Christopher Rose
- Based in
- Mill Valley
- On San Francisco permits
- Feb 2012 to Sep 2021
- Last 24 months
- 0 permits filed
8 permits since 2000: 6 completed, 2 never finaled.
Of the 2 never-finaled permits, 1 is 5 to 10 years old, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Kitchen remodel permits
5 kitchen remodel permits: 4 completed, 1 never finaled. Typically 9 days from filing to permit and 218 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 1, 2021 | Completed final sign-off Nov 2024 | 500 Bella Vista Wy | remodel (e) kitchen and (e) master and lower level bathrooms. new fixtures, cabinets & tilesDetails
remodel (e) kitchen and (e) master and lower level bathrooms. new fixtures, cabinets & tiles | $50,000 |
| Dec 15, 2015 | Never finaled issued Oct 2016, no final | 1991 09th Av | horizontal addition of 72 sq ft @ ground fl & 1st fl. unconditioned space conversion of 228 sq ft @ ground fl & interior wall reconfiguration on ground & 1st fl. includes kitchen remodel, (n) bathroom & powder bath & (n) laundry room.Details
horizontal addition of 72 sq ft @ ground fl & 1st fl. unconditioned space conversion of 228 sq ft @ ground fl & interior wall reconfiguration on ground & 1st fl. includes kitchen remodel, (n) bathroom & powder bath & (n) laundry room. | $100,000 |
| Dec 31, 2014 | Completed final sign-off Aug 2015 | 160 Collins St | 2nd floor: remodel kitchen, install new beam, add half bath. 3rd floor:add bathroom, remodel bedroom.replacement window wood only.Details
2nd floor: remodel kitchen, install new beam, add half bath. 3rd floor:add bathroom, remodel bedroom.replacement window wood only. | $50,000 |
| Oct 26, 2012 | Completed final sign-off May 2013 | 40 Quartz Wy | remodel existing kitchen, relocate existing window wall, relocate toilet in powder room.Details
remodel existing kitchen, relocate existing window wall, relocate toilet in powder room. | $20,000 |
| May 11, 2012 | Completed final sign-off Aug 2012 | 143 02nd Av | remodel (e) kitchen, bathroom & powder room. lighting shall comply w/ cec 150 (k). exhaust termination on side 3' min from pl & openings.Details
remodel (e) kitchen, bathroom & powder room. lighting shall comply w/ cec 150 (k). exhaust termination on side 3' min from pl & openings. | $22,000 |