Back to kitchen remodel contractors
Citidev Inc.
- Based in
- San Francisco
- On San Francisco permits
- Dec 2007 to Aug 2026
- Last 24 months
- 33 permits filed
208 permits since 2000: 161 completed, 19 in progress, 9 never finaled, 19 expired or cancelled.
Of the 9 never-finaled permits, 3 are 3 to 5 years old, 5 are 5 to 10 years old, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
43 kitchen remodel permits: 39 completed, 2 in progress, 2 never finaled. Typically 1 days from filing to permit and 335 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 28, 2026 | In progress issued Aug 2026 | 711 Marina Bl | remodel kitchen with cabinets, counters, tile, appliances and plumbing fixtures in kind.Details
remodel kitchen with cabinets, counters, tile, appliances and plumbing fixtures in kind. | $125,000 |
| Dec 16, 2025 | In progress issued Feb 2026 | 3352 Market St | interior renovation and small rear addition totaling 32 sq ft. this work includes new finishes, fixtures, casework, lighting, plumbing, and electircal at the kitchen, bath #1 and bath #2. will required electrical panel upgrade and full remodel of knob and tube. new siding at the facade attached to..Details
interior renovation and small rear addition totaling 32 sq ft. this work includes new finishes, fixtures, casework, lighting, plumbing, and electircal at the kitchen, bath #1 and bath #2. will required electrical panel upgrade and full remodel of knob and tube. new siding at the facade attached to.. | $650,000 |
| Sep 29, 2025 | Completed final sign-off Feb 2026 | 3649 21st St | remodel of (e) kitchen. all fixtures to be replaced in-kind. no removal of wallsDetails
remodel of (e) kitchen. all fixtures to be replaced in-kind. no removal of walls | $35,000 |
| Jan 2, 2025 | Completed final sign-off Oct 2025 | 3607 Folsom St | replace kitchen cabinets in kind, new countertops, backsplash, appliances. replace bathroom fixtures in kind, new tile.Details
replace kitchen cabinets in kind, new countertops, backsplash, appliances. replace bathroom fixtures in kind, new tile. | $75,000 |
| Mar 22, 2024 | Completed final sign-off Oct 2025 | 71 Jordan Av | (n) kitchen pantry, fireplace stone; (n) millwork for fireplace, powder, laundry, primary bath. painting of kitchen cabinets; (n) front door, new gas firepit in backyard replace in kind. millwork for front living room and family lounge; new wine fridge in basement, new light pendants in kitchen, newDetails
(n) kitchen pantry, fireplace stone; (n) millwork for fireplace, powder, laundry, primary bath. painting of kitchen cabinets; (n) front door, new gas firepit in backyard replace in kind. millwork for front living room and family lounge; new wine fridge in basement, new light pendants in kitchen, new | $250,000 |
| Jan 25, 2024 | Completed final sign-off Jan 2025 | 3240 Sacramento St | demo (e) kitchen cabinets, countertops, appliances, drywall and replace in kind. (n) can lights @ kitchen and bfreakfast room. (n) h.w. floor @ kitchen, hallway, living and media room. replace (e) toilet @ powder room, (n) gas line for insert @ livingroom.Details
demo (e) kitchen cabinets, countertops, appliances, drywall and replace in kind. (n) can lights @ kitchen and bfreakfast room. (n) h.w. floor @ kitchen, hallway, living and media room. replace (e) toilet @ powder room, (n) gas line for insert @ livingroom. | $310,000 |
| Oct 25, 2022 | Completed final sign-off Apr 2024 | 653 Duncan St | interior kitchen, bath remodel at floor 1,2 3. exterior windows, guardrail, entry gate throughoutDetails
interior kitchen, bath remodel at floor 1,2 3. exterior windows, guardrail, entry gate throughout | $250,000 |
| May 11, 2021 | Completed final sign-off Nov 2021 | 1066 14th St | kitchen remodel in kind. new cabinets, countertop, wood flooring, add hood vent, trim,paint. reuse appliancesDetails
kitchen remodel in kind. new cabinets, countertop, wood flooring, add hood vent, trim,paint. reuse appliances | $30,000 |
