Back to bathroom remodel contractors
Christopher Wren Construction
- Based in
- San Francisco
- On San Francisco permits
- Jul 2001 to Apr 2010
- Last 24 months
- 0 permits filed
22 permits since 2000: 16 completed, 6 expired or cancelled.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
6 bathroom remodel permits: 6 completed. Typically 0 days from filing to permit and 89 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Feb 2, 2009 | Completed final sign-off Apr 2009 | 1342 20th St | bathroom remodel - replace tile, vanity, toilet & tub. install 100% fluorescent fixturesDetails
bathroom remodel - replace tile, vanity, toilet & tub. install 100% fluorescent fixtures | $10,000 |
| May 13, 2008 | Completed final sign-off Nov 2008 | 2722 15th Av | install elevator, minor interior non-structural alteration. remove (e) stairs to accommodate elevator, widen bath door, new shear walls, framing @ removed bearing wall.Details
install elevator, minor interior non-structural alteration. remove (e) stairs to accommodate elevator, widen bath door, new shear walls, framing @ removed bearing wall. | $75,000 |
| Jan 4, 2008 | Completed final sign-off Mar 2008 | 3431 22nd St | work @ # 3433 only. remove bath ceiling to update lighting, insulate, drywall & install fan. (n) lighting to be flourescent 100% or switched by occupant sensor. elec. work under separate permit. no other changes.Details
work @ # 3433 only. remove bath ceiling to update lighting, insulate, drywall & install fan. (n) lighting to be flourescent 100% or switched by occupant sensor. elec. work under separate permit. no other changes. | $7,000 |
| Feb 27, 2006 | Completed final sign-off Jul 2006 | 776 Ulloa St | 2nd floor bathroom remodeled; fixtures moved, floor retiled, wall around bath & behind sink (splash) tiled. wall insolation added. no structural work.Details
2nd floor bathroom remodeled; fixtures moved, floor retiled, wall around bath & behind sink (splash) tiled. wall insolation added. no structural work. | $28,000 |
| Sep 4, 2001 | Completed final sign-off Dec 2001 | 3256 16th St | install tile in bath flr,entry flr,kitchen flr,dining room flr. no structural work.Details
install tile in bath flr,entry flr,kitchen flr,dining room flr. no structural work. | $4,500 |
| Jul 3, 2001 | Completed final sign-off Sep 2001 | 405 Clipper St | replace kitchen cabinets, sink, countertops, install gypsum in bathroom, install new wc, bathtubDetails
replace kitchen cabinets, sink, countertops, install gypsum in bathroom, install new wc, bathtub | $12,000 |