Back to kitchen remodel contractors
Chavez Plumbing
- Based in
- San Francisco
- On San Francisco permits
- Feb 2009 to Sep 2026
- Last 24 months
- 8 permits filed
97 permits since 2000: 81 completed, 4 in progress, 10 never finaled, 2 expired or cancelled.
Of the 10 never-finaled permits, 3 are 3 to 5 years old, 7 are over 10 years old. 1 was filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
35 kitchen remodel permits: 30 completed, 1 in progress, 3 never finaled, 1 expired or cancelled. Typically 0 days from filing to permit and 128 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Nov 17, 2025 | In progress issued Nov 2025 | 2917 25th St | kitchen and bathroom remodel including- replacement of plumbing and electrical fixtures. flooring cabinets and appliances. no structural work to be done and existing layout to remain. all like for like.Details
kitchen and bathroom remodel including- replacement of plumbing and electrical fixtures. flooring cabinets and appliances. no structural work to be done and existing layout to remain. all like for like. | $65,000 |
| Oct 20, 2025 | Completed final sign-off Feb 2026 | 446 Guerrero St | installation of new laundry machines at existing kitchen area with new plumbing and electric for dryer, new wine fridge cabinets, countertop.Details
installation of new laundry machines at existing kitchen area with new plumbing and electric for dryer, new wine fridge cabinets, countertop. | $12,000 |
| Aug 11, 2022 | Completed final sign-off Feb 2023 | 1595 37th Av | kitchen & bathroom remodel. replace plumbing and electrical fixtures. new cabinets. install flooring, drywall. no walls to be removed or relocated. all walls to remain. all work in kind.Details
kitchen & bathroom remodel. replace plumbing and electrical fixtures. new cabinets. install flooring, drywall. no walls to be removed or relocated. all walls to remain. all work in kind. | $48,000 |
| Jun 14, 2022 | Completed final sign-off Nov 2022 | 1961 16th Av | kitchen remodel including new plumbing electrical wiring insulation, drywall, flooring, cabinets and window replacement no structural work to be done all walls to remainDetails
kitchen remodel including new plumbing electrical wiring insulation, drywall, flooring, cabinets and window replacement no structural work to be done all walls to remain | $42,000 |
| May 30, 2018 | Completed final sign-off Aug 2018 | 878 Alvarado St | kitchen remodel replace cabinets, plumbing and electrical fixtures and drywall behind cabinets. no structural work to be done. kitchen area 12'x12'Details
kitchen remodel replace cabinets, plumbing and electrical fixtures and drywall behind cabinets. no structural work to be done. kitchen area 12'x12' | $12,000 |
| Sep 21, 2016 | Completed final sign-off Feb 2017 | 162 Flood Av | revision to 201608124928: interior renovation at 2nd floor - reconfigure floor plan. move location of bathroom add sink & toilet, kitchen, replace 2 windows in kind at light wellsDetails
revision to 201608124928: interior renovation at 2nd floor - reconfigure floor plan. move location of bathroom add sink & toilet, kitchen, replace 2 windows in kind at light wells | $68,000 |
| Aug 23, 2016 | Completed final sign-off Jan 2017 | 1223 Arguello Bl | kitchen remodel including replacment of cabinets appliances, lights fixtures, flooring and counter top. all walls to remain, no structural work & needed.Details
kitchen remodel including replacment of cabinets appliances, lights fixtures, flooring and counter top. all walls to remain, no structural work & needed. | $10,000 |
| Aug 12, 2016 | Completed final sign-off Feb 2017 | 162 Flood Av | kitchen remodel at same location ; no structural work, existing walls to remain ; replace plumbing and electrical fixtures and applicances.Details
kitchen remodel at same location ; no structural work, existing walls to remain ; replace plumbing and electrical fixtures and applicances. | $50,000 |
| May 5, 2016 | Completed final sign-off Oct 2016 | 457 Diamond St | rev. to pa#201604154892 kitchen remodel, additional work to this job is relocate kitchen, construct new deck and remove non bearing walls.Details
rev. to pa#201604154892 kitchen remodel, additional work to this job is relocate kitchen, construct new deck and remove non bearing walls. | $40,000 |
| Apr 15, 2016 | Completed final sign-off Oct 2016 | 457 Diamond St | kitchen remodel including appliances removal, cabinets, interior lathe and plaster, counter tops, flooring, all walls to be remain. no moving or relocating walls. 30" min b/w cabinet and cooking top. provide range hood.Details