| Aug 26, 2020 | Completed final sign-off Feb 2021 | 2196 Hayes St | kitchen remodel in kind with new cabinets, fixtures, appliances and counters, powder bath remodel in kind with new toilet and vanity, refinish floorsDetails
kitchen remodel in kind with new cabinets, fixtures, appliances and counters, powder bath remodel in kind with new toilet and vanity, refinish floors | $100,000 |
| Aug 26, 2020 | Completed final sign-off Aug 2021 | 3620 19th St | unit #23: remodel kitchen in kind with new appliances, cabinets, counters, replace trim and hardwood floors throughout, replace 2 bath toilets and vanities in kindDetails
unit #23: remodel kitchen in kind with new appliances, cabinets, counters, replace trim and hardwood floors throughout, replace 2 bath toilets and vanities in kind | $120,000 |
| Aug 18, 2020 | Completed final sign-off Feb 2022 | 31 Carver St | replace water damage finishes in kind. flooring, kitchen cabinets, 2 bath fixtures, light fixtures, asll work on 1st fl and basmementDetails
replace water damage finishes in kind. flooring, kitchen cabinets, 2 bath fixtures, light fixtures, asll work on 1st fl and basmement | $165,000 |
| Jul 13, 2020 | Completed final sign-off Jan 2021 | 880 Castro St | kitchen (10'x10') & bathroom (8'x10') remodel: replace kitchen cabinets and appliances in kind. replace bathroom fixtures (toilet, double vanity, shower valve & shower head) in kind . no structural work.Details
kitchen (10'x10') & bathroom (8'x10') remodel: replace kitchen cabinets and appliances in kind. replace bathroom fixtures (toilet, double vanity, shower valve & shower head) in kind . no structural work. | $120,000 |
| Aug 22, 2019 | Never finaled issued Aug 2019, no final | 30 Presidio Av | replace drywall at office area due to mold from water penetration. replace dry wall with lath and plaster in kitchen, family room. add laundry to storage room at basement level.Details
replace drywall at office area due to mold from water penetration. replace dry wall with lath and plaster in kitchen, family room. add laundry to storage room at basement level. | $3,500 |
| Apr 15, 2019 | Never finaled issued Apr 2019, no final | 30 Presidio Av | change (e) kitchen cabinets and appliances in kind. 20x12 change 4.5 bathroom fixtures in kind. e. tile. bath 1 6x12, bath 2 10x10, bath 3 6x8, bath 4 8x8. 1/2 3x7Details
change (e) kitchen cabinets and appliances in kind. 20x12 change 4.5 bathroom fixtures in kind. e. tile. bath 1 6x12, bath 2 10x10, bath 3 6x8, bath 4 8x8. 1/2 3x7 | $205,000 |
| Mar 7, 2019 | Completed final sign-off Jun 2019 | 1101 Powhattan Av | repalce (e) cabinets in kind in kitchen, replace (e) appliances in kind in kitchen, replace (e) coutner tops in kitchen, approx 12x12Details
repalce (e) cabinets in kind in kitchen, replace (e) appliances in kind in kitchen, replace (e) coutner tops in kitchen, approx 12x12 | $40,000 |
| Jan 15, 2019 | Completed final sign-off Nov 2019 | 260 08th St | new accessible restrooms, & new non-accessible restrooms. two new kitchenettes. remove partion walls at 1st fl & at mezzanine. new guardrail at mezz. new interior stairs to mezz. replace some post & beams at mezz framing. voluntary roof framing upgrade. new lighting & heating. maher naDetails
new accessible restrooms, & new non-accessible restrooms. two new kitchenettes. remove partion walls at 1st fl & at mezzanine. new guardrail at mezz. new interior stairs to mezz. replace some post & beams at mezz framing. voluntary roof framing upgrade. new lighting & heating. maher na | $90,000 |
| Jan 22, 2018 | Completed final sign-off Jun 2018 | 1 South Park | unit #301 -change 6' tall peninsula to counter hgt peninsula in the same location. replace (e) appliances in kind in kitchen maher naDetails
unit #301 -change 6' tall peninsula to counter hgt peninsula in the same location. replace (e) appliances in kind in kitchen maher na | $20,000 |
| Oct 26, 2017 | Completed final sign-off Jan 2018 | 77 Jordan Av | revision to pa#201609208174. voluntary partial foundation replacement at rear of building (under kitchen/family rm). maher naDetails
