Back to bathroom remodel contractors
Cht Properties Development
- Based in
- San Francisco
- On San Francisco permits
- Jul 2003 to Sep 2026
- Last 24 months
- 13 permits filed
200 permits since 2000: 162 completed, 9 in progress, 19 never finaled, 10 expired or cancelled.
Of the 19 never-finaled permits, 4 are 3 to 5 years old, 4 are 5 to 10 years old, 11 are over 10 years old. 2 were filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
78 bathroom remodel permits: 64 completed, 2 in progress, 8 never finaled, 4 expired or cancelled. Typically 2 days from filing to permit and 222 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 2, 2026 | In progress issued Sep 2026 | 1682 Alemany Bl | remodel one bathroom: not moving any wall, no changes in plumbing fixtures count. new lighting shall comply with cec 150.0 (k)5.Details
remodel one bathroom: not moving any wall, no changes in plumbing fixtures count. new lighting shall comply with cec 150.0 (k)5. | $14,000 |
| Dec 1, 2025 | Completed final sign-off Jul 2026 | 735 22nd Av | 2/f: remodel kitchen and bath with reconfiguration. remove wall (interior) b/w kitchen and dining room. replace bathroom window with new opening. 3/f: remodel bath with reconfiguration and add half bath.Details
2/f: remodel kitchen and bath with reconfiguration. remove wall (interior) b/w kitchen and dining room. replace bathroom window with new opening. 3/f: remodel bath with reconfiguration and add half bath. | $35,000 |
| Nov 4, 2025 | Completed final sign-off Dec 2025 | 1332 Vermont St | replace bathroom floors due to water damage in the church. like for like, no structual work.Details
replace bathroom floors due to water damage in the church. like for like, no structual work. | $18,000 |
| Aug 26, 2025 | Completed final sign-off Aug 2026 | 2083 29th Av | enclose entryway and stairwell. add bathroom and office at gr fl. rebuild interior staircase. new window and door at rear wall.Details
enclose entryway and stairwell. add bathroom and office at gr fl. rebuild interior staircase. new window and door at rear wall. | $150,000 |
| Nov 22, 2024 | Completed final sign-off Jul 2025 | 1316 Larkin St | remodel 1 kitchen 1 bathroom. add sink in toilet room. not moving any wallsDetails
remodel 1 kitchen 1 bathroom. add sink in toilet room. not moving any walls | $28,000 |
| Apr 22, 2024 | Completed final sign-off Dec 2024 | 2700 15th Av | remodel 1 full bath, 1 1/2 bath, 1 kitchen. not moving any walls.Details
remodel 1 full bath, 1 1/2 bath, 1 kitchen. not moving any walls. | $45,000 |
| Feb 8, 2024 | Completed final sign-off May 2024 | 3927 Clement St | remodel to single family home, include soft demo to interior space, reconfigure (2) bedrooms located at 2nd floor, remodel kitchen and bathroom finishes, fixtures. add (n) full bathroom located at second floor. replace window in the same opening located at side of property. mep under seperate permitDetails
remodel to single family home, include soft demo to interior space, reconfigure (2) bedrooms located at 2nd floor, remodel kitchen and bathroom finishes, fixtures. add (n) full bathroom located at second floor. replace window in the same opening located at side of property. mep under seperate permit | $78,000 |
| Jan 19, 2024 | Completed final sign-off Sep 2024 | 677 10th Av | remodel (2) bathrooms. not moving any walls.Details
remodel (2) bathrooms. not moving any walls. | $31,000 |
| Jan 19, 2024 | Completed final sign-off Jun 2024 | 675 10th Av | remodel (2) bathrooms. not moving any walls.Details
remodel (2) bathrooms. not moving any walls. | $31,000 |
| Aug 15, 2023 | Completed final sign-off Dec 2023 | 1679 38th Av | renovation of 2nd fl of single family dwelling. remodel existing bathroom. convert (e) half bath to full bathroom. remove two skylights and add one skylight.Details
renovation of 2nd fl of single family dwelling. remodel existing bathroom. convert (e) half bath to full bathroom. remove two skylights and add one skylight. | $30,000 |