kitchen remodel including appliances removal, cabinets, interior lathe and plaster, counter tops, flooring, all walls to be remain. no moving or relocating walls. 30" min b/w cabinet and cooking top. provide range hood. | $8,000 |
| Nov 5, 2015 | Completed final sign-off Apr 2016 | 363 29th St | kitchen & bathroom remodel, new bathroom addition at (e) closet on 2nd floor.Details
kitchen & bathroom remodel, new bathroom addition at (e) closet on 2nd floor. | $20,000 |
| Sep 9, 2015 | Completed final sign-off Nov 2015 | 32 Yukon St | kitchen remodel including new flooring, cabinets, countertops, drywall, painting, electrical, plumbing & appliances. no structural work to be done.Details
kitchen remodel including new flooring, cabinets, countertops, drywall, painting, electrical, plumbing & appliances. no structural work to be done. | $12,000 |
| Feb 26, 2015 | Completed final sign-off Apr 2015 | 1630 42nd Av | kitchen remodelling on 2nd floor: replace cabinets, flooring, countertop, plumbing amd electrical fixtures, no structural work, no new wall and existing wall to be remain. lighting shall comply with cec 150.0(k)3.Details
kitchen remodelling on 2nd floor: replace cabinets, flooring, countertop, plumbing amd electrical fixtures, no structural work, no new wall and existing wall to be remain. lighting shall comply with cec 150.0(k)3. | $15,000 |
| Aug 8, 2014 | Never finaled issued Aug 2014, no final | 143 Jersey St | increase existing living room opening to max 6'-0". new header and post. 2 18" partitions adjacent to stairway to be removed and reinforce framing. replace window at kitchen level rear. replace rear deck post. add 2 beam at basement to receive loads from new living, new living room openings,Details
increase existing living room opening to max 6'-0". new header and post. 2 18" partitions adjacent to stairway to be removed and reinforce framing. replace window at kitchen level rear. replace rear deck post. add 2 beam at basement to receive loads from new living, new living room openings, | $21,000 |
| Jun 3, 2014 | Never finaled issued Jun 2014, no final | 143 Jersey St | revision to 9926237, renewal of bpa#201406037382. kitchen and bathroom remodel on 2nd floor and other work per plan. convert green house to office. 3rd fl wash/dryerDetails
revision to 9926237, renewal of bpa#201406037382. kitchen and bathroom remodel on 2nd floor and other work per plan. convert green house to office. 3rd fl wash/dryer | $55,000 |
| May 27, 2014 | Completed final sign-off Sep 2014 | 3326 Cabrillo St | infill window in hallway, remove non-bearing wall in kitchen, remove partition wall in breakfast room. remodel kitchen and one bath.Details
infill window in hallway, remove non-bearing wall in kitchen, remove partition wall in breakfast room. remodel kitchen and one bath. | $21,000 |
| May 5, 2014 | Completed final sign-off May 2014 | 727 35th Av | revision to 201401156397. change layout of 3rd fl master bath. infill window. 2nd fl : change layout at kitchen. relocate windowsDetails
revision to 201401156397. change layout of 3rd fl master bath. infill window. 2nd fl : change layout at kitchen. relocate windows | $1,000 |
| May 5, 2014 | Completed final sign-off Sep 2014 | 3326 Cabrillo St | kitchen remodel including repalceing cabinets , appliances, plumbing & electrical fixtures, no structural work.Details
kitchen remodel including repalceing cabinets , appliances, plumbing & electrical fixtures, no structural work. | $12,000 |
| May 5, 2014 | Completed final sign-off Jul 2014 | 3332 Cabrillo St | to comply with complaint # 201471682, kitchen remodel, repalce cabi nets, plumbing, electrical , fixtures and appliances. no structural workDetails
to comply with complaint # 201471682, kitchen remodel, repalce cabi nets, plumbing, electrical , fixtures and appliances. no structural work | $12,000 |
| Dec 9, 2013 | Completed final sign-off Feb 2014 | 723 35th Av | kitchen remodel, replace plumbing and electrical fixtures. remodel 2 bathrooms, replace plumbing and electrical fixtures. existing wall to remain, no structural work to be done. no wall modificationsDetails
kitchen remodel, replace plumbing and electrical fixtures. remodel 2 bathrooms, replace plumbing and electrical fixtures. existing wall to remain, no structural work to be done. no wall modifications | $30,000 |
| Aug 12, 2013 | Completed final sign-off Apr 2014 | 1914 Pine St | kitchen remodel including demolition and install new plumbing, electrical fixtures, cabinets, flooring, counter tops, appliances, no structural work to be done.Details
kitchen remodel including demolition and install new plumbing, electrical fixtures, cabinets, flooring, counter tops, appliances, no structural work to be done. | $14,000 |
