Back to kitchen remodel contractors
Chubby Construction
- Based in
- San Francisco
- On San Francisco permits
- Mar 2010 to Apr 2026
- Last 24 months
- 6 permits filed
44 permits since 2000: 35 completed, 5 never finaled, 4 expired or cancelled.
Of the 5 never-finaled permits, 2 are 5 to 10 years old, 3 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
19 kitchen remodel permits: 14 completed, 2 never finaled, 3 expired or cancelled. Typically 2 days from filing to permit and 117 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Oct 15, 2025 | Completed final sign-off Nov 2025 | 930 Leavenworth St | comply w/nov# 202543875, #3 repair back stairway tread worn & deteriorated & dryrotted @ level 2 (replace less than 50%). repair bath ceiling mold/mildew @ unit 6; repair water damage @ bath & kitchen faucet @ unit 6.Details
comply w/nov# 202543875, #3 repair back stairway tread worn & deteriorated & dryrotted @ level 2 (replace less than 50%). repair bath ceiling mold/mildew @ unit 6; repair water damage @ bath & kitchen faucet @ unit 6. | $5,000 |
| Jun 2, 2025 | Completed final sign-off Aug 2025 | 4921 California St | unit #2: remodel kitchen in kind with (n) cabinet, countertop, sink, disposal, electric range & hood with no change. addition counter top gfci outlet x2, bath remodel in kind with (n) shower pan instead of tub. (n) vanity & toilet renew ceiling vent fan, living & bedroom (n) vinyl floor & baseboard.Details
unit #2: remodel kitchen in kind with (n) cabinet, countertop, sink, disposal, electric range & hood with no change. addition counter top gfci outlet x2, bath remodel in kind with (n) shower pan instead of tub. (n) vanity & toilet renew ceiling vent fan, living & bedroom (n) vinyl floor & baseboard. | $30,000 |
| Apr 7, 2025 | Completed final sign-off Jun 2025 | 1275 California St | unit #5 3rd fl: remodel kitchen, (n) ceiling recess led 6x, offset kitchen sink, gas range add gas shut off valve, (n) cabinet & floor tile. relocate (e) unit service panel from closet to hallway. new dishwasher.Details
unit #5 3rd fl: remodel kitchen, (n) ceiling recess led 6x, offset kitchen sink, gas range add gas shut off valve, (n) cabinet & floor tile. relocate (e) unit service panel from closet to hallway. new dishwasher. | $40,000 |
| Jan 4, 2022 | Completed final sign-off Jul 2026 | 156 Lunado Ct | (n) ev car charger. water service to increase to 11/4" o.d. for (n) fire sprinklers. full interior remodel including: kitchen & 3 bathrms remodels, ramps, sloped walkway, exterior stairs for free accessibility. 78 s.f. addition. remove fireplace/chimney. roofing.(n) windows, mini-split hvac.Details
(n) ev car charger. water service to increase to 11/4" o.d. for (n) fire sprinklers. full interior remodel including: kitchen & 3 bathrms remodels, ramps, sloped walkway, exterior stairs for free accessibility. 78 s.f. addition. remove fireplace/chimney. roofing.(n) windows, mini-split hvac. | $517,000 |
| Aug 21, 2020 | Expired or cancelled cancelled Jan 2026 | 718 California St | per approved pa# 201806222746 & 201908078201 for t.i to modify the restaurant's existing kitchen and restrooms, to submit plans of hvac, electrical & plumbing for review the updated.Details
per approved pa# 201806222746 & 201908078201 for t.i to modify the restaurant's existing kitchen and restrooms, to submit plans of hvac, electrical & plumbing for review the updated. | $1,000 |
| Aug 7, 2019 | Never finaled issued Sep 2019, no final | 718 California St | rev to pa# 201806222746; reconfigure kitchen and restrooms layout for both floor plan (2nd & 3rd fl)Details
rev to pa# 201806222746; reconfigure kitchen and restrooms layout for both floor plan (2nd & 3rd fl) | $2,000 |
| Jun 14, 2019 | Completed final sign-off Nov 2020 | 1818 Broadway | unit 203 - proposed kitchen remodl & bathroom renovation. replace existing singe pane to double pane windows (not visible from street)Details
unit 203 - proposed kitchen remodl & bathroom renovation. replace existing singe pane to double pane windows (not visible from street) | $42,000 |
| May 3, 2019 | Completed final sign-off Mar 2020 | 1723 31st Av | upper story kitchen and one bathroom remodel, electrical update to code. no new wall and no existing wall relocation. for kitchen and bathroom remodel, new lighting shall comply with cec 150.0(k)3 & (k)5. number of plumbing fixtures remain as existing.Details
upper story kitchen and one bathroom remodel, electrical update to code. no new wall and no existing wall relocation. for kitchen and bathroom remodel, new lighting shall comply with cec 150.0(k)3 & (k)5. number of plumbing fixtures remain as existing. | $58,000 |