| Jun 23, 2023 | Completed final sign-off Jan 2024 | 999 16th St | apt 4. bathroom remodel, hardwood floor insatllation, built in cabinet installation. lighitng and electrical installation.Details
apt 4. bathroom remodel, hardwood floor insatllation, built in cabinet installation. lighitng and electrical installation. | $50,000 |
| Mar 16, 2023 | Completed final sign-off Dec 2023 | 3931 20th St | remodel (2) bathrooms,one kitchen & replace all flooring. non structuralDetails
remodel (2) bathrooms,one kitchen & replace all flooring. non structural | $50,000 |
| Jan 6, 2023 | Completed final sign-off Jul 2023 | 148 Prague St | unit 148: remodel kitchen/bathroom, new sheetrock thruout, new plubming/electrical, sister (2)2x4 to maintain structural sound of bldg, replace some plywood sheathing; unit 150: remodel (1)bathroom, replace (1)window, (1)skylight-fire damage, replace sheetrock (1)bedroom, sister (2)2x4 to maintainDetails
unit 148: remodel kitchen/bathroom, new sheetrock thruout, new plubming/electrical, sister (2)2x4 to maintain structural sound of bldg, replace some plywood sheathing; unit 150: remodel (1)bathroom, replace (1)window, (1)skylight-fire damage, replace sheetrock (1)bedroom, sister (2)2x4 to maintain | $85,000 |
| Nov 18, 2022 | Completed final sign-off Jun 2023 | 835 Diamond St | unit 1: remodel kitchen, family room, 2 bath and add 1 bath. unit 2: remodel kitchen, powder room, bath, bedrooms, laundry. add 1 bath. relocate interior stairs. replace windows at front and rear per plan. all windows facing street to be wood windows.Details
unit 1: remodel kitchen, family room, 2 bath and add 1 bath. unit 2: remodel kitchen, powder room, bath, bedrooms, laundry. add 1 bath. relocate interior stairs. replace windows at front and rear per plan. all windows facing street to be wood windows. | $120,000 |
| Jul 12, 2022 | Completed final sign-off Oct 2022 | 1954 44th Av | remodel one bathroom on 2nd floor: enlarge shower: small tubDetails
remodel one bathroom on 2nd floor: enlarge shower: small tub | $15,000 |
| Jun 23, 2022 | Completed final sign-off Oct 2022 | 2329 Taraval St | remodel 1 kitchen & 1 bathroom. convert tub to shower pan. replace window in kind in shower. all work in dwelling unit.Details
remodel 1 kitchen & 1 bathroom. convert tub to shower pan. replace window in kind in shower. all work in dwelling unit. | $32,000 |
| Jan 18, 2022 | Completed final sign-off Apr 2022 | 613 Carolina St | remodel 1 kitchen, 2 bathroom: kitchen replace countertop. bath #1 replace shower pan. bathroom # 2: remove tub and replace with shower pan.Details
remodel 1 kitchen, 2 bathroom: kitchen replace countertop. bath #1 replace shower pan. bathroom # 2: remove tub and replace with shower pan. | $51,000 |
| Dec 23, 2021 | Completed final sign-off Feb 2023 | 83 Apollo St | 1/f remodel. additional habitable square feet are proposed at 1/f within the existing footprint to create a lounge/office, bathroom, and study nook. redesign of windows and doors at rear facade at 1/f. no work on the front facade. no change in bldg footprint, volume or height.Details
1/f remodel. additional habitable square feet are proposed at 1/f within the existing footprint to create a lounge/office, bathroom, and study nook. redesign of windows and doors at rear facade at 1/f. no work on the front facade. no change in bldg footprint, volume or height. | $52,000 |
| Jan 12, 2021 | Never finaled issued Mar 2021, no final | 56 Holyoke St | 1st fl: add family room, bathroom & exercise room in a single famiy dwelling.Details
1st fl: add family room, bathroom & exercise room in a single famiy dwelling. | $60,000 |
| Dec 8, 2020 | Completed final sign-off May 2022 | 664 Teresita Bl | add 1 bedroom, 1 full bath, walk-in closet @ existing ground floor. relocate & renew (e) water heater & furnace. add washer & dryer on garage level.Details
