Back to bathroom remodel contractors
Chiang C M Construction Inc.
- Based in
- San Francisco
- On San Francisco permits
- Sep 2000 to Sep 2026
- Last 24 months
- 8 permits filed
106 permits since 2000: 69 completed, 9 in progress, 15 never finaled, 13 expired or cancelled.
Of the 15 never-finaled permits, 4 are 3 to 5 years old, 4 are 5 to 10 years old, 7 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
17 bathroom remodel permits: 15 completed, 2 never finaled. Typically 14 days from filing to permit and 261 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 23, 2025 | Completed final sign-off Sep 2025 | 354 23rd Av | in kind remodel of (2) bathrooms. replace kitchen cabinets.Details
in kind remodel of (2) bathrooms. replace kitchen cabinets. | $20,000 |
| Jun 11, 2024 | Completed final sign-off Aug 2024 | 356 23rd Av | remodel 1 kitchen and 2 bathrooms in kind. no removal of wallsDetails
remodel 1 kitchen and 2 bathrooms in kind. no removal of walls | $16,000 |
| Nov 16, 2023 | Completed final sign-off Mar 2025 | 2238 41st Av | 2nd floor kitchen and bathroom remodel. replace all windows, not the windows at the front facade.Details
2nd floor kitchen and bathroom remodel. replace all windows, not the windows at the front facade. | $140,000 |
| Oct 27, 2023 | Completed final sign-off Dec 2023 | 1000 North Point St | unit #1206: replace flooring and fixtures in bathroom in kind. replace countertop and appliances in kitchen in kind. relocate electrical panel.Details
unit #1206: replace flooring and fixtures in bathroom in kind. replace countertop and appliances in kitchen in kind. relocate electrical panel. | $10,000 |
| May 4, 2023 | Never finaled issued May 2023, no final | 33 Marne Av | interior remodel to provide accessiblity upgrades to existing single family dwelling including kitchen, bathroom, and stairs. associated electrical and plumbing works. interior workDetails
interior remodel to provide accessiblity upgrades to existing single family dwelling including kitchen, bathroom, and stairs. associated electrical and plumbing works. interior work | $140,289 |
| Apr 20, 2023 | Completed final sign-off Apr 2024 | 1250 Hyde St | apt#1: revision amendments to pa# 201706300866, interior layout changes, interior layout change from (1) bathroom to (2) bathrooms. relocate garage man door , show 2nd stairs in courtyard, remmove non-bearing walls in living rm, reome (2) south facing windows in lightwell, enlarge windowDetails
apt#1: revision amendments to pa# 201706300866, interior layout changes, interior layout change from (1) bathroom to (2) bathrooms. relocate garage man door , show 2nd stairs in courtyard, remmove non-bearing walls in living rm, reome (2) south facing windows in lightwell, enlarge window | $10,000 |
| Sep 27, 2022 | Completed final sign-off Mar 2023 | 2018 Laguna St | in-kind (1) kitchen & (1) bath remodel, addition of recessed lights with 1 hr rated housing, convert bathtub to shower.Details
in-kind (1) kitchen & (1) bath remodel, addition of recessed lights with 1 hr rated housing, convert bathtub to shower. | $30,000 |
| Jan 12, 2022 | Completed final sign-off Oct 2023 | 327 Vernon St | in-kind remodeling of 1 bathroom(s) in 2nd fl with 0 shower pan(s).Details
in-kind remodeling of 1 bathroom(s) in 2nd fl with 0 shower pan(s). | $13,500 |
| Oct 24, 2019 | Completed final sign-off Dec 2019 | 2315 Mission St | apt 201: replace existing damage cabinets, countertop, bath tile and shower.Details
apt 201: replace existing damage cabinets, countertop, bath tile and shower. | $8,200 |
| Sep 13, 2019 | Completed final sign-off Dec 2019 | 1571 09th Av | remove all (e) kitchen cabinets & replace w/ new. (n) counter top, sink & faucet, electrical outlets, floors. change bathroom bathtub & faucet, replace tile all in same location.Details
