Clayton Johnson Enterprises Inc
- Based in
- Morgan Hill
- On San Francisco permits
- Feb 2010 to Oct 2010
- Last 24 months
- 0 permits filed
2 permits since 2000: 1 completed, 1 never finaled.
Of the 1 never-finaled permit, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Stairs permits
2 stairs permits: 1 completed, 1 never finaled. Typically 90 days from filing to permit and 57 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Oct 13, 2010 | Completed final sign-off Jun 2011 | 91 Coleridge St | replace existing stair (wood) at rear of bldg w (n) spiral iron stair conforming to code requirements. based upon physical inspection report#cc-5688.Details
replace existing stair (wood) at rear of bldg w (n) spiral iron stair conforming to code requirements. based upon physical inspection report#cc-5688. | $5,000 |
| Feb 3, 2010 | Never finaled issued Feb 2010, no final | 91 Coleridge St | to comply w/physical inspection report cc-5688 of 12/15/09. repair rear stair (less than 50 %), ground (e) outlets, install (n) common area panel, label panels, bond w/h, replace lights, hose bibbs, rain water piping, replace p-trap, replace w/h fluestack, replace tub vent and (e) tub filler.Details
to comply w/physical inspection report cc-5688 of 12/15/09. repair rear stair (less than 50 %), ground (e) outlets, install (n) common area panel, label panels, bond w/h, replace lights, hose bibbs, rain water piping, replace p-trap, replace w/h fluestack, replace tub vent and (e) tub filler. | $15,000 |