Back to kitchen remodel contractors
Conrad Gordon
- Based in
- San Francisco
- On San Francisco permits
- Sep 2003 to Jul 2009
- Last 24 months
- 0 permits filed
15 permits since 2000: 12 completed, 1 never finaled, 2 expired or cancelled.
Of the 1 never-finaled permit, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
7 kitchen remodel permits: 6 completed, 1 expired or cancelled. Typically 0 days from filing to permit and 214 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Apr 20, 2009 | Expired or cancelled expired Sep 2012 | 548 Staples Av | enclosed side window not visible from street front. install (n) glass block & kitchen & stairwell area, add (n) neck vent for kitchen per plan.Details
enclosed side window not visible from street front. install (n) glass block & kitchen & stairwell area, add (n) neck vent for kitchen per plan. | $2,000 |
| Feb 23, 2009 | Completed final sign-off Dec 2009 | 548 Staples Av | full kitchen remodel. replace all cabinets, countertops, appliances, new lighting to be minimum of 50% fluorescent.Details
full kitchen remodel. replace all cabinets, countertops, appliances, new lighting to be minimum of 50% fluorescent. | $35,000 |
| Dec 26, 2007 | Completed final sign-off Jun 2008 | 1777 Pacific Av | remove & replace kitchen cabinets, appliances, counter tops.Details
remove & replace kitchen cabinets, appliances, counter tops. | $23,000 |
| Sep 19, 2007 | Completed final sign-off Jun 2008 | 3471 Jackson St | kitchen remodel and new closet in bedroom on second floor.Details
kitchen remodel and new closet in bedroom on second floor. | $40,000 |
| Jun 28, 2007 | Completed final sign-off Aug 2007 | 650 Delancey St | raised kitchen floor, construct built in chair lounge and new railing at cat walk areaDetails
raised kitchen floor, construct built in chair lounge and new railing at cat walk area | $6,000 |
| Apr 2, 2007 | Completed final sign-off Aug 2007 | 650 Delancey St | kitchen/ 2 bathrooms remodel, new fixutres and appliances, no structural work, at least 50% of new lighting wattage must be flourescent. bath lighting 100% wattage must be flrscnt or motion sensing controlDetails
kitchen/ 2 bathrooms remodel, new fixutres and appliances, no structural work, at least 50% of new lighting wattage must be flourescent. bath lighting 100% wattage must be flrscnt or motion sensing control | $60,000 |
| Feb 12, 2007 | Completed final sign-off Mar 2008 | 1712 Kearny St | kitchen remodel, new fixtures and appliances, no structural work. at least 50% of new lighting wattage must be flourescentDetails
kitchen remodel, new fixtures and appliances, no structural work. at least 50% of new lighting wattage must be flourescent | $10,000 |