Back to bathroom remodel contractors
Citidev Inc.
- Based in
- San Francisco
- On San Francisco permits
- Dec 2007 to Aug 2026
- Last 24 months
- 33 permits filed
208 permits since 2000: 161 completed, 19 in progress, 9 never finaled, 19 expired or cancelled.
Of the 9 never-finaled permits, 3 are 3 to 5 years old, 5 are 5 to 10 years old, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
55 bathroom remodel permits: 46 completed, 5 in progress, 4 never finaled. Typically 1 days from filing to permit and 328 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 7, 2026 | In progress issued Aug 2026 | 212 States St | replace existing decomposed foundation at existiing bathroom. no change to layout. no change to use. no exterior work.Details
replace existing decomposed foundation at existiing bathroom. no change to layout. no change to use. no exterior work. | $30,000 |
| Jun 23, 2026 | In progress issued Jun 2026 | 3352 Market St | revision to 202512161885 adding a grade beam below a shear wall on the existing structural plan. engineer assumed e foundation adequate for support but not deep enough. plumbingb fixtures in e downstiars bath are directly on ltop of new grade beam location so had to remove for access and reinstallDetails
revision to 202512161885 adding a grade beam below a shear wall on the existing structural plan. engineer assumed e foundation adequate for support but not deep enough. plumbingb fixtures in e downstiars bath are directly on ltop of new grade beam location so had to remove for access and reinstall | $25,000 |
| Jun 15, 2026 | In progress issued Jun 2026 | 212 States St | bathroom remodel: remove and replace plumbing fixtures, in-kind. tub converted to shower. no removal of any walls.Details
bathroom remodel: remove and replace plumbing fixtures, in-kind. tub converted to shower. no removal of any walls. | $30,000 |
| May 7, 2026 | Completed final sign-off Aug 2026 | 130 Amber Dr | remodel bathroom, replace fixtures in kind, no removal on walls. replace 1 window back of bldg, non street facing.Details
remodel bathroom, replace fixtures in kind, no removal on walls. replace 1 window back of bldg, non street facing. | $50,000 |
| Dec 16, 2025 | In progress issued Feb 2026 | 3352 Market St | interior renovation and small rear addition totaling 32 sq ft. this work includes new finishes, fixtures, casework, lighting, plumbing, and electircal at the kitchen, bath #1 and bath #2. will required electrical panel upgrade and full remodel of knob and tube. new siding at the facade attached to..Details
interior renovation and small rear addition totaling 32 sq ft. this work includes new finishes, fixtures, casework, lighting, plumbing, and electircal at the kitchen, bath #1 and bath #2. will required electrical panel upgrade and full remodel of knob and tube. new siding at the facade attached to.. | $650,000 |
| Sep 29, 2025 | Completed final sign-off Dec 2025 | 130 Amber Dr | remodel of bathroom, replace fixtures in-kind. no removal of wallsDetails
remodel of bathroom, replace fixtures in-kind. no removal of walls | $20,000 |
| Jun 10, 2025 | In progress issued Jun 2025 | 829 Rhode Island St | remodel shower at ground floor bathroom, including floor + wall tiles. rev pa 202411215512.Details
remodel shower at ground floor bathroom, including floor + wall tiles. rev pa 202411215512. | $7,500 |
| Mar 3, 2025 | Completed final sign-off Nov 2025 | 3240 Sacramento St | remodel of 2 bathrooms, replace all fixtures in kind. bathroom 1 has toilet, tub & single vanity. bathroom 2 has toilet, shower and double vanity. no wall removal other than partition in bathroom 1 (between w.c. and lavatory)Details