add 1 bedroom, 1 full bath, walk-in closet @ existing ground floor. relocate & renew (e) water heater & furnace. add washer & dryer on garage level. | $50,000 |
| Dec 20, 2019 | In progress issued Oct 2024 | 75 Topeka Av | (n) adu unit per ordinance #162-16. add kitchen, family room, (2) bedrooms & (1) full bathroom. horizontal addition @ rear under separate permit appln #201811155981.Details
(n) adu unit per ordinance #162-16. add kitchen, family room, (2) bedrooms & (1) full bathroom. horizontal addition @ rear under separate permit appln #201811155981. | $5,000 |
| Dec 19, 2019 | Completed final sign-off Jul 2021 | 653 28th St | revision pa#201702179712. basemt:relocate util rm. 1st floor- extend hallway, add laundry rm, show (n) utility location. 2nd fl:- enlarge window, shift staircase, revise bath fixture layout, add grill at deck. 3rd fl: remove bath, add laundry room, add (n) window, adjust fire-rated window east wallDetails
revision pa#201702179712. basemt:relocate util rm. 1st floor- extend hallway, add laundry rm, show (n) utility location. 2nd fl:- enlarge window, shift staircase, revise bath fixture layout, add grill at deck. 3rd fl: remove bath, add laundry room, add (n) window, adjust fire-rated window east wall | $12,000 |
| Nov 13, 2019 | Completed final sign-off Feb 2020 | 1448 Union St | comply with complaint 201900833. framing for fireplace (no structural) replace(2) wood burning fireplace w/ gas fireplace/ under separate permit. 2 kitchens, replace countertop, paint cabinet door, replace faucets only. 2 bathrooms replace vanity and faucet only.Details
comply with complaint 201900833. framing for fireplace (no structural) replace(2) wood burning fireplace w/ gas fireplace/ under separate permit. 2 kitchens, replace countertop, paint cabinet door, replace faucets only. 2 bathrooms replace vanity and faucet only. | $15,000 |
| May 14, 2019 | Completed final sign-off Feb 2022 | 130 Grafton Av | horizontal addition. add one family room, three beds, one bath @ 1st fl, add one bedrrom & one bath @ 2nd fl. mech, elec, plumbing under separate permits. nfpa 13-r on separate addendum.Details
horizontal addition. add one family room, three beds, one bath @ 1st fl, add one bedrrom & one bath @ 2nd fl. mech, elec, plumbing under separate permits. nfpa 13-r on separate addendum. | $150,000 |
| Feb 6, 2018 | Completed final sign-off Dec 2018 | 1559 44th Av | ground floor: addition below extg 2nd floor extension. remodel of extg garage area to include bedroom, bathroom, family room, laundry and storage. structural upgrade as req. demolition of interior walls is less than 75%.Details
ground floor: addition below extg 2nd floor extension. remodel of extg garage area to include bedroom, bathroom, family room, laundry and storage. structural upgrade as req. demolition of interior walls is less than 75%. | $65,000 |
| Jan 19, 2018 | Completed final sign-off May 2018 | 56 Winfield St | remodel one bathroom - all walls stay in same location. convert tub to shower pan.Details
remodel one bathroom - all walls stay in same location. convert tub to shower pan. | $12,000 |
| Sep 19, 2017 | Never finaled issued Sep 2017, no final | 75 Topeka Av | remodel 1 bath on 2nd floor in kind & same location, no moving of walls, doors or windowsDetails
remodel 1 bath on 2nd floor in kind & same location, no moving of walls, doors or windows | $8,000 |
| Sep 14, 2017 | Completed final sign-off Jul 2018 | 2623 44th Av | at first floor, remodel extg space including new bathroom, home office and bedrooms. at 2nd floor: remodel extg kitchen, bathroom, new bathroom. 1 level new wood rear deckDetails
at first floor, remodel extg space including new bathroom, home office and bedrooms. at 2nd floor: remodel extg kitchen, bathroom, new bathroom. 1 level new wood rear deck | $60,000 |
| Mar 22, 2017 | Completed final sign-off May 2017 | 25 Western Shore Ln | remodel 1 bath & 1 kitchen in unit#2 only.Details
