Back to bathroom remodel contractors
Chubby Construction
- Based in
- San Francisco
- On San Francisco permits
- Mar 2010 to Apr 2026
- Last 24 months
- 6 permits filed
44 permits since 2000: 35 completed, 5 never finaled, 4 expired or cancelled.
Of the 5 never-finaled permits, 2 are 5 to 10 years old, 3 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
17 bathroom remodel permits: 15 completed, 2 expired or cancelled. Typically 1 days from filing to permit and 153 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Oct 15, 2025 | Completed final sign-off Nov 2025 | 930 Leavenworth St | comply w/nov# 202543875, #3 repair back stairway tread worn & deteriorated & dryrotted @ level 2 (replace less than 50%). repair bath ceiling mold/mildew @ unit 6; repair water damage @ bath & kitchen faucet @ unit 6.Details
comply w/nov# 202543875, #3 repair back stairway tread worn & deteriorated & dryrotted @ level 2 (replace less than 50%). repair bath ceiling mold/mildew @ unit 6; repair water damage @ bath & kitchen faucet @ unit 6. | $5,000 |
| Aug 29, 2025 | Completed final sign-off Dec 2025 | 734 37th Av | remodel bath on 2nd story hallway. replace bathtub, vanity, toilet, (n) wall tub tile & floor tile. replace (n) vent fan, mirror led sconce, addition recessed led above toilet & tub x2. replace in kind.Details
remodel bath on 2nd story hallway. replace bathtub, vanity, toilet, (n) wall tub tile & floor tile. replace (n) vent fan, mirror led sconce, addition recessed led above toilet & tub x2. replace in kind. | $20,000 |
| Jun 2, 2025 | Completed final sign-off Aug 2025 | 4921 California St | unit #2: remodel kitchen in kind with (n) cabinet, countertop, sink, disposal, electric range & hood with no change. addition counter top gfci outlet x2, bath remodel in kind with (n) shower pan instead of tub. (n) vanity & toilet renew ceiling vent fan, living & bedroom (n) vinyl floor & baseboard.Details
unit #2: remodel kitchen in kind with (n) cabinet, countertop, sink, disposal, electric range & hood with no change. addition counter top gfci outlet x2, bath remodel in kind with (n) shower pan instead of tub. (n) vanity & toilet renew ceiling vent fan, living & bedroom (n) vinyl floor & baseboard. | $30,000 |
| Jun 14, 2019 | Completed final sign-off Nov 2020 | 1818 Broadway | unit 203 - proposed kitchen remodl & bathroom renovation. replace existing singe pane to double pane windows (not visible from street)Details
unit 203 - proposed kitchen remodl & bathroom renovation. replace existing singe pane to double pane windows (not visible from street) | $42,000 |
| May 3, 2019 | Completed final sign-off Mar 2020 | 1723 31st Av | upper story kitchen and one bathroom remodel, electrical update to code. no new wall and no existing wall relocation. for kitchen and bathroom remodel, new lighting shall comply with cec 150.0(k)3 & (k)5. number of plumbing fixtures remain as existing.Details
upper story kitchen and one bathroom remodel, electrical update to code. no new wall and no existing wall relocation. for kitchen and bathroom remodel, new lighting shall comply with cec 150.0(k)3 & (k)5. number of plumbing fixtures remain as existing. | $58,000 |
| Apr 9, 2019 | Completed final sign-off Jan 2020 | 1836 Pacheco St | convert (e) storage room into a bedroom at basement. relocate (e) bathroom. update (e) electrical and plumbing to codeDetails
convert (e) storage room into a bedroom at basement. relocate (e) bathroom. update (e) electrical and plumbing to code | $80,000 |
| May 16, 2017 | Completed final sign-off Jan 2019 | 1723 31st Av | legalize& renovate first floor dwelling unit per sec 207.3 sfpc ord #43-14. unit includes 2-bedroom, 1-full bath, living room, dining room, kitchenDetails
legalize& renovate first floor dwelling unit per sec 207.3 sfpc ord #43-14. unit includes 2-bedroom, 1-full bath, living room, dining room, kitchen | $48,000 |
