Back to bathroom remodel contractors
City Homes Construction Inc
- Based in
- Millbrae
- On San Francisco permits
- Jun 2006 to Feb 2019
- Last 24 months
- 0 permits filed
56 permits since 2000: 53 completed, 2 never finaled, 1 expired or cancelled.
Of the 2 never-finaled permits, 1 is 5 to 10 years old, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
23 bathroom remodel permits: 23 completed. Typically 0 days from filing to permit and 111 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 18, 2011 | Completed final sign-off Dec 2011 | 36 Pope St | revision to approved plans bpa#2010/0527/3409: reconfigure bathroom layout at layout, change sliding door into 6'x 4' window,change location of 2nd floor master bedroom and relocate window for adjustment.Details
revision to approved plans bpa#2010/0527/3409: reconfigure bathroom layout at layout, change sliding door into 6'x 4' window,change location of 2nd floor master bedroom and relocate window for adjustment. | |
| May 6, 2011 | Completed final sign-off Jul 2011 | 67 Aquavista Wy | add a new bedroom, a family room and a bathroom at ground floor.Details
add a new bedroom, a family room and a bathroom at ground floor. | $25,000 |
| Apr 1, 2011 | Completed final sign-off Aug 2011 | 3471 19th St | provide new connecting stair of unit 3471 from 1st floor level to/from #3. provide a new window. convert extg ground floor/garage level half bath into full bath.Details
provide new connecting stair of unit 3471 from 1st floor level to/from #3. provide a new window. convert extg ground floor/garage level half bath into full bath. | $11,000 |
| Feb 14, 2011 | Completed final sign-off May 2011 | 536 40th Av | remodel existing kitchen & restrooms. kitchen: at least 50% high efficency lighting. bathroom: high efficency or occupancy sensor.Details
remodel existing kitchen & restrooms. kitchen: at least 50% high efficency lighting. bathroom: high efficency or occupancy sensor. | $5,600 |
| Feb 10, 2011 | Completed final sign-off May 2011 | 381 San Benito Wy | remodel extg bathroom on 1st floor and add a new bedroom on 1st floor.Details
remodel extg bathroom on 1st floor and add a new bedroom on 1st floor. | $12,000 |
| Jan 11, 2011 | Completed final sign-off Mar 2011 | 715 Myra Wy | remodel kitchen and 2 bathrooms at 2nd flr, replace 6 windows at side and rear of the house (vinyl windows) not visible from street, min u factor u.40 lighting to comply with cec 150(k)Details
remodel kitchen and 2 bathrooms at 2nd flr, replace 6 windows at side and rear of the house (vinyl windows) not visible from street, min u factor u.40 lighting to comply with cec 150(k) | $23,000 |
| Dec 30, 2010 | Completed final sign-off Apr 2011 | 2036 14th Av | remodeling a kitchen and 2 bathroomsDetails
remodeling a kitchen and 2 bathrooms | $20,000 |
| Dec 28, 2010 | Completed final sign-off May 2011 | 381 San Benito Wy | remodel (e) kitchen, master bathroom, children's bathroom. put in new powder room and french door on 1st fl (e) den. legalize (e) bathroom and study room on ground floor.Details
remodel (e) kitchen, master bathroom, children's bathroom. put in new powder room and french door on 1st fl (e) den. legalize (e) bathroom and study room on ground floor. | $35,000 |
| Sep 8, 2010 | Completed final sign-off Feb 2011 | 255 17th Av | revision to 20101008068262: remove spiral stair from 1st floor to 2nd floor per plan at unit 1. relocate bath at unit 2 per plan at 2nd flDetails
revision to 20101008068262: remove spiral stair from 1st floor to 2nd floor per plan at unit 1. relocate bath at unit 2 per plan at 2nd fl | |
| Apr 23, 2010 | Completed final sign-off Dec 2010 | 31 Mallorca Wy | scope of work-legalize (e) family room & bathroom on 1st floor belongs/part of 31 mallorca way, remodel kitchen, bathroom, powder room on both units 31 & 33, full seismic upgrade of structureDetails
scope of work-legalize (e) family room & bathroom on 1st floor belongs/part of 31 mallorca way, remodel kitchen, bathroom, powder room on both units 31 & 33, full seismic upgrade of structure | $50,000 |
| Mar 1, 2010 | Completed final sign-off Dec 2010 | 31 Mallorca Wy | remodel existing kitchen and bath on both units. repair living and dining room walls. remove partial sheetrock on 3 walls to be repaired in kind. total: 2 kitchens and baths. lighting per cec 150 k. no change to exhaust systemDetails
