Permit GraphShortlistSan Francisco building permits since 2000

Citadel Pg

Contractor license
1067076
State license record
Based in
Oakland
On San Francisco permits
Mar 2021 to Aug 2022
Last 24 months
0 permits filed

5 permits since 2000: 3 completed, 1 never finaled, 1 expired or cancelled.

Of the 1 never-finaled permit, 1 is 5 to 10 years old.

CompletedIn progressNever finaledExpired or cancelled

This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records

Permits filed each year

How long permits take

Median days to final inspection, citywideMedian days to permit issued, citywide

Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.

Kitchen remodel permits

AllKitchen remodel 2Bathroom remodel 4

2 kitchen remodel permits: 2 completed. Typically 2 days from filing to permit and 538 days from permit to final inspection.

FiledOutcomeAddressWork described on the permitDeclared cost
Jul 16, 2021Completed
final sign-off Jan 2022
2610 Greenwich Stinterior remodel to the upper level unit with work being done in the kitchen, master bedroom and bathroom and demolition of an existing restroom, aka 2612 greenwich st.
Details
Permit
202107164570
Status
complete
Filed
Jul 16, 2021
Permit issued
Jul 19, 2021
Final sign-off
Jan 31, 2022
Declared cost
$40,000
Address
2610 Greenwich St

interior remodel to the upper level unit with work being done in the kitchen, master bedroom and bathroom and demolition of an existing restroom, aka 2612 greenwich st.

Open the permit page

$40,000
Mar 11, 2021Completed
final sign-off Aug 2023
2096 Fell Stkitchen remodel, upgrade plumb, upgrade ele, upgrade vent roof. connect stove to e gas line, install cabinets countertops, 2 bath remodel, 2 new tub upgrade plumbinb, upgrade elec, upgrade exhaust fan, wet walls inspection 2nd bath new dcurb shower bench upgrade plumb, upgrade elec, mech
Details
Permit
202103116374
Status
complete
Filed
Mar 11, 2021
Permit issued
Mar 11, 2021
Final sign-off
Aug 8, 2023
Declared cost
$45,000
Address
2096 Fell St

kitchen remodel, upgrade plumb, upgrade ele, upgrade vent roof. connect stove to e gas line, install cabinets countertops, 2 bath remodel, 2 new tub upgrade plumbinb, upgrade elec, upgrade exhaust fan, wet walls inspection 2nd bath new dcurb shower bench upgrade plumb, upgrade elec, mech

Open the permit page

$45,000