Christopher Wren Construction
- Based in
- San Francisco
- On San Francisco permits
- Jul 2001 to Apr 2010
- Last 24 months
- 0 permits filed
22 permits since 2000: 16 completed, 6 expired or cancelled.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Stairs permits
1 stairs permit: 1 completed. Typically 8 days from filing to permit and 169 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| May 13, 2008 | Completed final sign-off Nov 2008 | 2722 15th Av | install elevator, minor interior non-structural alteration. remove (e) stairs to accommodate elevator, widen bath door, new shear walls, framing @ removed bearing wall.Details
install elevator, minor interior non-structural alteration. remove (e) stairs to accommodate elevator, widen bath door, new shear walls, framing @ removed bearing wall. | $75,000 |