Back to kitchen remodel contractors
Concept Construction
- Based in
- Alameda
- On San Francisco permits
- Feb 2005 to Aug 2023
- Last 24 months
- 0 permits filed
13 permits since 2000: 8 completed, 4 never finaled, 1 expired or cancelled.
Of the 4 never-finaled permits, 1 is 5 to 10 years old, 3 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Kitchen remodel permits
5 kitchen remodel permits: 3 completed, 2 never finaled. Typically 0 days from filing to permit and 238 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 24, 2023 | Completed final sign-off Sep 2023 | 118 Virginia Av | rev to pa# 201610170517 & 202306260849, adding new beam at kitchen/dining area to widen existing opening per structural plan.Details
rev to pa# 201610170517 & 202306260849, adding new beam at kitchen/dining area to widen existing opening per structural plan. | $3,000 |
| Oct 17, 2016 | Never finaled issued Oct 2016, no final | 118 Virginia Av | kitchen remodeling, replace existing cabinets with new units, intsll new sink, faucet, countertop, led lights, install new window, install wall ceiling insulation, drywall, painting. provide plumbing to islandDetails
kitchen remodeling, replace existing cabinets with new units, intsll new sink, faucet, countertop, led lights, install new window, install wall ceiling insulation, drywall, painting. provide plumbing to island | $8,000 |
| Nov 10, 2005 | Completed final sign-off Jul 2006 | 650 Faxon Av | redo 1 kitchen & 1 bathroom,no change to lay out.non structuralDetails
redo 1 kitchen & 1 bathroom,no change to lay out.non structural | $24,778 |
| Aug 5, 2005 | Completed final sign-off Apr 2006 | 1511 Innes Av | legalize rooms in the downstairs, for storage only, remove wall on 2nd fl between kitchen & living rDetails
legalize rooms in the downstairs, for storage only, remove wall on 2nd fl between kitchen & living r | $40,000 |
| Feb 18, 2005 | Never finaled issued Feb 2005, no final | 906 Stanyan St | kitchen remodel new elec, plumb, cabinets, appliances, sink bathroom, walls, tiles, tubs, toilet,Details
kitchen remodel new elec, plumb, cabinets, appliances, sink bathroom, walls, tiles, tubs, toilet, | $32,000 |