remodel existing kitchen and bath on both units. repair living and dining room walls. remove partial sheetrock on 3 walls to be repaired in kind. total: 2 kitchens and baths. lighting per cec 150 k. no change to exhaust system | $58,000 |
| Jan 26, 2010 | Completed final sign-off Feb 2010 | 130 09th Av | kitchen & bathroom remodeling-add a sink at 1/2 bathroom & replace the (e) furnace. no moving or adding wallsDetails
kitchen & bathroom remodeling-add a sink at 1/2 bathroom & replace the (e) furnace. no moving or adding walls | $13,000 |
| Sep 30, 2009 | Completed final sign-off Nov 2009 | 1800 Pacific Av | unit #1002-take care of nov# 200914321-remove washer & dryer hook up & electrical outlet in the guest bathroom. comply with nov# 200914321 dated 8-3-09. no adding or moving wallsDetails
unit #1002-take care of nov# 200914321-remove washer & dryer hook up & electrical outlet in the guest bathroom. comply with nov# 200914321 dated 8-3-09. no adding or moving walls | $4,500 |
| Jul 27, 2009 | Completed final sign-off Dec 2009 | 2941 Pine St | remodel (e) rear cottage. remove (e) exterior stairs to 2nd fl. remove (e) interior spiral stairs and replace with (n) l-shape stairs. remodel (e) full bathroom on first fl. increase 1st floor height from 7' to 8'-0"Details
remodel (e) rear cottage. remove (e) exterior stairs to 2nd fl. remove (e) interior spiral stairs and replace with (n) l-shape stairs. remodel (e) full bathroom on first fl. increase 1st floor height from 7' to 8'-0" | $22,000 |
| Apr 6, 2009 | Completed final sign-off Jul 2009 | 3934 Ortega St | remodel extg kitchen, bathroom on 2nd floor and add new bathroom on 1st floorDetails
remodel extg kitchen, bathroom on 2nd floor and add new bathroom on 1st floor | $25,000 |
| Mar 13, 2009 | Completed final sign-off Jun 2009 | 24 Castle Manor Av | to comply w/complaint #200994561 - remodel ground floor including add playroom, bedroom, two storage rooms & full bath.Details
to comply w/complaint #200994561 - remodel ground floor including add playroom, bedroom, two storage rooms & full bath. | $45,000 |
| Mar 10, 2008 | Completed final sign-off May 2008 | 1383 Quesada Av | replace 5 windows at front and 12 windows (vinyl) at side and rear of the house. remodel kitchen and bathroom.Details
replace 5 windows at front and 12 windows (vinyl) at side and rear of the house. remodel kitchen and bathroom. | $25,000 |
| Dec 21, 2007 | Completed final sign-off Jun 2008 | 860 Head St | remodel (e) kitchen, 3 bathrooms, delete 2 closets on the 2nd floor and add 2 closets on the same floor. convert (e) exercise room to master bedroom with bath and closet. replace partial (e) concrete foundation, remove post and reinforce (e) beam, add a 22' x4' rear deck approximately 6' above.Details
remodel (e) kitchen, 3 bathrooms, delete 2 closets on the 2nd floor and add 2 closets on the same floor. convert (e) exercise room to master bedroom with bath and closet. replace partial (e) concrete foundation, remove post and reinforce (e) beam, add a 22' x4' rear deck approximately 6' above. | $30,000 |
| Dec 20, 2007 | Completed final sign-off May 2008 | 4600 Ocean Av | add a full bath in (e) garage.Details
add a full bath in (e) garage. | $9,685 |
| Mar 27, 2007 | Completed final sign-off Jul 2007 | 1900 29th Av | remodel (1) kitchen, bedroom on second floor. add flat skylight & 1 new bathroom.Details
remodel (1) kitchen, bedroom on second floor. add flat skylight & 1 new bathroom. | $25,000 |
| Mar 16, 2007 | Completed final sign-off Sep 2007 | 519 Brunswick St | add 2 bedroom, 1 family room and 1-1/2 bath at ground floor.Details
add 2 bedroom, 1 family room and 1-1/2 bath at ground floor. | $25,000 |
| Mar 16, 2007 | Completed final sign-off Apr 2007 | 229 Victoria St | add family room and bath at ground floor with interior connection to upper floor.Details
add family room and bath at ground floor with interior connection to upper floor. | $20,000 |
| Sep 8, 2006 | Completed final sign-off Mar 2007 | 774 40th Av | add rooms at ground floor, remodel existing kitchen, bathr and add a (o bath 2nd floor, replace rear 2nd floor bed room windows total 6 windows all in kindDetails
add rooms at ground floor, remodel existing kitchen, bathr and add a (o bath 2nd floor, replace rear 2nd floor bed room windows total 6 windows all in kind | $30,000 |