Back to bathroom remodel contractors
Concept Construction
- Based in
- Alameda
- On San Francisco permits
- Feb 2005 to Aug 2023
- Last 24 months
- 0 permits filed
13 permits since 2000: 8 completed, 4 never finaled, 1 expired or cancelled.
Of the 4 never-finaled permits, 1 is 5 to 10 years old, 3 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
7 bathroom remodel permits: 4 completed, 3 never finaled. Typically 0 days from filing to permit and 182 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 6, 2006 | Completed final sign-off Feb 2007 | 1358 Grove St | redo (1) hallway bath with corner shower, replumb for bidet, install wall and floor tile, replace sink, mirror, repaint entire bathroom. non-structural work.Details
redo (1) hallway bath with corner shower, replumb for bidet, install wall and floor tile, replace sink, mirror, repaint entire bathroom. non-structural work. | $6,780 |
| Sep 6, 2006 | Never finaled issued Sep 2006, no final | 1356 Grove St | re-do (1) hallway bathroom with walk in shower, install wall and floor tile, replace mirror and vanaity, repaint entire bathroom. non-structural work.Details
re-do (1) hallway bathroom with walk in shower, install wall and floor tile, replace mirror and vanaity, repaint entire bathroom. non-structural work. | $7,200 |
| Aug 2, 2006 | Completed final sign-off Jan 2007 | 3010 21st Av | redo master bath with walk in shower, replace current tub with new unit 9same location), tile shower pna, wall and floor area, install medicine cabinet, exhaust fan, light fixture, toiletDetails
redo master bath with walk in shower, replace current tub with new unit 9same location), tile shower pna, wall and floor area, install medicine cabinet, exhaust fan, light fixture, toilet | $7,000 |
| Jul 28, 2006 | Never finaled issued Jul 2006, no final | 210 Beacon St | replace downstairs bathroom window in rear with new unit (same location). cap off shower drain & supply lines, replace sink, toilet, mirror and faucet with new units. comply with comp# 200671737.Details
replace downstairs bathroom window in rear with new unit (same location). cap off shower drain & supply lines, replace sink, toilet, mirror and faucet with new units. comply with comp# 200671737. | $2,000 |
| Jun 27, 2006 | Completed final sign-off Jan 2007 | 210 Beacon St | replace exg kchn cabinets with new units instll back splash tiles, cooktop, microwave. redo master bath with walk in shower floor tile insulate exterior wall, drywall and finish. install mirror, sink toilet( no lighting change)Details
replace exg kchn cabinets with new units instll back splash tiles, cooktop, microwave. redo master bath with walk in shower floor tile insulate exterior wall, drywall and finish. install mirror, sink toilet( no lighting change) | $24,375 |
| Nov 10, 2005 | Completed final sign-off Jul 2006 | 650 Faxon Av | redo 1 kitchen & 1 bathroom,no change to lay out.non structuralDetails
redo 1 kitchen & 1 bathroom,no change to lay out.non structural | $24,778 |
| Feb 18, 2005 | Never finaled issued Feb 2005, no final | 906 Stanyan St | kitchen remodel new elec, plumb, cabinets, appliances, sink bathroom, walls, tiles, tubs, toilet,Details
kitchen remodel new elec, plumb, cabinets, appliances, sink bathroom, walls, tiles, tubs, toilet, | $32,000 |