revision to pa#201609208174. voluntary partial foundation replacement at rear of building (under kitchen/family rm). maher na | $15,000 |
| Jul 5, 2017 | Completed final sign-off Oct 2018 | 2785 Jackson St | unit 4 - remodel (e) kitchen, baths, new powder room, no work outside of unit. n/a ordinance #155-13Details
unit 4 - remodel (e) kitchen, baths, new powder room, no work outside of unit. n/a ordinance #155-13 | $40,000 |
| Mar 2, 2017 | Completed final sign-off Feb 2018 | 2927 Broderick St | ground flr: remove (e) brick flue, install new wood framing and concrete footing. at 3rd flr - remove brick ewe and portion of interior walls. install new posts & beams. renovate kitchen, bath and half bathDetails
ground flr: remove (e) brick flue, install new wood framing and concrete footing. at 3rd flr - remove brick ewe and portion of interior walls. install new posts & beams. renovate kitchen, bath and half bath | $70,000 |
| Mar 2, 2017 | Completed final sign-off Feb 2018 | 2929 Broderick St | 2nd flr: remove (e) brick flue and portion of interior walls. install new posts & beams. relocate & remodel kitchen, renovate bathroomDetails
2nd flr: remove (e) brick flue and portion of interior walls. install new posts & beams. relocate & remodel kitchen, renovate bathroom | $65,000 |
| Sep 20, 2016 | Completed final sign-off Jan 2018 | 77 Jordan Av | alteration to existing 2nd floor only: reconfigure kitchen, recongigure windows & doors @ rear only, add powder room, laundry. n/a maher ordinanceDetails
alteration to existing 2nd floor only: reconfigure kitchen, recongigure windows & doors @ rear only, add powder room, laundry. n/a maher ordinance | $85,000 |
| Apr 8, 2016 | Completed final sign-off Oct 2017 | 300 Coleridge St | revision to #2014-0502-4740-ground flr soft story seismic upgrade: replace moment frames w/shear walls. (n) voluntary stiffening @ upper flr's. @ garage add (n) posts & shear walls & relocate concrete retaining wall. at 3302 unit change location of kitchen & bedrm. (n) opening @ kitchen.Details
revision to #2014-0502-4740-ground flr soft story seismic upgrade: replace moment frames w/shear walls. (n) voluntary stiffening @ upper flr's. @ garage add (n) posts & shear walls & relocate concrete retaining wall. at 3302 unit change location of kitchen & bedrm. (n) opening @ kitchen. | |
| Dec 30, 2015 | Completed final sign-off Apr 2016 | 178 Ripley St | replace kitchen cabinets and appliances, in-kind.Details
replace kitchen cabinets and appliances, in-kind. | $50,000 |
| Dec 30, 2015 | Completed final sign-off Oct 2017 | 300 Coleridge St | per ordinance# 30-15, rev to permit #201405024740. convert (e) garage into new dwelling unit at 1st fl. new kitchen, bath & laundry at new unit. new windows & exterior door at new unit. fill in under (e) conditioned space at rear yard less than 12 ft above grade. sprinklers under separate permit.Details
per ordinance# 30-15, rev to permit #201405024740. convert (e) garage into new dwelling unit at 1st fl. new kitchen, bath & laundry at new unit. new windows & exterior door at new unit. fill in under (e) conditioned space at rear yard less than 12 ft above grade. sprinklers under separate permit. | $85,000 |
| Sep 3, 2015 | Completed final sign-off Oct 2017 | 143 Laidley St | ref #201409257339. excavate @ 1st fl to claim/condition/enclose area under deck & under kitchen (bet kitchen & garage). (n) space to include utility rm, gym,laundry,hall closet, master bath & master dressing. add ibp glasswalk panel @ deck fl on 2nd level courtyard-over skylight @ roof.Details
ref #201409257339. excavate @ 1st fl to claim/condition/enclose area under deck & under kitchen (bet kitchen & garage). (n) space to include utility rm, gym,laundry,hall closet, master bath & master dressing. add ibp glasswalk panel @ deck fl on 2nd level courtyard-over skylight @ roof. | $100,000 |