remodel of 2 bathrooms, replace all fixtures in kind. bathroom 1 has toilet, tub & single vanity. bathroom 2 has toilet, shower and double vanity. no wall removal other than partition in bathroom 1 (between w.c. and lavatory) | $75,000 |
| Jan 2, 2025 | Completed final sign-off Oct 2025 | 3607 Folsom St | replace kitchen cabinets in kind, new countertops, backsplash, appliances. replace bathroom fixtures in kind, new tile.Details
replace kitchen cabinets in kind, new countertops, backsplash, appliances. replace bathroom fixtures in kind, new tile. | $75,000 |
| Mar 22, 2024 | Completed final sign-off Oct 2025 | 71 Jordan Av | (n) kitchen pantry, fireplace stone; (n) millwork for fireplace, powder, laundry, primary bath. painting of kitchen cabinets; (n) front door, new gas firepit in backyard replace in kind. millwork for front living room and family lounge; new wine fridge in basement, new light pendants in kitchen, newDetails
(n) kitchen pantry, fireplace stone; (n) millwork for fireplace, powder, laundry, primary bath. painting of kitchen cabinets; (n) front door, new gas firepit in backyard replace in kind. millwork for front living room and family lounge; new wine fridge in basement, new light pendants in kitchen, new | $250,000 |
| Feb 13, 2024 | Completed final sign-off May 2024 | 2785 Jackson St | unit 5: bathroom 1: replace vanity, shower tile and fixtures in kind. bathroom 2: replace vanity, toilet and plumbing fixtures in kind.Details
unit 5: bathroom 1: replace vanity, shower tile and fixtures in kind. bathroom 2: replace vanity, toilet and plumbing fixtures in kind. | $30,000 |
| Oct 25, 2022 | Completed final sign-off Apr 2024 | 653 Duncan St | interior kitchen, bath remodel at floor 1,2 3. exterior windows, guardrail, entry gate throughoutDetails
interior kitchen, bath remodel at floor 1,2 3. exterior windows, guardrail, entry gate throughout | $250,000 |
| Apr 22, 2022 | Completed final sign-off Dec 2023 | 3875 Clay St | replace extg double hung wood sachs at front and sides with new wood sash, bathroom window glass to be tempered. revision to pa#202201276748. tot of 20 windows.Details
replace extg double hung wood sachs at front and sides with new wood sash, bathroom window glass to be tempered. revision to pa#202201276748. tot of 20 windows. | $49,000 |
| Jan 27, 2022 | Completed final sign-off Dec 2023 | 3875 Clay St | 1) at 1st flr, expand toilet rm and turn into bathrm. 2) at 2nd flr, turrn bath into laundry rm & toilet rm. 3) at 3rd flr, remodel 3 existing bathrooms, 4) relocate one furnace from garage to attic with (n) ducts.Details
1) at 1st flr, expand toilet rm and turn into bathrm. 2) at 2nd flr, turrn bath into laundry rm & toilet rm. 3) at 3rd flr, remodel 3 existing bathrooms, 4) relocate one furnace from garage to attic with (n) ducts. | $55,000 |
| Jan 26, 2022 | Never finaled issued Jan 2022, no final | 31 Carver St | rev to pa201807205151: remove 2 (n) skylihgts from scope on g/f bathroom (106/107) & north section of roof (108 & 109), skylight 110 to remain (0pposite stair).Details
rev to pa201807205151: remove 2 (n) skylihgts from scope on g/f bathroom (106/107) & north section of roof (108 & 109), skylight 110 to remain (0pposite stair). | |
| Jun 24, 2021 | Completed final sign-off Sep 2021 | 2442 Great Hy | unit 2: remodel (e) bathroom in-kind, carpeting and paint. unit 4: remodel (e) bathroom in-kind, carpeting, paint.Details
unit 2: remodel (e) bathroom in-kind, carpeting and paint. unit 4: remodel (e) bathroom in-kind, carpeting, paint. | $80,000 |
| Aug 26, 2020 | Completed final sign-off Feb 2021 | 2196 Hayes St | kitchen remodel in kind with new cabinets, fixtures, appliances and counters, powder bath remodel in kind with new toilet and vanity, refinish floorsDetails