remodel 1 bath & 1 kitchen in unit#2 only. | $35,000 |
| Oct 27, 2016 | Completed final sign-off Jun 2017 | 546 44th Av | 3rd floor - window replacement; 2nd floor - kitchen remodeling, (n) laundry room, replacement of 2 windows & 1 (n) skylight; 1st floor - (n) livable area (755 sq ft) (n) bath, (n) bedroom & family room, relocate mech, room structural/plumbnig, mech, electrical per plan and as requiredDetails
3rd floor - window replacement; 2nd floor - kitchen remodeling, (n) laundry room, replacement of 2 windows & 1 (n) skylight; 1st floor - (n) livable area (755 sq ft) (n) bath, (n) bedroom & family room, relocate mech, room structural/plumbnig, mech, electrical per plan and as required | $154,000 |
| Jun 20, 2016 | Completed final sign-off Apr 2017 | 1530 44th Av | 1)920 sq ft of new conditioned space on 1st floor. 2) new master bedroom, master bath, entertainment, yoga/pilates room and 1/2 bath. 3)new stair (interior).Details
1)920 sq ft of new conditioned space on 1st floor. 2) new master bedroom, master bath, entertainment, yoga/pilates room and 1/2 bath. 3)new stair (interior). | $75,000 |
| Jun 16, 2016 | Completed final sign-off Oct 2017 | 3320 Santiago St | infill open space under extg 2nd floor habitable area. add 1 bedroom. 1 full bath room storage room and relocated washer and dryer at 1st floor per plan.Details
infill open space under extg 2nd floor habitable area. add 1 bedroom. 1 full bath room storage room and relocated washer and dryer at 1st floor per plan. | $41,000 |
| May 18, 2016 | Completed final sign-off Jun 2016 | 2162 26th Av | remodel 1-1/2 bathrooms; replace tile, lights & plumbing fixtures, in-kind.Details
remodel 1-1/2 bathrooms; replace tile, lights & plumbing fixtures, in-kind. | $16,600 |
| Dec 31, 2015 | Completed final sign-off Jun 2017 | 3149 Washington St | intall all interior material doors, cabinets, for kitchen and bath. ref pa# 201504143544, interior finishes onlyDetails
intall all interior material doors, cabinets, for kitchen and bath. ref pa# 201504143544, interior finishes only | $70,000 |
| Oct 16, 2015 | Completed final sign-off Apr 2016 | 1559 44th Av | 3rd floor: remodel bathroom. electrical and plumbing fixtures will comply with title 24. no structural work.Details
3rd floor: remodel bathroom. electrical and plumbing fixtures will comply with title 24. no structural work. | $11,000 |
| Oct 8, 2015 | Completed final sign-off Feb 2017 | 1350 Noe St | install all interior materials, doors, cabinets for kitchen & bath. ref to pa# 201012176969Details
install all interior materials, doors, cabinets for kitchen & bath. ref to pa# 201012176969 | $60,000 |
| Apr 13, 2015 | Completed final sign-off Nov 2015 | 1615 Funston Av | kitchen remodel: relocate sink and appliances, add new bar counter. bath remodel: relocate toilet and shower, new landscape deck structural: remove wall between dining: kichen, new beam and new shearwalls for future 2nd floor extension.Details
kitchen remodel: relocate sink and appliances, add new bar counter. bath remodel: relocate toilet and shower, new landscape deck structural: remove wall between dining: kichen, new beam and new shearwalls for future 2nd floor extension. | $55,000 |
| Dec 5, 2014 | Completed final sign-off Jan 2016 | 2567 Mission St | revision to pa#201307010921 & 201311051195 revised layout per plan. add uni-sex bathroom rooms & offices.Details
revision to pa#201307010921 & 201311051195 revised layout per plan. add uni-sex bathroom rooms & offices. | |
| Nov 25, 2014 | Completed final sign-off May 2019 | 167 Harvard St | reconfigure (e) rooms layout at 2nd floor per plan. remodel (e) kitchen, bathroom and add 1 new bath. remove (e) ext. stair from 2nd to ground floor. convert (e) dining to office. infill (e) lightwell at 2nd floor per plan.Details