| Feb 5, 2015 | Completed final sign-off Oct 2015 | 489 Elizabeth St | revision to #2014.0620.9030 & 2014.0626.9519: new lighting cans, fixtures on loft landing & guest bedrm @ 3rd flr. new kitchen cainets & appliances in kind,new lighting cans & fixtures,new plbg fixtures @ powder rm in kind,new bar sink,new drywall,new fireplace,new glass guardrail,stair @ 2nd flrDetails
revision to #2014.0620.9030 & 2014.0626.9519: new lighting cans, fixtures on loft landing & guest bedrm @ 3rd flr. new kitchen cainets & appliances in kind,new lighting cans & fixtures,new plbg fixtures @ powder rm in kind,new bar sink,new drywall,new fireplace,new glass guardrail,stair @ 2nd flr | $210,000 |
| Aug 4, 2014 | Completed final sign-off Nov 2015 | 1 South Park | relocate non structural walls. relocate e kitchen. new fixues for 2 bathrooms. replace mechanical systemDetails
relocate non structural walls. relocate e kitchen. new fixues for 2 bathrooms. replace mechanical system | $175,000 |
| Dec 3, 2013 | Completed final sign-off Mar 2015 | 83 Divisadero St | renovate 2 existing bathrooms. renovate 1/2 bath. new laundry room. new lighting in kitchen, living, dining, bedrooms, and officesDetails
renovate 2 existing bathrooms. renovate 1/2 bath. new laundry room. new lighting in kitchen, living, dining, bedrooms, and offices | $200,000 |
| Apr 5, 2013 | Completed final sign-off Jul 2013 | 2257 Filbert St | interior remodel only-remove kitchen on ground level, no addition, no alterations at side line walls within 5' of property lines. reconfigure (e) bathroom & closet/bedroom on ground level. new electrical at bathroom ground level, no work to 3rd level, new steel beam to supportDetails
interior remodel only-remove kitchen on ground level, no addition, no alterations at side line walls within 5' of property lines. reconfigure (e) bathroom & closet/bedroom on ground level. new electrical at bathroom ground level, no work to 3rd level, new steel beam to support | $15,000 |
| Feb 15, 2013 | Completed final sign-off Nov 2015 | 1731 Larkin St | interior remodel of 6 dwellings units. 6 bath remodels, 6 new baths, 6 kitchen remodel, 6 new laundry. new skylights at 4th fl units. structural wok at 1st fl. new moment frames, new beams, posts and footings. no exterior work.Details
interior remodel of 6 dwellings units. 6 bath remodels, 6 new baths, 6 kitchen remodel, 6 new laundry. new skylights at 4th fl units. structural wok at 1st fl. new moment frames, new beams, posts and footings. no exterior work. | $250,000 |
| Oct 23, 2012 | Completed final sign-off Apr 2015 | 1049 Church St | basement build-out. new rear addition, excavate new driveway, full interior remodel include new kitchen, new bathrooms, new laundry room, new powder room, new fixtures, new heating & hot water, new finishes throughout, new garage including garage door opening to front elevation.Details
basement build-out. new rear addition, excavate new driveway, full interior remodel include new kitchen, new bathrooms, new laundry room, new powder room, new fixtures, new heating & hot water, new finishes throughout, new garage including garage door opening to front elevation. | $379,956 |
| Apr 18, 2012 | Completed final sign-off Aug 2013 | 2825 Greenwich St | redistribute units: one behind garage one at upper levels. replace all windows with insulated wood windows. 2 new/reconfig kitchens, 4 new reconfig full baths and 1 powder, reconfigure stairs throught,claim breezway at garage, infill one lightwell, reshape western lightwell, infill under rearDetails
redistribute units: one behind garage one at upper levels. replace all windows with insulated wood windows. 2 new/reconfig kitchens, 4 new reconfig full baths and 1 powder, reconfigure stairs throught,claim breezway at garage, infill one lightwell, reshape western lightwell, infill under rear | $250,000 |
| Mar 23, 2012 | Completed final sign-off May 2013 | 2374 Greenwich St | 1st fl-repl garage door, add new doors, bathrm, interior stairs, interior walls at garage. wall & roof in lightwell 1st fl only. 2nd fl-renovate 2 bathrooms, add new bathroom, remodel kitchen, stairs. roof-new deck & stairsDetails
