathroom at second floor. | $50,000 |
| Aug 12, 2008 | Completed final sign-off Aug 2008 | 2334 27th Av | revision to appl #200801172783 - delete kitchen & four bathroom remodelling. under the bay window add 120 sq ft stucco patch and new kitchen floors. recording "as-built" conditions for final inspection.Details
revision to appl #200801172783 - delete kitchen & four bathroom remodelling. under the bay window add 120 sq ft stucco patch and new kitchen floors. recording "as-built" conditions for final inspection. |