| Feb 25, 2019 | Completed final sign-off Apr 2019 | 1235 16th Av | unit 4, 3rd fl - kitchen remodel, cabinet (n) sink & range, replace hood w/duct; new countertop gfci outlet. kitchen addition 4x recess led; (n) living & hallway 9 x recess led, (n) afci outlet on livingDetails
unit 4, 3rd fl - kitchen remodel, cabinet (n) sink & range, replace hood w/duct; new countertop gfci outlet. kitchen addition 4x recess led; (n) living & hallway 9 x recess led, (n) afci outlet on living | $12,000 |
| Jun 22, 2018 | Never finaled issued Apr 2019, no final | 718 California St | tenant improvement remodel (e) full service service restaurant work included modify (e) restrooms, kitchenDetails
tenant improvement remodel (e) full service service restaurant work included modify (e) restrooms, kitchen | $150,000 |
| May 16, 2017 | Completed final sign-off Jan 2019 | 1723 31st Av | legalize& renovate first floor dwelling unit per sec 207.3 sfpc ord #43-14. unit includes 2-bedroom, 1-full bath, living room, dining room, kitchenDetails
legalize& renovate first floor dwelling unit per sec 207.3 sfpc ord #43-14. unit includes 2-bedroom, 1-full bath, living room, dining room, kitchen | $48,000 |
| Aug 11, 2016 | Expired or cancelled expired May 2018 | 682 19th Av | remodel kitchen - (n) cabinet, floor tile, (n) electrical outlet & led recess. laundry room - (n) gas, (n) back ext. door (n) 1/2 bath sink, (n) toilet, (n) pocket door. relocate (e) register in stairway & (n) floor register @ bedrooms. (n) 100a sub services for ktichen, laundry & 1/2 bath.Details
remodel kitchen - (n) cabinet, floor tile, (n) electrical outlet & led recess. laundry room - (n) gas, (n) back ext. door (n) 1/2 bath sink, (n) toilet, (n) pocket door. relocate (e) register in stairway & (n) floor register @ bedrooms. (n) 100a sub services for ktichen, laundry & 1/2 bath. | $38,500 |
| May 31, 2016 | Completed final sign-off Sep 2016 | 1990 43rd Av | kitchen cabinet, floor tile, new electrical, relocate gas range shut-off valve, new bath tile, relocate toilet and vanity cabinet, wall & floor tile. new 75a sub service for kitche & bathDetails
kitchen cabinet, floor tile, new electrical, relocate gas range shut-off valve, new bath tile, relocate toilet and vanity cabinet, wall & floor tile. new 75a sub service for kitche & bath | $25,000 |
| Jan 28, 2016 | Completed final sign-off Apr 2016 | 1235 16th Av | 2nd floor, unit #2: remodel kitchen cabinets, new sink & disposal. relocate (e) sub panel from closet to living room. (n) kitchen gfi outlets & switch. (n) wall outlets, switches & ceiling fixtures in living & dining roomsDetails
2nd floor, unit #2: remodel kitchen cabinets, new sink & disposal. relocate (e) sub panel from closet to living room. (n) kitchen gfi outlets & switch. (n) wall outlets, switches & ceiling fixtures in living & dining rooms | $9,000 |
| Nov 10, 2015 | Completed final sign-off Jan 2017 | 350 San Carlos St | 1st floor: remodeling of kitchen & bathroomDetails
1st floor: remodeling of kitchen & bathroom | $25,000 |
| Aug 24, 2015 | Completed final sign-off Dec 2015 | 678 19th Av | remodel kitchen, cabinets, floor tile & electrical. study room - new cabinets and electrical. 1/2 bath - nre floor and new pocket door.Details
remodel kitchen, cabinets, floor tile & electrical. study room - new cabinets and electrical. 1/2 bath - nre floor and new pocket door. | $11,000 |
| Apr 22, 2015 | Completed final sign-off Aug 2015 | 183 Clearfield Dr | renovate existing kitchen.Details
renovate existing kitchen. | $17,609 |
| May 2, 2014 | Expired or cancelled expired Dec 2022 | 316 Noriega St | add new master bathroom on the second level, relocate the kitchen from 2nd floor to top floor (3rd floor), infill open area between 2nd & 3rd floor. add more subfloor area on top floor. add one bedroom & utility room on 2nd floor.install (n) gas fireplace.Details
add new master bathroom on the second level, relocate the kitchen from 2nd floor to top floor (3rd floor), infill open area between 2nd & 3rd floor. add more subfloor area on top floor. add one bedroom & utility room on 2nd floor.install (n) gas fireplace. | $35,000 |
| Mar 29, 2010 | Completed final sign-off Sep 2010 | 21 Hahn St | add 2 bedrooms, 1 storage/laundry & legalize 1 full bathroom on (e) ground floor. add 1 half bathroom and remodel (e) kitchen & full bahtroom on 2nd floor. install 3'x3' skylights above existing kitchen.Details
add 2 bedrooms, 1 storage/laundry & legalize 1 full bathroom on (e) ground floor. add 1 half bathroom and remodel (e) kitchen & full bahtroom on 2nd floor. install 3'x3' skylights above existing kitchen. | $45,000 |