Block 5610A, lot 019
91 Coleridge St
The city’s assessor roll has no record for this parcel.
Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
7 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Mar 20, 2012 | Never finaled issued Mar 2012, no final | 91 Coleridge St | street spaceDetails
street space | ||
| Feb 17, 2012 | Completed final sign-off May 2012 | 91 Coleridge St | Jim Lawrie Construction | remove (e) cedar shingles @ front and repair original siding as required - will reconstruct trim work based on physical evidence as found under existing shingle removed.Details
remove (e) cedar shingles @ front and repair original siding as required - will reconstruct trim work based on physical evidence as found under existing shingle removed. | $5,000 |
| Feb 16, 2012 | Never finaled issued Feb 2012, no final | 91 Coleridge St | street space permitDetails
street space permit | ||
| Oct 13, 2010 | Completed final sign-off Jun 2011 | 91 Coleridge St | Clayton Johnson Enterprises Inc | replace existing stair (wood) at rear of bldg w (n) spiral iron stair conforming to code requirements. based upon physical inspection report#cc-5688.Details
replace existing stair (wood) at rear of bldg w (n) spiral iron stair conforming to code requirements. based upon physical inspection report#cc-5688. | $5,000 |
| Feb 3, 2010 | Never finaled issued Feb 2010, no final | 91 Coleridge St | Clayton Johnson Enterprises Inc | to comply w/physical inspection report cc-5688 of 12/15/09. repair rear stair (less than 50 %), ground (e) outlets, install (n) common area panel, label panels, bond w/h, replace lights, hose bibbs, rain water piping, replace p-trap, replace w/h fluestack, replace tub vent and (e) tub filler.Details
to comply w/physical inspection report cc-5688 of 12/15/09. repair rear stair (less than 50 %), ground (e) outlets, install (n) common area panel, label panels, bond w/h, replace lights, hose bibbs, rain water piping, replace p-trap, replace w/h fluestack, replace tub vent and (e) tub filler. | $15,000 |
| Feb 22, 2008 | Never finaled issued Feb 2008, no final | 91 Coleridge St | street spaceDetails
street space | ||
| May 11, 2005 | Completed final sign-off Jun 2005 | 91 Coleridge St | Clay Young, Gen'l Contractor | repair / replace front entry stairs (to comply with) to sound conditions. maintain (e) configurationDetails
repair / replace front entry stairs (to comply with) to sound conditions. maintain (e) configuration | $7,000 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Clayton Johnson Enterprises Inc (2), Clay Young, Gen'l Contractor, Jim Lawrie Construction
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover every building: the city does not class this parcel as single-family, two-family or apartments.