Back to bathroom remodel contractors
Connemara Fine Trim Inc Dba Highland Bui
- Based in
- San Francisco
- On San Francisco permits
- Oct 2015 to Jun 2026
- Last 24 months
- 7 permits filed
34 permits since 2000: 23 completed, 4 in progress, 5 never finaled, 2 expired or cancelled.
Of the 5 never-finaled permits, 3 are 3 to 5 years old, 2 are 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
10 bathroom remodel permits: 9 completed, 1 never finaled. Typically 4 days from filing to permit and 276 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Oct 8, 2025 | Completed final sign-off Mar 2026 | 2226 Green St | revision to pa# 202506178914: add (2) bathroom remodels - in kind with no layout changes. replace tile, plumbing fixtures, and vanities.Details
revision to pa# 202506178914: add (2) bathroom remodels - in kind with no layout changes. replace tile, plumbing fixtures, and vanities. | $50,000 |
| Jun 17, 2025 | Completed final sign-off Mar 2026 | 2226 Green St | primary 1 bathroom remodel - replace in kind - plumbing fixtures to remain in similar locations. replace section of upper cabinets in 1 kitchen w/ open shelves. replace countertop + decorative lighting in kitchen in kind. drywall repair + paint as needed.Details
primary 1 bathroom remodel - replace in kind - plumbing fixtures to remain in similar locations. replace section of upper cabinets in 1 kitchen w/ open shelves. replace countertop + decorative lighting in kitchen in kind. drywall repair + paint as needed. | $100,000 |
| Apr 12, 2024 | Completed final sign-off Apr 2025 | 666 Natoma St | remodel kitchen and 2 bathroomsDetails
remodel kitchen and 2 bathrooms | $107,500 |
| Jul 19, 2022 | Completed final sign-off Jun 2026 | 1500 06th Av | horizontal addition & interior alteration. expand (e) remodeled kitchen and sitting room off rear. (n) bath @ (e) 1st fl. expand 2 bedrooms off rear. (n) bath @ (e) 2nd fl, (n) waterproof deck @ (e) 2nd fl. structural upgrade as req'd. mep via separate permit. (n) windows & doors at addition .Details
horizontal addition & interior alteration. expand (e) remodeled kitchen and sitting room off rear. (n) bath @ (e) 1st fl. expand 2 bedrooms off rear. (n) bath @ (e) 2nd fl, (n) waterproof deck @ (e) 2nd fl. structural upgrade as req'd. mep via separate permit. (n) windows & doors at addition . | $145,000 |
| Feb 15, 2022 | Never finaled issued Feb 2022, no final | 5940 California St | unit 5: kitchen and bathroom remodels, replacing fixtures in kind, updating electrical, refinish hardwood floors. repair tile, smooth texture on sheetrock, new hardware on doors. no removal of wallsDetails
unit 5: kitchen and bathroom remodels, replacing fixtures in kind, updating electrical, refinish hardwood floors. repair tile, smooth texture on sheetrock, new hardware on doors. no removal of walls | $45,000 |
| Apr 28, 2021 | Completed final sign-off Jun 2023 | 829 25th Av | interior remodel. add spiral staircase from ground level to 2nd fl. modify (e) partitions to accomodate (n) stair. (n) bathroom & wet bar at ground level. (n) door opening to rear yard. mep under separate permits. no added conditioned areas, volume or size. no work on 3rd fl.Details
interior remodel. add spiral staircase from ground level to 2nd fl. modify (e) partitions to accomodate (n) stair. (n) bathroom & wet bar at ground level. (n) door opening to rear yard. mep under separate permits. no added conditioned areas, volume or size. no work on 3rd fl. | $110,000 |
| Sep 19, 2017 | Completed final sign-off Aug 2018 | 61 Sharon St | 2nd fl: new bathroom: existing office spaace to be remodeled into a bathroom with toilet, vanity, & shower. re-sheetrock, tile, plumbing & electrical.Details
2nd fl: new bathroom: existing office spaace to be remodeled into a bathroom with toilet, vanity, & shower. re-sheetrock, tile, plumbing & electrical. | $45,000 |
| Aug 9, 2017 | Completed final sign-off Nov 2017 | 974 Clayton St | bathroom remodel, remove/replace all plumbing fixtures, update electrical, new tile, sheetrock, no change to walls/doors/openings.Details
bathroom remodel, remove/replace all plumbing fixtures, update electrical, new tile, sheetrock, no change to walls/doors/openings. | $21,000 |
| Jun 17, 2016 | Completed final sign-off Mar 2017 | 688 Teresita Bl | renovate (e) bathroom, replace (e) front window in kind; upgrade existing plumbing, electrical and heating systemsDetails
renovate (e) bathroom, replace (e) front window in kind; upgrade existing plumbing, electrical and heating systems | $60,000 |
| May 5, 2016 | Completed final sign-off Dec 2016 | 65 Post St | change of use from bank to bar. interior remodeling of (e) commercial tenant space for new bar tavern. upgrade bathrooms to (n) ada compliant bathrooms.Details
change of use from bank to bar. interior remodeling of (e) commercial tenant space for new bar tavern. upgrade bathrooms to (n) ada compliant bathrooms. | $86,400 |