reconfigure (e) rooms layout at 2nd floor per plan. remodel (e) kitchen, bathroom and add 1 new bath. remove (e) ext. stair from 2nd to ground floor. convert (e) dining to office. infill (e) lightwell at 2nd floor per plan. | $40,000 |
| Oct 21, 2014 | Completed final sign-off Nov 2018 | 167 Harvard St | legalize of ground floor unit with 2 bedrooms, a living room, a kitchen and 2 bathrooms and one study per plan.Details
legalize of ground floor unit with 2 bedrooms, a living room, a kitchen and 2 bathrooms and one study per plan. | $68,000 |
| Sep 16, 2014 | Completed final sign-off Apr 2015 | 5801 Geary Bl | new hand sink, and mop sink in existing kitchen, relocate existing bathroom and upgrade to a new ada bathroom.Details
new hand sink, and mop sink in existing kitchen, relocate existing bathroom and upgrade to a new ada bathroom. | $25,000 |
| Sep 15, 2014 | Completed final sign-off Jul 2015 | 830 40th Av | convert extg toilet and e closet into a full bath on extg 2nd floor. replace and reinstall furnace and extg washer w/h at rear of extg garage area. to comply with complaint #20141912Details
convert extg toilet and e closet into a full bath on extg 2nd floor. replace and reinstall furnace and extg washer w/h at rear of extg garage area. to comply with complaint #20141912 | $6,000 |
| Jul 29, 2014 | Completed final sign-off Jan 2015 | 248 Cumberland St | remodel kitchen & bathroom at 2nd flr per planDetails
remodel kitchen & bathroom at 2nd flr per plan | $20,000 |
| May 23, 2014 | Completed final sign-off Dec 2015 | 911 Minnesota St | comply with nov# 201399141 & 200838950. interior remodel of (e) residence. (e) building is 2 story. proposed structural will be 2 story, 3 bedrooms & 2 1/2 baths. no change to the size of the building envelope. no exterior work.Details
comply with nov# 201399141 & 200838950. interior remodel of (e) residence. (e) building is 2 story. proposed structural will be 2 story, 3 bedrooms & 2 1/2 baths. no change to the size of the building envelope. no exterior work. | $100,000 |
| Mar 14, 2014 | Completed final sign-off Nov 2014 | 540 45th Av | interior remodel. add post at 1st fl. remodel kitchen and powder room at 2nd fl. remodel master bath and hall bath at 3rd fl per planDetails
interior remodel. add post at 1st fl. remodel kitchen and powder room at 2nd fl. remodel master bath and hall bath at 3rd fl per plan | $38,600 |
| Jul 1, 2013 | Completed final sign-off Jan 2016 | 2567 Mission St | tenant improvement, new elevator, ada bathrooms, replace windows in kind, new roof insulationDetails
tenant improvement, new elevator, ada bathrooms, replace windows in kind, new roof insulation | $180,000 |
| Jun 20, 2013 | Completed final sign-off Oct 2013 | 132 Ward St | remodel 1 bathroom on 2/f to comply nov#201308051Details
remodel 1 bathroom on 2/f to comply nov#201308051 | $7,000 |
| Jun 20, 2013 | Never finaled issued Jun 2013, no final | 500 Funston Av | replace floor tiles, vanity, wall tiles, tub on ground floor bathroom, replace redwood fence on back yard, about 40' on same location, 6' high.Details
replace floor tiles, vanity, wall tiles, tub on ground floor bathroom, replace redwood fence on back yard, about 40' on same location, 6' high. | $6,000 |
| Apr 1, 2013 | Completed final sign-off Sep 2013 | 1559 44th Av | kitchen- remove & replace cabinets, countertop flooring , bathroom - replace all tiles, change tub & vanity.Details
kitchen- remove & replace cabinets, countertop flooring , bathroom - replace all tiles, change tub & vanity. | $18,000 |
| Mar 20, 2013 | Completed final sign-off Jul 2013 | 2426 15th St | remodel two bathrooms and remodel fireplace.Details
remodel two bathrooms and remodel fireplace. | $21,200 |
| Feb 19, 2013 | Completed final sign-off Feb 2015 | 2367 Washington St | voluntary upgrade of foundation, remodel 2 kitchens,remodel 4.5 baths, add storage room. repair dryrot, replace wood windows with new dual glazing. identical in appearance to facade windows, repair plaster walls. relocate one unit from 2nd flr to the ground floor. usable sp is provided @ grd flr.Details
