Conrad Gordon
- Based in
- San Francisco
- On San Francisco permits
- Sep 2003 to Jul 2009
- Last 24 months
- 0 permits filed
15 permits since 2000: 12 completed, 1 never finaled, 2 expired or cancelled.
Of the 1 never-finaled permit, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Deck permits
2 deck permits: 2 completed. Typically 0 days from filing to permit and 181 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Nov 14, 2008 | Completed final sign-off Aug 2009 | 3471 Jackson St | replace in kind small deck in back yard. replace dryrot not to exceed 50%.Details
replace in kind small deck in back yard. replace dryrot not to exceed 50%. | $6,000 |
| Jun 23, 2008 | Completed final sign-off Sep 2008 | 2549 Post St | work @ unit# 1 only. repair (e) rear deck. remove deck planking & sleepers. replace with bison deck system screw jack system. install ipe files (24" x 24") at 1st floore level rear.Details
work @ unit# 1 only. repair (e) rear deck. remove deck planking & sleepers. replace with bison deck system screw jack system. install ipe files (24" x 24") at 1st floore level rear. | $4,000 |