kitchen remodel in kind with new cabinets, fixtures, appliances and counters, powder bath remodel in kind with new toilet and vanity, refinish floors | $100,000 |
| Aug 26, 2020 | Completed final sign-off Aug 2021 | 3620 19th St | unit #23: remodel kitchen in kind with new appliances, cabinets, counters, replace trim and hardwood floors throughout, replace 2 bath toilets and vanities in kindDetails
unit #23: remodel kitchen in kind with new appliances, cabinets, counters, replace trim and hardwood floors throughout, replace 2 bath toilets and vanities in kind | $120,000 |
| Aug 18, 2020 | Completed final sign-off Feb 2022 | 31 Carver St | replace water damage finishes in kind. flooring, kitchen cabinets, 2 bath fixtures, light fixtures, asll work on 1st fl and basmementDetails
replace water damage finishes in kind. flooring, kitchen cabinets, 2 bath fixtures, light fixtures, asll work on 1st fl and basmement | $165,000 |
| Jul 13, 2020 | Completed final sign-off Jan 2021 | 880 Castro St | kitchen (10'x10') & bathroom (8'x10') remodel: replace kitchen cabinets and appliances in kind. replace bathroom fixtures (toilet, double vanity, shower valve & shower head) in kind . no structural work.Details
kitchen (10'x10') & bathroom (8'x10') remodel: replace kitchen cabinets and appliances in kind. replace bathroom fixtures (toilet, double vanity, shower valve & shower head) in kind . no structural work. | $120,000 |
| Apr 15, 2019 | Never finaled issued Apr 2019, no final | 30 Presidio Av | change (e) kitchen cabinets and appliances in kind. 20x12 change 4.5 bathroom fixtures in kind. e. tile. bath 1 6x12, bath 2 10x10, bath 3 6x8, bath 4 8x8. 1/2 3x7Details
change (e) kitchen cabinets and appliances in kind. 20x12 change 4.5 bathroom fixtures in kind. e. tile. bath 1 6x12, bath 2 10x10, bath 3 6x8, bath 4 8x8. 1/2 3x7 | $205,000 |
| Mar 2, 2018 | Completed final sign-off Jan 2019 | 3236 Pacific Av | (8) new recessed lights & patch drywall @ sitting room adjacent to bathroom. bathroom remodel in kind, (n) shower, toilet, vanity & tiles. no change of any wall layout.Details
(8) new recessed lights & patch drywall @ sitting room adjacent to bathroom. bathroom remodel in kind, (n) shower, toilet, vanity & tiles. no change of any wall layout. | $40,000 |
| Jul 5, 2017 | Completed final sign-off Oct 2018 | 2785 Jackson St | unit 4 - remodel (e) kitchen, baths, new powder room, no work outside of unit. n/a ordinance #155-13Details
unit 4 - remodel (e) kitchen, baths, new powder room, no work outside of unit. n/a ordinance #155-13 | $40,000 |
| Mar 2, 2017 | Completed final sign-off Feb 2018 | 2927 Broderick St | ground flr: remove (e) brick flue, install new wood framing and concrete footing. at 3rd flr - remove brick ewe and portion of interior walls. install new posts & beams. renovate kitchen, bath and half bathDetails
ground flr: remove (e) brick flue, install new wood framing and concrete footing. at 3rd flr - remove brick ewe and portion of interior walls. install new posts & beams. renovate kitchen, bath and half bath | $70,000 |
| Mar 2, 2017 | Completed final sign-off Feb 2018 | 2929 Broderick St | 2nd flr: remove (e) brick flue and portion of interior walls. install new posts & beams. relocate & remodel kitchen, renovate bathroomDetails
2nd flr: remove (e) brick flue and portion of interior walls. install new posts & beams. relocate & remodel kitchen, renovate bathroom | $65,000 |
| Nov 18, 2016 | Never finaled issued Nov 2016, no final | 1049 Church St | installation of (n) sewer line through the building with a sump pump for lower level bathroom & 2 sump pumps for the garage area & walkway at the side of the house. sheet rock soffit around int piping - 5/8in type x sheet rock.Details