remove all (e) kitchen cabinets & replace w/ new. (n) counter top, sink & faucet, electrical outlets, floors. change bathroom bathtub & faucet, replace tile all in same location. | $18,000 |
| Apr 2, 2018 | Completed final sign-off Jan 2019 | 37 Waverly Pl | to comply with notice of violation 201768884. fire damge repair of floors, walls, & ceilings in kitchen, bathrooms, bedrooms, and stirways. reinstall kitchen cabinets, electrical and plumbing work. no structural damage and no structural work. all repair to be in-kind.Details
to comply with notice of violation 201768884. fire damge repair of floors, walls, & ceilings in kitchen, bathrooms, bedrooms, and stirways. reinstall kitchen cabinets, electrical and plumbing work. no structural damage and no structural work. all repair to be in-kind. | $68,500 |
| Aug 11, 2017 | Completed final sign-off Apr 2018 | 41 Waverly Pl | 3rd fl: construct & renovate common bath & toilet on 3rd floor. new lighting, exhaust fan in remodeled area. sprinkler deferred; fire alarm deferred if required.Details
3rd fl: construct & renovate common bath & toilet on 3rd floor. new lighting, exhaust fan in remodeled area. sprinkler deferred; fire alarm deferred if required. | $35,000 |
| Dec 22, 2016 | Never finaled issued Dec 2020, no final | 322 30th Av | convert storage space into (1) adu for a total of 7 units. (n) unit to be 2 bdrm, 1 bath. (n) unit under ordinance 162-16. refer to pa #2016-1104-2016 for soft story retrofit.Details
convert storage space into (1) adu for a total of 7 units. (n) unit to be 2 bdrm, 1 bath. (n) unit under ordinance 162-16. refer to pa #2016-1104-2016 for soft story retrofit. | $20,000 |
| Oct 25, 2016 | Completed final sign-off Apr 2018 | 41 Waverly Pl | construct & renovate common bath & toilets on the 4th floor. new lighting, exhaust fans at remodel area.Details
construct & renovate common bath & toilets on the 4th floor. new lighting, exhaust fans at remodel area. | $20,000 |
| Sep 8, 2011 | Completed final sign-off Jul 2012 | 550 Leavenworth St | revision to appl #201106107848: proposes additional repair work throughout bldg includes interior work in kitchens, bathrooms, closets & bedrooms in apartment units. additoinal plbg, elec, lighting & mech work to be design/build under separate permit.Details
revision to appl #201106107848: proposes additional repair work throughout bldg includes interior work in kitchens, bathrooms, closets & bedrooms in apartment units. additoinal plbg, elec, lighting & mech work to be design/build under separate permit. | $30,000 |
| Aug 30, 2010 | Completed final sign-off Dec 2012 | 827 Pacific Av | renovate exist 2 stories& bsmt commercial bldg for offices & storage. seismic upgrade (foundation & structure). mechanical & electrical systems, compliance with ada by building new front entry, stairs, elevator and bathrooms.Details
renovate exist 2 stories& bsmt commercial bldg for offices & storage. seismic upgrade (foundation & structure). mechanical & electrical systems, compliance with ada by building new front entry, stairs, elevator and bathrooms. | $1,740,000 |
| Sep 2, 2009 | Completed final sign-off Jul 2013 | 5735 Mission St | add to (e) 2 story building converting it to a 3 story senior care home, 1st floor has: multipurpose room, offices, kitchen, h.c. toilets, elevator & machine rooms. 2nd floor has 11 double occupancy bedrooms with bedrooms & staff room.lounge area. 3rd floor has double occupancy bedroom, bathDetails
add to (e) 2 story building converting it to a 3 story senior care home, 1st floor has: multipurpose room, offices, kitchen, h.c. toilets, elevator & machine rooms. 2nd floor has 11 double occupancy bedrooms with bedrooms & staff room.lounge area. 3rd floor has double occupancy bedroom, bath | $1,500,000 |