1st fl-repl garage door, add new doors, bathrm, interior stairs, interior walls at garage. wall & roof in lightwell 1st fl only. 2nd fl-renovate 2 bathrooms, add new bathroom, remodel kitchen, stairs. roof-new deck & stairs | $345,000 |
| Feb 29, 2012 | Completed final sign-off Aug 2012 | 2641 Union St | remodeling kitchen and (2) second floor bathrooms.new entry door. relocate washer and dryer. new decorative appliance.Details
remodeling kitchen and (2) second floor bathrooms.new entry door. relocate washer and dryer. new decorative appliance. | $110,000 |
| Jun 14, 2011 | Completed final sign-off Jan 2012 | 765 Market St | change (e) kitchen cabinets in kind, repl master bathrm and 2nd bathrm fixtures in kind, new tile at shower and tub areas, in master bath and 2nd bathDetails
change (e) kitchen cabinets in kind, repl master bathrm and 2nd bathrm fixtures in kind, new tile at shower and tub areas, in master bath and 2nd bath | $60,000 |
| Jun 14, 2011 | Completed final sign-off Jun 2011 | 1 South Park | replace existing exterior kitchen cabinets and appliances in kind, no lighting workDetails
replace existing exterior kitchen cabinets and appliances in kind, no lighting work | $9,000 |
| Apr 29, 2011 | Completed final sign-off Feb 2012 | 2004 19th St | work on #2004 only - 1) remodel (e) master bath, 2) remodel (e) guest bath, 3) remodel (e) kitchen, 4) replace 2 (e) fireplaces, 5) new doors at (e) closets and baths.Details
work on #2004 only - 1) remodel (e) master bath, 2) remodel (e) guest bath, 3) remodel (e) kitchen, 4) replace 2 (e) fireplaces, 5) new doors at (e) closets and baths. | $18,000 |
| Jan 3, 2011 | Completed final sign-off Apr 2011 | 255 Berry St | remodeling of 2 bathrooms and 1 kitchen in kind, repl cabinets, retile, new plumbing fixtures, new electrical fixturds, paint, 200 sq.ft. total ; kitchen- min 50% light watt in high efficiency light, bath, high efficiency lights or manual on occupancy sensorDetails
remodeling of 2 bathrooms and 1 kitchen in kind, repl cabinets, retile, new plumbing fixtures, new electrical fixturds, paint, 200 sq.ft. total ; kitchen- min 50% light watt in high efficiency light, bath, high efficiency lights or manual on occupancy sensor | $30,000 |
| Jun 16, 2010 | Completed final sign-off May 2011 | 1 South Park | tenant improvemnet of condominium unit#407 renovation to include finish 1-kitchen, finish 3-bathrooms, (n) lighting, (n) interior finishes, relocating (e) mechanical units.Details
tenant improvemnet of condominium unit#407 renovation to include finish 1-kitchen, finish 3-bathrooms, (n) lighting, (n) interior finishes, relocating (e) mechanical units. | $200,000 |
| Feb 2, 2010 | Completed final sign-off Mar 2011 | 1808 Greenwich St | level#1: legalize (e) bath, living space, closet. level#2: renovate kitchen, bed & bath, replace fireplace, remove portion of wall at kitchen, add beam.Details
level#1: legalize (e) bath, living space, closet. level#2: renovate kitchen, bed & bath, replace fireplace, remove portion of wall at kitchen, add beam. | $121,000 |
| Dec 11, 2009 | Completed final sign-off Sep 2010 | 1426 Jackson St | new wall at level 1 for storage, new bath, closets, new remodeled kitchen and bath fixtures in lvl 2; relocate bath, add (n) bath, new remodeled kitchen and bath fixtures in levels 3 &4. remove int. partitions at kitch. & dining lvle 2,3,4. new lighting & electrical.Details
new wall at level 1 for storage, new bath, closets, new remodeled kitchen and bath fixtures in lvl 2; relocate bath, add (n) bath, new remodeled kitchen and bath fixtures in levels 3 &4. remove int. partitions at kitch. & dining lvle 2,3,4. new lighting & electrical. | $280,000 |
| Sep 5, 2008 | Completed final sign-off Mar 2010 | 713 Shrader St | kitchen remodel - change kitchen cabinets & applicances in kind - no structural work.Details
kitchen remodel - change kitchen cabinets & applicances in kind - no structural work. | $30,000 |