installation of (n) sewer line through the building with a sump pump for lower level bathroom & 2 sump pumps for the garage area & walkway at the side of the house. sheet rock soffit around int piping - 5/8in type x sheet rock. | $25,000 |
| Nov 14, 2016 | Completed final sign-off Jan 2017 | 353 San Jose Av | unit #353 in ground floor - revision to pa #200712120285: replace tub with shower at bathroom.Details
unit #353 in ground floor - revision to pa #200712120285: replace tub with shower at bathroom. | |
| Jul 8, 2016 | Completed final sign-off Oct 2022 | 3574 17th St | under ord 30-15. add 2 new residential units at the grd floor. unit "a" 1 bedroom, 1 bath with office. unit "b" 1 bedroom, 1 bath. soft story appl #2016-0630-1274. sprinklers to nfpa-13 on deferred submittal.Details
under ord 30-15. add 2 new residential units at the grd floor. unit "a" 1 bedroom, 1 bath with office. unit "b" 1 bedroom, 1 bath. soft story appl #2016-0630-1274. sprinklers to nfpa-13 on deferred submittal. | $160,000 |
| Apr 21, 2016 | Completed final sign-off Aug 2016 | 687 Geary St | convert to cafe with food prep. reconfigure partitions. remove wall of stair (sealed above) and replace framining at opening. install sinks and countertops. remodel bathrooms to make ada compliant. maher na abate planning enforcement from prior tenant.Details
convert to cafe with food prep. reconfigure partitions. remove wall of stair (sealed above) and replace framining at opening. install sinks and countertops. remodel bathrooms to make ada compliant. maher na abate planning enforcement from prior tenant. | $15,000 |
| Dec 30, 2015 | Completed final sign-off Oct 2017 | 300 Coleridge St | per ordinance# 30-15, rev to permit #201405024740. convert (e) garage into new dwelling unit at 1st fl. new kitchen, bath & laundry at new unit. new windows & exterior door at new unit. fill in under (e) conditioned space at rear yard less than 12 ft above grade. sprinklers under separate permit.Details
per ordinance# 30-15, rev to permit #201405024740. convert (e) garage into new dwelling unit at 1st fl. new kitchen, bath & laundry at new unit. new windows & exterior door at new unit. fill in under (e) conditioned space at rear yard less than 12 ft above grade. sprinklers under separate permit. | $85,000 |
| Sep 3, 2015 | Completed final sign-off Oct 2017 | 143 Laidley St | ref #201409257339. excavate @ 1st fl to claim/condition/enclose area under deck & under kitchen (bet kitchen & garage). (n) space to include utility rm, gym,laundry,hall closet, master bath & master dressing. add ibp glasswalk panel @ deck fl on 2nd level courtyard-over skylight @ roof.Details
ref #201409257339. excavate @ 1st fl to claim/condition/enclose area under deck & under kitchen (bet kitchen & garage). (n) space to include utility rm, gym,laundry,hall closet, master bath & master dressing. add ibp glasswalk panel @ deck fl on 2nd level courtyard-over skylight @ roof. | $100,000 |
| Feb 5, 2015 | Completed final sign-off Nov 2015 | 1 South Park | #407 - revision to appl #201211093988: remove bathroom #2 & closet to create (n) office. remove master bedroom closet to extend master bath. install connecting door between master bedroom to (n) dressing room.Details
#407 - revision to appl #201211093988: remove bathroom #2 & closet to create (n) office. remove master bedroom closet to extend master bath. install connecting door between master bedroom to (n) dressing room. | $180,000 |
