Christopher Rose
- Based in
- Mill Valley
- On San Francisco permits
- Feb 2012 to Sep 2021
- Last 24 months
- 0 permits filed
8 permits since 2000: 6 completed, 2 never finaled.
Of the 2 never-finaled permits, 1 is 5 to 10 years old, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Stairs permits
2 stairs permits: 1 completed, 1 never finaled. Typically 170 days from filing to permit and 161 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 5, 2020 | Never finaled issued Aug 2020, no final | 2456 Vallejo St | replace and repair rotted treads and frame in kind on existing egress stair located in west side light well. replacing less than 50% of the stairs.Details
replace and repair rotted treads and frame in kind on existing egress stair located in west side light well. replacing less than 50% of the stairs. | $15,000 |
| Sep 12, 2017 | Completed final sign-off Jan 2019 | 1308 Taylor St | construct new roof access stair / enclosure with roof deck. no new conditioned space.Details
construct new roof access stair / enclosure with roof deck. no new conditioned space. | $14,000 |