- 10 permits filed
20 permits since 2000: 14 completed, 4 in progress, 2 never finaled.
Of the 2 never-finaled permits, 1 is 3 to 5 years old, 1 is 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
7 kitchen remodel permits: 6 completed, 1 in progress. Typically 0 days from filing to permit and 73 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 10, 2026 | In progress issued Jun 2026 | 95 Junipero Serra Bl | remodel kitchen. remodel 2 full bathrooms, 1 half bathroom. all in kind.Details
remodel kitchen. remodel 2 full bathrooms, 1 half bathroom. all in kind. | $45,000 |
| Feb 20, 2026 | Completed final sign-off Mar 2026 | 3040 Jackson St | unit #1: replace kitchen cabinets & countertops, replace bathroom cabinet & tile, all in kind, repair flooring & paint. update plumbing and electrical.Details
unit #1: replace kitchen cabinets & countertops, replace bathroom cabinet & tile, all in kind, repair flooring & paint. update plumbing and electrical. | $30,000 |
| Oct 22, 2025 | Completed final sign-off Dec 2025 | 1359 10th Av | unit#1: replace kitchen cabinets and countertops, replace bathroom cabinets and tile, replace flooring, paint, all in kind, same size & location, interior work onlyDetails
unit#1: replace kitchen cabinets and countertops, replace bathroom cabinets and tile, replace flooring, paint, all in kind, same size & location, interior work only | $35,000 |
| May 23, 2025 | Completed final sign-off Jun 2025 | 1359 10th Av | #4: to comply with complaint 202537902. kitchen replace cabinets and countertops. bathroom replace cabinet and tile. replace flooring and paint. all in kind.Details
#4: to comply with complaint 202537902. kitchen replace cabinets and countertops. bathroom replace cabinet and tile. replace flooring and paint. all in kind. | $25,000 |
| Oct 10, 2024 | Completed final sign-off Jan 2025 | 150 28th St | unit #6 replace kitchen & bathroom cabinets, countertops. all in kindDetails
unit #6 replace kitchen & bathroom cabinets, countertops. all in kind | $25,000 |
| Jun 24, 2024 | Completed final sign-off Nov 2024 | 462 02nd Av | unit #1: replace kitchen & bathroom cabinets, tile, & countertops. all in kind.Details
unit #1: replace kitchen & bathroom cabinets, tile, & countertops. all in kind. | $10,000 |
| Mar 29, 2023 | Completed final sign-off Aug 2024 | 154 Funston Av | remodel kitchen, construct (n) bathroom, remodel (e) bathroom, construct (n) bedroom, remove walls between living room & (n) kitchen at 154 funston 3/f. remodel kitchen, construct (n) bathroom, remodel (e) bathroom, remove walls between living room, (n) kitchen & dining room. (n) staircase connectinDetails
remodel kitchen, construct (n) bathroom, remodel (e) bathroom, construct (n) bedroom, remove walls between living room & (n) kitchen at 154 funston 3/f. remodel kitchen, construct (n) bathroom, remodel (e) bathroom, remove walls between living room, (n) kitchen & dining room. (n) staircase connectin | $250,000 |