voluntary upgrade of foundation, remodel 2 kitchens,remodel 4.5 baths, add storage room. repair dryrot, replace wood windows with new dual glazing. identical in appearance to facade windows, repair plaster walls. relocate one unit from 2nd flr to the ground floor. usable sp is provided @ grd flr. | $120,000 |
| Oct 9, 2012 | Completed final sign-off Apr 2014 | 2881 Jackson St | 1)remodel at unit 2881:reconfigure interior partition wall. add bathrooms, bedrooms and laundry at 3rd floor. relocate kitchen and bathroom at 2nd floor.2) remodel at unit 2883:reconfigure interior partition wall. relocate bath room, kitchen and add laundry and wine cellar at 1st floor.Details
1)remodel at unit 2881:reconfigure interior partition wall. add bathrooms, bedrooms and laundry at 3rd floor. relocate kitchen and bathroom at 2nd floor.2) remodel at unit 2883:reconfigure interior partition wall. relocate bath room, kitchen and add laundry and wine cellar at 1st floor. | $378,000 |
| Jul 6, 2012 | Never finaled issued Jul 2012, no final | 1440 Moraga St | kitchen - replace cabinets, counter top, floor only. bathroom - replace floor and wall tiles only. paint kitchen & bath.Details
kitchen - replace cabinets, counter top, floor only. bathroom - replace floor and wall tiles only. paint kitchen & bath. | $9,000 |
| Mar 2, 2012 | Completed final sign-off Aug 2013 | 357 Mississippi St | interior remodel-relocated kitchen, bedrooms, bathrooms & reconfigure interior per plan. add one new bathroomDetails
interior remodel-relocated kitchen, bedrooms, bathrooms & reconfigure interior per plan. add one new bathroom | $138,000 |
| Feb 24, 2012 | Completed final sign-off Dec 2012 | 290 Jersey St | interior remodel-unit #290-reconfig interior partition wall, add bathroom, bedroom & relocate kitchen at ground floor. unit #292-reconfig interior partition wall, relocated kitchen. add 2 bathrooms & master bedroom. voluntary strength (e) buildingDetails
interior remodel-unit #290-reconfig interior partition wall, add bathroom, bedroom & relocate kitchen at ground floor. unit #292-reconfig interior partition wall, relocated kitchen. add 2 bathrooms & master bedroom. voluntary strength (e) building | $200,000 |
| Dec 16, 2011 | Completed final sign-off Aug 2013 | 357 Mississippi St | remodel (3) bathroom, (1) kitchen. existing walls to remain without modification. lighting will comply w/cec 150(k) for kitchen, 150(k) 10 for bathrooms.Details
remodel (3) bathroom, (1) kitchen. existing walls to remain without modification. lighting will comply w/cec 150(k) for kitchen, 150(k) 10 for bathrooms. | $48,000 |
| Dec 12, 2011 | Never finaled issued Dec 2011, no final | 587 Silver Av | legalize (e) family room, half bathroom & storage at rear portion of (e) garage levelDetails
legalize (e) family room, half bathroom & storage at rear portion of (e) garage level | $10,000 |
| Dec 6, 2011 | Completed final sign-off Dec 2012 | 290 Jersey St | repair siding in-kind at rear of building. area=100sq ft. kitchen & one bathroom. remodel for both units. no new lighting & no structural work. replace in kind.Details
repair siding in-kind at rear of building. area=100sq ft. kitchen & one bathroom. remodel for both units. no new lighting & no structural work. replace in kind. | $33,000 |
| Nov 9, 2011 | Never finaled issued Nov 2011, no final | 1635 23rd Av | remodel 2 bathrooms, no moving of walls, everything same location to comply with title 24; all (n) lighting must comply with cec 150(k)Details
remodel 2 bathrooms, no moving of walls, everything same location to comply with title 24; all (n) lighting must comply with cec 150(k) | $12,000 |
| Jun 16, 2011 | Completed final sign-off May 2012 | 130 Foerster St | kitchen and bath remodel on upper level. add new game room and laundry room, and utility room in lower level of existing garage spaceDetails