| Sep 11, 2014 | Completed final sign-off Oct 2017 | 2860 Greenwich St | front facade alt, 1 story 9'-0" vertical addition, horizontal addition to the west and north side and structural and interior remodel associated with it. add: 1 bedroom and 1 bath for #2860 the upper unit) add 1 bedroom and 2 baths plus common area 1/2 bath for #2862 the lower unit)Details
front facade alt, 1 story 9'-0" vertical addition, horizontal addition to the west and north side and structural and interior remodel associated with it. add: 1 bedroom and 1 bath for #2860 the upper unit) add 1 bedroom and 2 baths plus common area 1/2 bath for #2862 the lower unit) | $950,000 |
| Aug 4, 2014 | Completed final sign-off Nov 2015 | 1 South Park | relocate non structural walls. relocate e kitchen. new fixues for 2 bathrooms. replace mechanical systemDetails
relocate non structural walls. relocate e kitchen. new fixues for 2 bathrooms. replace mechanical system | $175,000 |
| Jun 26, 2014 | Completed final sign-off Sep 2015 | 489 Elizabeth St | revision no plan appl. 201406209030. increase of scope of work to include - replacement doors on second and third level at rear of building. removal of 1 bathroom and creating new closet. new flooring at master bedroom. removal of walls and new walls per plans.Details
revision no plan appl. 201406209030. increase of scope of work to include - replacement doors on second and third level at rear of building. removal of 1 bathroom and creating new closet. new flooring at master bedroom. removal of walls and new walls per plans. | $250,000 |
| Jun 20, 2014 | Completed final sign-off Oct 2015 | 489 Elizabeth St | remodel two bathrooms and 1 closet in kind: replace tiles and fixtures in bathroom and closet. no new wall and no existing wall relocation. lighting in bathroom remodelling shall comply with cec 150(k)10.Details
remodel two bathrooms and 1 closet in kind: replace tiles and fixtures in bathroom and closet. no new wall and no existing wall relocation. lighting in bathroom remodelling shall comply with cec 150(k)10. | $3,000 |
| Dec 3, 2013 | Completed final sign-off Mar 2015 | 83 Divisadero St | renovate 2 existing bathrooms. renovate 1/2 bath. new laundry room. new lighting in kitchen, living, dining, bedrooms, and officesDetails
renovate 2 existing bathrooms. renovate 1/2 bath. new laundry room. new lighting in kitchen, living, dining, bedrooms, and offices | $200,000 |
| Apr 5, 2013 | Completed final sign-off Jul 2013 | 2257 Filbert St | interior remodel only-remove kitchen on ground level, no addition, no alterations at side line walls within 5' of property lines. reconfigure (e) bathroom & closet/bedroom on ground level. new electrical at bathroom ground level, no work to 3rd level, new steel beam to supportDetails
interior remodel only-remove kitchen on ground level, no addition, no alterations at side line walls within 5' of property lines. reconfigure (e) bathroom & closet/bedroom on ground level. new electrical at bathroom ground level, no work to 3rd level, new steel beam to support | $15,000 |
| Feb 15, 2013 | Completed final sign-off Nov 2015 | 1731 Larkin St | interior remodel of 6 dwellings units. 6 bath remodels, 6 new baths, 6 kitchen remodel, 6 new laundry. new skylights at 4th fl units. structural wok at 1st fl. new moment frames, new beams, posts and footings. no exterior work.Details
interior remodel of 6 dwellings units. 6 bath remodels, 6 new baths, 6 kitchen remodel, 6 new laundry. new skylights at 4th fl units. structural wok at 1st fl. new moment frames, new beams, posts and footings. no exterior work. | $250,000 |
| Nov 9, 2012 | Never finaled issued Nov 2012, no final | 1 South Park | relocate of bath tub & sinks in master bathroom, relocate entrance door in master bathroom, new millwork, cabinetry & blocking in master bedroom, new wall for bed in master bedroom.Details
