Back to kitchen remodel contractors
Connemara Fine Trim Inc Dba Highland Bui
- Based in
- San Francisco
- On San Francisco permits
- Oct 2015 to Jun 2026
- Last 24 months
- 7 permits filed
34 permits since 2000: 23 completed, 4 in progress, 5 never finaled, 2 expired or cancelled.
Of the 5 never-finaled permits, 3 are 3 to 5 years old, 2 are 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Kitchen remodel permits
6 kitchen remodel permits: 3 completed, 2 in progress, 1 never finaled. Typically 0 days from filing to permit and 361 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 2, 2026 | In progress issued Jun 2026 | 2206 Green St | kitchen remodel in kind, update electrical and plumbing as needed.Details
kitchen remodel in kind, update electrical and plumbing as needed. | $58,000 |
| Jul 7, 2025 | In progress issued Jul 2025 | 1727 Page St | remove "w" roof & replace w/ flat roof to support solar (separat permit). expand e) kitchen at 2nd/f. add wall to create bedroom from e) den at 2nd/f. support for e) bay windowDetails
remove "w" roof & replace w/ flat roof to support solar (separat permit). expand e) kitchen at 2nd/f. add wall to create bedroom from e) den at 2nd/f. support for e) bay window | $300,000 |
| Jun 17, 2025 | Completed final sign-off Mar 2026 | 2226 Green St | primary 1 bathroom remodel - replace in kind - plumbing fixtures to remain in similar locations. replace section of upper cabinets in 1 kitchen w/ open shelves. replace countertop + decorative lighting in kitchen in kind. drywall repair + paint as needed.Details
primary 1 bathroom remodel - replace in kind - plumbing fixtures to remain in similar locations. replace section of upper cabinets in 1 kitchen w/ open shelves. replace countertop + decorative lighting in kitchen in kind. drywall repair + paint as needed. | $100,000 |
| Apr 12, 2024 | Completed final sign-off Apr 2025 | 666 Natoma St | remodel kitchen and 2 bathroomsDetails
remodel kitchen and 2 bathrooms | $107,500 |
| Jul 19, 2022 | Completed final sign-off Jun 2026 | 1500 06th Av | horizontal addition & interior alteration. expand (e) remodeled kitchen and sitting room off rear. (n) bath @ (e) 1st fl. expand 2 bedrooms off rear. (n) bath @ (e) 2nd fl, (n) waterproof deck @ (e) 2nd fl. structural upgrade as req'd. mep via separate permit. (n) windows & doors at addition .Details
horizontal addition & interior alteration. expand (e) remodeled kitchen and sitting room off rear. (n) bath @ (e) 1st fl. expand 2 bedrooms off rear. (n) bath @ (e) 2nd fl, (n) waterproof deck @ (e) 2nd fl. structural upgrade as req'd. mep via separate permit. (n) windows & doors at addition . | $145,000 |
| Feb 15, 2022 | Never finaled issued Feb 2022, no final | 5940 California St | unit 5: kitchen and bathroom remodels, replacing fixtures in kind, updating electrical, refinish hardwood floors. repair tile, smooth texture on sheetrock, new hardware on doors. no removal of wallsDetails
unit 5: kitchen and bathroom remodels, replacing fixtures in kind, updating electrical, refinish hardwood floors. repair tile, smooth texture on sheetrock, new hardware on doors. no removal of walls | $45,000 |