Concept Design And Build
- Based in
- San Francisco
- On San Francisco permits
- Aug 2007 to Oct 2026
- Last 24 months
- 10 permits filed
20 permits since 2000: 14 completed, 4 in progress, 2 never finaled.
Of the 2 never-finaled permits, 1 is 3 to 5 years old, 1 is 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Stairs permits
1 stairs permit: 1 completed. Typically 9 days from filing to permit and 487 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Mar 29, 2023 | Completed final sign-off Aug 2024 | 154 Funston Av | remodel kitchen, construct (n) bathroom, remodel (e) bathroom, construct (n) bedroom, remove walls between living room & (n) kitchen at 154 funston 3/f. remodel kitchen, construct (n) bathroom, remodel (e) bathroom, remove walls between living room, (n) kitchen & dining room. (n) staircase connectinDetails
remodel kitchen, construct (n) bathroom, remodel (e) bathroom, construct (n) bedroom, remove walls between living room & (n) kitchen at 154 funston 3/f. remodel kitchen, construct (n) bathroom, remodel (e) bathroom, remove walls between living room, (n) kitchen & dining room. (n) staircase connectin | $250,000 |