kitchen and bath remodel on upper level. add new game room and laundry room, and utility room in lower level of existing garage space | $20,000 |
| Jul 27, 2010 | Completed final sign-off Oct 2010 | 913 Alvarado St | revision to pa# 2012.04.19.0476. relocate interior partition walls, add windows at family room. change railing at roof deck to cable railing. enlarge bathrooms. all changes shown on delta 2 of 7/18/10Details
revision to pa# 2012.04.19.0476. relocate interior partition walls, add windows at family room. change railing at roof deck to cable railing. enlarge bathrooms. all changes shown on delta 2 of 7/18/10 | $5,000 |
| Apr 23, 2010 | Completed final sign-off Oct 2010 | 72 Edgar Av | construct 1-(n) bedrm., 1-(n) bathroom & 1-(n) family rm. on (e) ground flr. relocate (e) w/h & (e) furnace. upgrade 9e) footing @ east, south & west side. repair (e) exterior main stair.Details
construct 1-(n) bedrm., 1-(n) bathroom & 1-(n) family rm. on (e) ground flr. relocate (e) w/h & (e) furnace. upgrade 9e) footing @ east, south & west side. repair (e) exterior main stair. | $30,000 |
| Feb 22, 2010 | Completed final sign-off Nov 2010 | 913 Alvarado St | comply with complaint# 200929621-revision to pa# 2009-1130-2171 & 2009-1120-1799-interior remodel at ground, 2nd & mezzanine floors. relocated interior stairs & bathrooms. convert mezzanine to habitable space.Details
comply with complaint# 200929621-revision to pa# 2009-1130-2171 & 2009-1120-1799-interior remodel at ground, 2nd & mezzanine floors. relocated interior stairs & bathrooms. convert mezzanine to habitable space. | $65,000 |
| Nov 20, 2009 | Completed final sign-off Oct 2010 | 913 Alvarado St | remodel1 bathroom on ground floor, 1 on 2nd floor, 1 on 3rd floor. remodel kitchen on 2nd floor.Details
remodel1 bathroom on ground floor, 1 on 2nd floor, 1 on 3rd floor. remodel kitchen on 2nd floor. | $60,000 |
| Nov 4, 2009 | Never finaled issued Nov 2009, no final | 1500 Powell St | remodel 1 bathroom on 3rd floor, bathroom have bath tub only, replace tub with shower pan, install 1 fan with flourscent lights, no moving or adding wallsDetails
remodel 1 bathroom on 3rd floor, bathroom have bath tub only, replace tub with shower pan, install 1 fan with flourscent lights, no moving or adding walls | $9,000 |
| Aug 10, 2009 | Expired or cancelled expired Dec 2010 | 324 Day St | revision to permit appl. #2008/1003/3378. relocate kitchen bedrooms, bathrooms, add office & study room at 2nd. floor.Details
revision to permit appl. #2008/1003/3378. relocate kitchen bedrooms, bathrooms, add office & study room at 2nd. floor. | $30,000 |
| Jul 2, 2009 | Completed final sign-off Nov 2013 | 132 Ward St | replace kitchen cabinets & fixtures. bathroom cabinets & fixture on 2nd floor. replace bathroom cabinets & fixture on ground floor. all fixtures location will stay the same. all lights in kitchen & bath will be fluorescent or meets title 24.Details
replace kitchen cabinets & fixtures. bathroom cabinets & fixture on 2nd floor. replace bathroom cabinets & fixture on ground floor. all fixtures location will stay the same. all lights in kitchen & bath will be fluorescent or meets title 24. | $16,000 |
| Feb 27, 2009 | Completed final sign-off Nov 2009 | 1282 41st Av | 2nd fl: remodel e kitchen and bath. add skylight in e kitchen, replace e windows in kind. gr fl convert into 2 bedrooms, and full bath. add skylights in hallway, full bath, and garage. relocate furnace,water heater, upgrde mech piping, ductwork, plumbing. install/add lighting,switches, receptaclesDetails
2nd fl: remodel e kitchen and bath. add skylight in e kitchen, replace e windows in kind. gr fl convert into 2 bedrooms, and full bath. add skylights in hallway, full bath, and garage. relocate furnace,water heater, upgrde mech piping, ductwork, plumbing. install/add lighting,switches, receptacles | $60,000 |