relocate of bath tub & sinks in master bathroom, relocate entrance door in master bathroom, new millwork, cabinetry & blocking in master bedroom, new wall for bed in master bedroom. | $23,000 |
| Oct 23, 2012 | Completed final sign-off Apr 2015 | 1049 Church St | basement build-out. new rear addition, excavate new driveway, full interior remodel include new kitchen, new bathrooms, new laundry room, new powder room, new fixtures, new heating & hot water, new finishes throughout, new garage including garage door opening to front elevation.Details
basement build-out. new rear addition, excavate new driveway, full interior remodel include new kitchen, new bathrooms, new laundry room, new powder room, new fixtures, new heating & hot water, new finishes throughout, new garage including garage door opening to front elevation. | $379,956 |
| Jun 6, 2012 | Completed final sign-off Mar 2015 | 3930 Washington St | excavate bsmt for 9' ceilg & add full bath, reconfig stair & laundry; laundry chute & exercise, family, wine cellar & bedroom w/ wdw weel @ rear yard. remodel powder play rm & remove 2nd stair. new sliding glass door to yard. replace all front wdws in kind w/ insul wood wdws. 2nd fl: remove 2nd staiDetails
excavate bsmt for 9' ceilg & add full bath, reconfig stair & laundry; laundry chute & exercise, family, wine cellar & bedroom w/ wdw weel @ rear yard. remodel powder play rm & remove 2nd stair. new sliding glass door to yard. replace all front wdws in kind w/ insul wood wdws. 2nd fl: remove 2nd stai | $300,000 |
| Apr 18, 2012 | Completed final sign-off Aug 2013 | 2825 Greenwich St | redistribute units: one behind garage one at upper levels. replace all windows with insulated wood windows. 2 new/reconfig kitchens, 4 new reconfig full baths and 1 powder, reconfigure stairs throught,claim breezway at garage, infill one lightwell, reshape western lightwell, infill under rearDetails
redistribute units: one behind garage one at upper levels. replace all windows with insulated wood windows. 2 new/reconfig kitchens, 4 new reconfig full baths and 1 powder, reconfigure stairs throught,claim breezway at garage, infill one lightwell, reshape western lightwell, infill under rear | $250,000 |
| Mar 23, 2012 | Completed final sign-off May 2013 | 2374 Greenwich St | 1st fl-repl garage door, add new doors, bathrm, interior stairs, interior walls at garage. wall & roof in lightwell 1st fl only. 2nd fl-renovate 2 bathrooms, add new bathroom, remodel kitchen, stairs. roof-new deck & stairsDetails
1st fl-repl garage door, add new doors, bathrm, interior stairs, interior walls at garage. wall & roof in lightwell 1st fl only. 2nd fl-renovate 2 bathrooms, add new bathroom, remodel kitchen, stairs. roof-new deck & stairs | $345,000 |
| Feb 29, 2012 | Completed final sign-off Aug 2012 | 2641 Union St | remodeling kitchen and (2) second floor bathrooms.new entry door. relocate washer and dryer. new decorative appliance.Details
remodeling kitchen and (2) second floor bathrooms.new entry door. relocate washer and dryer. new decorative appliance. | $110,000 |
| Jun 22, 2011 | Completed final sign-off Oct 2011 | 55 Alpine Tr | renovate existing bathroom, add new 1-hr rated wall at new elevator shaft. refer to pa #201106208460 for work in same bldg.Details
renovate existing bathroom, add new 1-hr rated wall at new elevator shaft. refer to pa #201106208460 for work in same bldg. | $12,000 |
| Jun 14, 2011 | Completed final sign-off Jan 2012 | 765 Market St | change (e) kitchen cabinets in kind, repl master bathrm and 2nd bathrm fixtures in kind, new tile at shower and tub areas, in master bath and 2nd bathDetails
