City Homes Construction Inc
- Based in
- Millbrae
- On San Francisco permits
- Jun 2006 to Feb 2019
- Last 24 months
- 0 permits filed
56 permits since 2000: 53 completed, 2 never finaled, 1 expired or cancelled.
Of the 2 never-finaled permits, 1 is 5 to 10 years old, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Stairs permits
8 stairs permits: 7 completed, 1 expired or cancelled. Typically 0 days from filing to permit and 91 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Nov 16, 2011 | Expired or cancelled cancelled Apr 2016 | 31 Mallorca Wy | to comply w/complaint # 201170602 - correct existing fire escape stairs in lighwell, not visible form street & back.Details
to comply w/complaint # 201170602 - correct existing fire escape stairs in lighwell, not visible form street & back. | $3,800 |
| Apr 1, 2011 | Completed final sign-off Aug 2011 | 3471 19th St | provide new connecting stair of unit 3471 from 1st floor level to/from #3. provide a new window. convert extg ground floor/garage level half bath into full bath.Details
provide new connecting stair of unit 3471 from 1st floor level to/from #3. provide a new window. convert extg ground floor/garage level half bath into full bath. | $11,000 |
| Sep 20, 2010 | Completed final sign-off Oct 2010 | 1423 Shafter Av | repair dryrot for front stair, less than 50% being replace.Details
repair dryrot for front stair, less than 50% being replace. | $800 |
| Sep 8, 2010 | Completed final sign-off Feb 2011 | 255 17th Av | revision to 20101008068262: remove spiral stair from 1st floor to 2nd floor per plan at unit 1. relocate bath at unit 2 per plan at 2nd flDetails
revision to 20101008068262: remove spiral stair from 1st floor to 2nd floor per plan at unit 1. relocate bath at unit 2 per plan at 2nd fl | |
| Jul 27, 2009 | Completed final sign-off Dec 2009 | 2941 Pine St | remodel (e) rear cottage. remove (e) exterior stairs to 2nd fl. remove (e) interior spiral stairs and replace with (n) l-shape stairs. remodel (e) full bathroom on first fl. increase 1st floor height from 7' to 8'-0"Details
remodel (e) rear cottage. remove (e) exterior stairs to 2nd fl. remove (e) interior spiral stairs and replace with (n) l-shape stairs. remodel (e) full bathroom on first fl. increase 1st floor height from 7' to 8'-0" | $22,000 |
| Apr 28, 2009 | Completed final sign-off May 2009 | 2011 28th Av | replace two windows in rear house (same size same location) repair the inside stair (25%) treadsDetails
replace two windows in rear house (same size same location) repair the inside stair (25%) treads | $2,800 |
| Nov 13, 2007 | Completed final sign-off Feb 2008 | 1407 Shafter Av | repair 4 windows (wood) & repair 40% of the stair at front house. replace 2 windows a sling door (vinyl) & repair the dryrot for stair & siding 40% at rear house. stair repair beyond 50% requires plans.Details
repair 4 windows (wood) & repair 40% of the stair at front house. replace 2 windows a sling door (vinyl) & repair the dryrot for stair & siding 40% at rear house. stair repair beyond 50% requires plans. | $8,000 |
| Jun 28, 2007 | Completed final sign-off Aug 2007 | 1339 Gilman Av | repair the siding & dryrot, replace 1 window vinyl at rear of the house. in kind repair front stair & deck .40%Details
repair the siding & dryrot, replace 1 window vinyl at rear of the house. in kind repair front stair & deck .40% | $4,000 |