| Jun 26, 2008 | Completed final sign-off Oct 2008 | 75 Topeka Av | add one and a half bathrooms at (e) garage. add one window, enlarge (e) window at rear bedroom. excavate 6" to match with 4" concrete slab. resize (e) bedroom & (e) playroom.Details
add one and a half bathrooms at (e) garage. add one window, enlarge (e) window at rear bedroom. excavate 6" to match with 4" concrete slab. resize (e) bedroom & (e) playroom. | $15,000 |
| May 30, 2008 | Expired or cancelled expired Apr 2010 | 1334 Guerrero St | remodel kitchen and bathroom, flouresent lights in kitchen and bathroom. no structural work.Details
remodel kitchen and bathroom, flouresent lights in kitchen and bathroom. no structural work. | $7,000 |
| Mar 28, 2008 | Completed final sign-off Sep 2008 | 198 Judah St | remodel kitchen will use all fluorescent lights. remodel 3 bathrooms will use all fluorescent lights or use occupancy sensors.Details
remodel kitchen will use all fluorescent lights. remodel 3 bathrooms will use all fluorescent lights or use occupancy sensors. | $25,000 |
| Sep 26, 2007 | Expired or cancelled expired Jun 2008 | 2482 17th Av | comply with nov# 200718502. remodel 1 bathroom and add 1 new bathroom on the 2nd floor.Details
comply with nov# 200718502. remodel 1 bathroom and add 1 new bathroom on the 2nd floor. | $15,000 |
| Jul 3, 2007 | Completed final sign-off Oct 2007 | 70 Arleta Av | remodel e kitchen at 1st floor, construct 2 bedrooms, 1 full bathroom, and laundry room at ground floor, construct 7'x19' deck at rear of buildingDetails
remodel e kitchen at 1st floor, construct 2 bedrooms, 1 full bathroom, and laundry room at ground floor, construct 7'x19' deck at rear of building | $67,000 |
| Feb 23, 2007 | Completed final sign-off Jul 2007 | 234 Linden St | removel kitchen and bath in both units, remove fallen lath and plaster in basement, replace with 5/8 sheetrock. replace water damaged lath & plaster in 1st , 2nd floor ceiling with 5/8 sheetrock. repair dryrot in back of both units. about 12 sqft.Details
removel kitchen and bath in both units, remove fallen lath and plaster in basement, replace with 5/8 sheetrock. replace water damaged lath & plaster in 1st , 2nd floor ceiling with 5/8 sheetrock. repair dryrot in back of both units. about 12 sqft. | $48,000 |
| Feb 8, 2007 | Completed final sign-off Jul 2007 | 238 Linden St | remodel kitchen & bath in both units. remove fallen lath & plaster in basement ceilings . repair dryrot in back of both unit, about 12 ft. replace with/sheetrock. flourescent in kitchen & bathroom only . remove saggy lath & plaster on 1st fl ceiling, replace w/ 5/8 sheetrock. total new sheet rockDetails
remodel kitchen & bath in both units. remove fallen lath & plaster in basement ceilings . repair dryrot in back of both unit, about 12 ft. replace with/sheetrock. flourescent in kitchen & bathroom only . remove saggy lath & plaster on 1st fl ceiling, replace w/ 5/8 sheetrock. total new sheet rock | $48,000 |
| Sep 18, 2006 | Completed final sign-off Mar 2007 | 1351 41st Av | add rooms at g/f - add 2 bedrooms, 1 full bath, 1 storage, add rear deck and stairs, remodel bathroom & kitchen on 2nd floor to comply with nov. #200666990 (horizontal addition)Details
add rooms at g/f - add 2 bedrooms, 1 full bath, 1 storage, add rear deck and stairs, remodel bathroom & kitchen on 2nd floor to comply with nov. #200666990 (horizontal addition) | $30,000 |
| Jun 11, 2004 | Expired or cancelled expired Nov 2011 | 14 Costa St | remodel kitchen, bathroom, dryrot along side & front in kind cabinets + fixtures onlyDetails
remodel kitchen, bathroom, dryrot along side & front in kind cabinets + fixtures only | $36,000 |
| Jul 31, 2003 | Never finaled issued Aug 2005, no final | 2011 09th Av | remodel kitchen & bath & playroom. add 3rd level with study, 2 bedrooms & 2 baths.Details
remodel kitchen & bath & playroom. add 3rd level with study, 2 bedrooms & 2 baths. | $300,000 |