| Aug 11, 2016 | Expired or cancelled expired May 2018 | 682 19th Av | remodel kitchen - (n) cabinet, floor tile, (n) electrical outlet & led recess. laundry room - (n) gas, (n) back ext. door (n) 1/2 bath sink, (n) toilet, (n) pocket door. relocate (e) register in stairway & (n) floor register @ bedrooms. (n) 100a sub services for ktichen, laundry & 1/2 bath.Details
remodel kitchen - (n) cabinet, floor tile, (n) electrical outlet & led recess. laundry room - (n) gas, (n) back ext. door (n) 1/2 bath sink, (n) toilet, (n) pocket door. relocate (e) register in stairway & (n) floor register @ bedrooms. (n) 100a sub services for ktichen, laundry & 1/2 bath. | $38,500 |
| May 31, 2016 | Completed final sign-off Sep 2016 | 1990 43rd Av | kitchen cabinet, floor tile, new electrical, relocate gas range shut-off valve, new bath tile, relocate toilet and vanity cabinet, wall & floor tile. new 75a sub service for kitche & bathDetails
kitchen cabinet, floor tile, new electrical, relocate gas range shut-off valve, new bath tile, relocate toilet and vanity cabinet, wall & floor tile. new 75a sub service for kitche & bath | $25,000 |
| Nov 10, 2015 | Completed final sign-off Jan 2017 | 350 San Carlos St | 1st floor: remodeling of kitchen & bathroomDetails
1st floor: remodeling of kitchen & bathroom | $25,000 |
| Aug 24, 2015 | Completed final sign-off Dec 2015 | 678 19th Av | remodel kitchen, cabinets, floor tile & electrical. study room - new cabinets and electrical. 1/2 bath - nre floor and new pocket door.Details
remodel kitchen, cabinets, floor tile & electrical. study room - new cabinets and electrical. 1/2 bath - nre floor and new pocket door. | $11,000 |
| Jul 9, 2015 | Completed final sign-off Mar 2016 | 6 Locksley Av | unit #4k. remodel bathroom, remove non load bearing wall, build linen closet, enlarge existing door. new floor tile & vanity toilet. open a 36" door to replace (e) 28" door.Details
unit #4k. remodel bathroom, remove non load bearing wall, build linen closet, enlarge existing door. new floor tile & vanity toilet. open a 36" door to replace (e) 28" door. | $7,000 |
| May 27, 2015 | Completed final sign-off Aug 2015 | 183 Clearfield Dr | remodel existing bathroom on ground floorDetails
remodel existing bathroom on ground floor | $6,500 |
| May 2, 2014 | Expired or cancelled expired Dec 2022 | 316 Noriega St | add new master bathroom on the second level, relocate the kitchen from 2nd floor to top floor (3rd floor), infill open area between 2nd & 3rd floor. add more subfloor area on top floor. add one bedroom & utility room on 2nd floor.install (n) gas fireplace.Details
add new master bathroom on the second level, relocate the kitchen from 2nd floor to top floor (3rd floor), infill open area between 2nd & 3rd floor. add more subfloor area on top floor. add one bedroom & utility room on 2nd floor.install (n) gas fireplace. | $35,000 |
| Jul 30, 2013 | Completed final sign-off May 2015 | 547 Masonic Av | add two and a half bathrooms, one bedroom, utility room & study on ground floor per plan. add house gas meter & ugrade sub panel. repair stair at lightwell area.Details
add two and a half bathrooms, one bedroom, utility room & study on ground floor per plan. add house gas meter & ugrade sub panel. repair stair at lightwell area. | $68,000 |
| Aug 7, 2012 | Completed final sign-off Jan 2013 | 433 Arguello Bl | install a full bath room on ground floor in nonhabitable storage area.Details
install a full bath room on ground floor in nonhabitable storage area. | $8,000 |
| Mar 29, 2010 | Completed final sign-off Sep 2010 | 21 Hahn St | add 2 bedrooms, 1 storage/laundry & legalize 1 full bathroom on (e) ground floor. add 1 half bathroom and remodel (e) kitchen & full bahtroom on 2nd floor. install 3'x3' skylights above existing kitchen.Details
add 2 bedrooms, 1 storage/laundry & legalize 1 full bathroom on (e) ground floor. add 1 half bathroom and remodel (e) kitchen & full bahtroom on 2nd floor. install 3'x3' skylights above existing kitchen. | $45,000 |