Back to kitchen remodel contractors
Chiang C M Construction Inc.
- Based in
- San Francisco
- On San Francisco permits
- Sep 2000 to Sep 2026
- Last 24 months
- 8 permits filed
106 permits since 2000: 69 completed, 9 in progress, 15 never finaled, 13 expired or cancelled.
Of the 15 never-finaled permits, 4 are 3 to 5 years old, 4 are 5 to 10 years old, 7 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
14 kitchen remodel permits: 12 completed, 1 in progress, 1 never finaled. Typically 2 days from filing to permit and 178 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 23, 2025 | Completed final sign-off Sep 2025 | 354 23rd Av | in kind remodel of (2) bathrooms. replace kitchen cabinets.Details
in kind remodel of (2) bathrooms. replace kitchen cabinets. | $20,000 |
| Jun 11, 2024 | Completed final sign-off Aug 2024 | 356 23rd Av | remodel 1 kitchen and 2 bathrooms in kind. no removal of wallsDetails
remodel 1 kitchen and 2 bathrooms in kind. no removal of walls | $16,000 |
| Feb 29, 2024 | In progress issued Feb 2024 | 322 30th Av | revision to pa# 2016-1222-5772 new kitchen layout, install and relocate new gas meter and electrical meter. new wall for storage area. new ceiling layout. new windows in the rearDetails
revision to pa# 2016-1222-5772 new kitchen layout, install and relocate new gas meter and electrical meter. new wall for storage area. new ceiling layout. new windows in the rear | $40,000 |
| Nov 16, 2023 | Completed final sign-off Mar 2025 | 2238 41st Av | 2nd floor kitchen and bathroom remodel. replace all windows, not the windows at the front facade.Details
2nd floor kitchen and bathroom remodel. replace all windows, not the windows at the front facade. | $140,000 |
| Oct 27, 2023 | Completed final sign-off Dec 2023 | 1000 North Point St | unit #1206: replace flooring and fixtures in bathroom in kind. replace countertop and appliances in kitchen in kind. relocate electrical panel.Details
unit #1206: replace flooring and fixtures in bathroom in kind. replace countertop and appliances in kitchen in kind. relocate electrical panel. | $10,000 |
| May 4, 2023 | Never finaled issued May 2023, no final | 33 Marne Av | interior remodel to provide accessiblity upgrades to existing single family dwelling including kitchen, bathroom, and stairs. associated electrical and plumbing works. interior workDetails
interior remodel to provide accessiblity upgrades to existing single family dwelling including kitchen, bathroom, and stairs. associated electrical and plumbing works. interior work | $140,289 |
| Sep 27, 2022 | Completed final sign-off Mar 2023 | 2018 Laguna St | in-kind (1) kitchen & (1) bath remodel, addition of recessed lights with 1 hr rated housing, convert bathtub to shower.Details
in-kind (1) kitchen & (1) bath remodel, addition of recessed lights with 1 hr rated housing, convert bathtub to shower. | $30,000 |
| Sep 13, 2019 | Completed final sign-off Dec 2019 | 1571 09th Av | remove all (e) kitchen cabinets & replace w/ new. (n) counter top, sink & faucet, electrical outlets, floors. change bathroom bathtub & faucet, replace tile all in same location.Details
remove all (e) kitchen cabinets & replace w/ new. (n) counter top, sink & faucet, electrical outlets, floors. change bathroom bathtub & faucet, replace tile all in same location. | $18,000 |
| Apr 2, 2018 | Completed final sign-off Jan 2019 | 37 Waverly Pl | to comply with notice of violation 201768884. fire damge repair of floors, walls, & ceilings in kitchen, bathrooms, bedrooms, and stirways. reinstall kitchen cabinets, electrical and plumbing work. no structural damage and no structural work. all repair to be in-kind.Details
to comply with notice of violation 201768884. fire damge repair of floors, walls, & ceilings in kitchen, bathrooms, bedrooms, and stirways. reinstall kitchen cabinets, electrical and plumbing work. no structural damage and no structural work. all repair to be in-kind. | $68,500 |
| Aug 4, 2017 | Completed final sign-off Apr 2018 | 41 Waverly Pl | 3rd fl only: construct a temporary tenant relocation room for apt repair work. modify (e) heating duct to new temporary room. modify kitchen cabinets & sink in common kitchen. provide lighting, outlets. sprinkler modifications and fire alarm on separate permit.Details
3rd fl only: construct a temporary tenant relocation room for apt repair work. modify (e) heating duct to new temporary room. modify kitchen cabinets & sink in common kitchen. provide lighting, outlets. sprinkler modifications and fire alarm on separate permit. | $3,800 |
| Sep 8, 2011 | Completed final sign-off Jul 2012 | 550 Leavenworth St | revision to appl #201106107848: proposes additional repair work throughout bldg includes interior work in kitchens, bathrooms, closets & bedrooms in apartment units. additoinal plbg, elec, lighting & mech work to be design/build under separate permit.Details
revision to appl #201106107848: proposes additional repair work throughout bldg includes interior work in kitchens, bathrooms, closets & bedrooms in apartment units. additoinal plbg, elec, lighting & mech work to be design/build under separate permit. | $30,000 |
| Sep 15, 2010 | Completed final sign-off Feb 2012 | 4800 03rd St | 1st time tenant improvement, existing retail space, e underground plumbing and slab, e stub ducting for type 1 hood. space to be converted into full service restaurant, new partition walls, new toilets, new kitchen & dining area. chang of occupancy from b-retail to an a occupancy restaurantDetails
1st time tenant improvement, existing retail space, e underground plumbing and slab, e stub ducting for type 1 hood. space to be converted into full service restaurant, new partition walls, new toilets, new kitchen & dining area. chang of occupancy from b-retail to an a occupancy restaurant | $387,500 |
| Sep 2, 2009 | Completed final sign-off Jul 2013 | 5735 Mission St | add to (e) 2 story building converting it to a 3 story senior care home, 1st floor has: multipurpose room, offices, kitchen, h.c. toilets, elevator & machine rooms. 2nd floor has 11 double occupancy bedrooms with bedrooms & staff room.lounge area. 3rd floor has double occupancy bedroom, bathDetails
add to (e) 2 story building converting it to a 3 story senior care home, 1st floor has: multipurpose room, offices, kitchen, h.c. toilets, elevator & machine rooms. 2nd floor has 11 double occupancy bedrooms with bedrooms & staff room.lounge area. 3rd floor has double occupancy bedroom, bath | $1,500,000 |
| May 4, 2001 | Completed final sign-off Jun 2001 | 101 Concord St | repair kitchen counter top, cabinets, bathrms, floors, wall and tiles.Details
repair kitchen counter top, cabinets, bathrms, floors, wall and tiles. | $5,000 |