Back to bathroom remodel contractors
Citadel Pg
- Based in
- Oakland
- On San Francisco permits
- Mar 2021 to Aug 2022
- Last 24 months
- 0 permits filed
5 permits since 2000: 3 completed, 1 never finaled, 1 expired or cancelled.
Of the 1 never-finaled permit, 1 is 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
4 bathroom remodel permits: 2 completed, 1 never finaled, 1 expired or cancelled. Typically 2 days from filing to permit and 538 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 5, 2022 | Expired or cancelled cancelled Jan 2024 | 75 Deming St | excavation and build retaining walls to convert basement space into additional 2 storages and 1 bath. app 22 cubic yard of excavation and installation of four wooden windows.Details
excavation and build retaining walls to convert basement space into additional 2 storages and 1 bath. app 22 cubic yard of excavation and installation of four wooden windows. | $100,000 |
| Sep 27, 2021 | Never finaled issued Sep 2021, no final | 438 Day St | two bathrooms remodels in kind lights per cec 150.0(k)Details
two bathrooms remodels in kind lights per cec 150.0(k) | $40,000 |
| Jul 16, 2021 | Completed final sign-off Jan 2022 | 2610 Greenwich St | interior remodel to the upper level unit with work being done in the kitchen, master bedroom and bathroom and demolition of an existing restroom, aka 2612 greenwich st.Details
interior remodel to the upper level unit with work being done in the kitchen, master bedroom and bathroom and demolition of an existing restroom, aka 2612 greenwich st. | $40,000 |
| Mar 11, 2021 | Completed final sign-off Aug 2023 | 2096 Fell St | kitchen remodel, upgrade plumb, upgrade ele, upgrade vent roof. connect stove to e gas line, install cabinets countertops, 2 bath remodel, 2 new tub upgrade plumbinb, upgrade elec, upgrade exhaust fan, wet walls inspection 2nd bath new dcurb shower bench upgrade plumb, upgrade elec, mechDetails
kitchen remodel, upgrade plumb, upgrade ele, upgrade vent roof. connect stove to e gas line, install cabinets countertops, 2 bath remodel, 2 new tub upgrade plumbinb, upgrade elec, upgrade exhaust fan, wet walls inspection 2nd bath new dcurb shower bench upgrade plumb, upgrade elec, mech | $45,000 |