change (e) kitchen cabinets in kind, repl master bathrm and 2nd bathrm fixtures in kind, new tile at shower and tub areas, in master bath and 2nd bath | $60,000 |
| Apr 29, 2011 | Completed final sign-off Feb 2012 | 2004 19th St | work on #2004 only - 1) remodel (e) master bath, 2) remodel (e) guest bath, 3) remodel (e) kitchen, 4) replace 2 (e) fireplaces, 5) new doors at (e) closets and baths.Details
work on #2004 only - 1) remodel (e) master bath, 2) remodel (e) guest bath, 3) remodel (e) kitchen, 4) replace 2 (e) fireplaces, 5) new doors at (e) closets and baths. | $18,000 |
| Apr 21, 2011 | Completed final sign-off May 2011 | 1 South Park | revision to pa# 2010.06.16.4671 to install nu-heat to 2 bathrooms.Details
revision to pa# 2010.06.16.4671 to install nu-heat to 2 bathrooms. | $2,000 |
| Jan 3, 2011 | Completed final sign-off Apr 2011 | 255 Berry St | remodeling of 2 bathrooms and 1 kitchen in kind, repl cabinets, retile, new plumbing fixtures, new electrical fixturds, paint, 200 sq.ft. total ; kitchen- min 50% light watt in high efficiency light, bath, high efficiency lights or manual on occupancy sensorDetails
remodeling of 2 bathrooms and 1 kitchen in kind, repl cabinets, retile, new plumbing fixtures, new electrical fixturds, paint, 200 sq.ft. total ; kitchen- min 50% light watt in high efficiency light, bath, high efficiency lights or manual on occupancy sensor | $30,000 |
| Jun 16, 2010 | Completed final sign-off May 2011 | 1 South Park | tenant improvemnet of condominium unit#407 renovation to include finish 1-kitchen, finish 3-bathrooms, (n) lighting, (n) interior finishes, relocating (e) mechanical units.Details
tenant improvemnet of condominium unit#407 renovation to include finish 1-kitchen, finish 3-bathrooms, (n) lighting, (n) interior finishes, relocating (e) mechanical units. | $200,000 |
| Feb 2, 2010 | Completed final sign-off Mar 2011 | 1808 Greenwich St | level#1: legalize (e) bath, living space, closet. level#2: renovate kitchen, bed & bath, replace fireplace, remove portion of wall at kitchen, add beam.Details
level#1: legalize (e) bath, living space, closet. level#2: renovate kitchen, bed & bath, replace fireplace, remove portion of wall at kitchen, add beam. | $121,000 |
| Jan 27, 2010 | Completed final sign-off Sep 2010 | 1426 Jackson St | new bedroom, full bath, closet at level one/garage level. remove wall and stair at level one/garage level, add new stair at west side. light well infill at level one east.relocate bath at level 3 and 4Details
new bedroom, full bath, closet at level one/garage level. remove wall and stair at level one/garage level, add new stair at west side. light well infill at level one east.relocate bath at level 3 and 4 | $60,000 |
| Dec 11, 2009 | Completed final sign-off Sep 2010 | 1426 Jackson St | new wall at level 1 for storage, new bath, closets, new remodeled kitchen and bath fixtures in lvl 2; relocate bath, add (n) bath, new remodeled kitchen and bath fixtures in levels 3 &4. remove int. partitions at kitch. & dining lvle 2,3,4. new lighting & electrical.Details
new wall at level 1 for storage, new bath, closets, new remodeled kitchen and bath fixtures in lvl 2; relocate bath, add (n) bath, new remodeled kitchen and bath fixtures in levels 3 &4. remove int. partitions at kitch. & dining lvle 2,3,4. new lighting & electrical. | $280,000 |
| Jul 28, 2009 | Completed final sign-off Feb 2010 | 238 22nd Av | convert the rear portion of the garage to a habitable space (approx 400 sq. ft) includes one full bath and family room.Details
convert the rear portion of the garage to a habitable space (approx 400 sq. ft) includes one full bath and family room. | $60,000 |