Back to kitchen remodel contractors
Community First Construction Corp
- Based in
- Petaluma
- On San Francisco permits
- Jul 2011 to Sep 2018
- Last 24 months
- 0 permits filed
13 permits since 2000: 6 completed, 6 never finaled, 1 expired or cancelled.
Of the 6 never-finaled permits, 1 is 5 to 10 years old, 5 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
9 kitchen remodel permits: 5 completed, 3 never finaled, 1 expired or cancelled. Typically 4 days from filing to permit and 133 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Nov 12, 2013 | Never finaled issued Dec 2013, no final | 1520 Gough St | remodel unit# 301. add a bedroom and closet. relocate kitchen fixtures and cabinets. remodel bathroom.Details
remodel unit# 301. add a bedroom and closet. relocate kitchen fixtures and cabinets. remodel bathroom. | $20,000 |
| Oct 31, 2013 | Completed final sign-off Mar 2014 | 795 Pine St | bathroom & kitchen remodel and replace all fixtures, all high efficiency lights.Details
bathroom & kitchen remodel and replace all fixtures, all high efficiency lights. | $15,000 |
| Oct 23, 2013 | Never finaled issued Oct 2013, no final | 1520 Gough St | remodel unit# 702. add a bedroom and closet. relocation and remodel of kitchen. remodel of (e) bathroom including new tiles, toilet and vanity. up grade of plumbing and electrical sts as needed. to comply with cec150(k) 8 & 10Details
remodel unit# 702. add a bedroom and closet. relocation and remodel of kitchen. remodel of (e) bathroom including new tiles, toilet and vanity. up grade of plumbing and electrical sts as needed. to comply with cec150(k) 8 & 10 | $25,000 |
| Sep 17, 2013 | Completed final sign-off Nov 2013 | 270 Turk St | unit #708:interior remodel. demo non-bearing walls at closet and kitchen. kitchen and bathroom remodel.Details
unit #708:interior remodel. demo non-bearing walls at closet and kitchen. kitchen and bathroom remodel. | $18,000 |
| Sep 13, 2013 | Completed final sign-off Aug 2014 | 3659 20th St | remodel units #3673a: add new closets, add laundry outlets, remove non bearing walls, relocate kitchen fixtures and cabinets, remodel bathroom, new tile, toilet and vanity. upgrade electrical & plumbing fixtures, reroute elec wires and plumbing as needed. add new gas heater in bedroom.Details
remodel units #3673a: add new closets, add laundry outlets, remove non bearing walls, relocate kitchen fixtures and cabinets, remodel bathroom, new tile, toilet and vanity. upgrade electrical & plumbing fixtures, reroute elec wires and plumbing as needed. add new gas heater in bedroom. | $25,000 |
| Aug 30, 2013 | Completed final sign-off Aug 2014 | 3659 20th St | remodel units #3675, 3675a: add new closets, add laundry outlets, remove non bearing walls, relocate kitchen fixtures and cabinets, remodel bathroom, new tile, toilet and vanity. upgrade electrical & plumbing fixtures, reroute elec wires and plumbing as needed.Details
remodel units #3675, 3675a: add new closets, add laundry outlets, remove non bearing walls, relocate kitchen fixtures and cabinets, remodel bathroom, new tile, toilet and vanity. upgrade electrical & plumbing fixtures, reroute elec wires and plumbing as needed. | $50,000 |
| Aug 7, 2013 | Completed final sign-off Dec 2013 | 947 Bush St | unit #7-remodel kitchen-move kitchen sink, remodel bathroom-convert tub/shower into shower, move vanity, upgrade electrical & plumbing fixturesDetails
unit #7-remodel kitchen-move kitchen sink, remodel bathroom-convert tub/shower into shower, move vanity, upgrade electrical & plumbing fixtures | $20,000 |
| Mar 7, 2013 | Never finaled issued Mar 2013, no final | 1000 Daniel Burnham Ct | remove & replace cabinets & sink, add recess lights, double sink vanity @ bathroom. install tile floor in kitchen & bathroom in #309. building built in 1988Details
remove & replace cabinets & sink, add recess lights, double sink vanity @ bathroom. install tile floor in kitchen & bathroom in #309. building built in 1988 | $15,000 |
| Jul 8, 2011 | Expired or cancelled expired Dec 2012 | 1200 California St | we are going to remove & replace granite, paint cabinets, install new stove, oven, kitchen sink, install 6 can lights, hardwood floor, light to comply cec 150(k) @ 1 kitchen, no change watts window or doorsDetails
we are going to remove & replace granite, paint cabinets, install new stove, oven, kitchen sink, install 6 can lights, hardwood floor, light to comply cec 150(k) @ 1 kitchen, no change watts window or doors | $13,800 |