| Aug 5, 2013 | Completed final sign-off Nov 2013 | 32 Ridgewood Av | relocate kitchen to rear bedroom. install new 1/2 bath at former kitchen area, new window at new kitchen area in existing opening, 6'0" sliding glass door at rearDetails
relocate kitchen to rear bedroom. install new 1/2 bath at former kitchen area, new window at new kitchen area in existing opening, 6'0" sliding glass door at rear | $25,000 |
| Jul 11, 2013 | Completed final sign-off Sep 2013 | 1730 Broderick St | kitchen remodel inclcuding replacement of cabinets, flooring, countertops, appliances, plumbing and electrical fixtures. no structural work to be done (e) walls to remain.Details
kitchen remodel inclcuding replacement of cabinets, flooring, countertops, appliances, plumbing and electrical fixtures. no structural work to be done (e) walls to remain. | $12,000 |
| Jul 3, 2013 | Completed final sign-off Dec 2013 | 2261 Bush St | revision to 201304154492.reconfigure laundy/bath area, change 3 fixed windows at kitchen to 1 fixed window, change pane of doors at living room to sliding doorDetails
revision to 201304154492.reconfigure laundy/bath area, change 3 fixed windows at kitchen to 1 fixed window, change pane of doors at living room to sliding door | |
| Apr 15, 2013 | Completed final sign-off Dec 2013 | 2261 Bush St | unit #6-relocate kitchen & half bathroom & laundry, replace single door with french doors, add 2 windows at new kitchen. replace master bathroom tub with shower. replace vanity at bathroom #2, replace closet doors at bedrooms 1 & 2Details
unit #6-relocate kitchen & half bathroom & laundry, replace single door with french doors, add 2 windows at new kitchen. replace master bathroom tub with shower. replace vanity at bathroom #2, replace closet doors at bedrooms 1 & 2 | $53,000 |
| Mar 15, 2013 | Completed final sign-off May 2013 | 1145 Green St | kitchen remodel - replace electrical and plumbing fixtures, replace cabinets, flooring countertop; no structural work to be done existing wall to remainDetails
kitchen remodel - replace electrical and plumbing fixtures, replace cabinets, flooring countertop; no structural work to be done existing wall to remain | $13,000 |
| Oct 23, 2012 | Expired or cancelled expired Jun 2015 | 90 Ravenwood Dr | kitchen remodel including: replace counter tops, tile floor, appliances, plumbing and electrical fixtures, existing cabinets to remain. kitchen is on 2/f, no change to wall and opening layout.Details
kitchen remodel including: replace counter tops, tile floor, appliances, plumbing and electrical fixtures, existing cabinets to remain. kitchen is on 2/f, no change to wall and opening layout. | $12,000 |
| Feb 3, 2011 | Completed final sign-off Mar 2011 | 1480 Golden Gate Av | kitchen remodel in kind, no structural work, upgrade electrical and plumbing for kitchen only.Details
kitchen remodel in kind, no structural work, upgrade electrical and plumbing for kitchen only. | $12,000 |
| Oct 7, 2010 | Never finaled issued Oct 2010, no final | 1955 Beach St | remodel one bathroom, plumbing and electrical fixtures relocation. high efficacy lighting or occupancy sensor. kitchen work open walls to inspect electrical wires only. at least 50% high efficacy in kitchen, no chagne to exhaust system.Details
remodel one bathroom, plumbing and electrical fixtures relocation. high efficacy lighting or occupancy sensor. kitchen work open walls to inspect electrical wires only. at least 50% high efficacy in kitchen, no chagne to exhaust system. | $10,000 |
| Sep 24, 2010 | Completed final sign-off Dec 2010 | 301 Lincoln Wy | kitchen remodel, replace window, cabinet and sloor replacement; installation of new plumbing for washer and dryer; new electrical for kitchen. new window u-factor 0.40 max. dryer exhaust termination on wall not penetrating any fire rated floors.Details
kitchen remodel, replace window, cabinet and sloor replacement; installation of new plumbing for washer and dryer; new electrical for kitchen. new window u-factor 0.40 max. dryer exhaust termination on wall not penetrating any fire rated floors. | $15,000 |
| Jul 14, 2010 | Completed final sign-off Oct 2010 | 1221 Noe St | kitchen & one bathroom remodeling, plumbing & electrical fixtures relocation for kitchen and bath only. no wall relocation or remove. kitchen: replace counter & cabinet. bathroom: replace plumbing fixtures, new lighting.Details
kitchen & one bathroom remodeling, plumbing & electrical fixtures relocation for kitchen and bath only. no wall relocation or remove. kitchen: replace counter & cabinet. bathroom: replace plumbing fixtures, new lighting. | $38,000 |
| Apr 9, 2010 | Completed final sign-off Apr 2011 | 1302 Cortland Av | add bedroom, family room & full bathroom at garage floor, add interior stairs from 2nd floor to ground floor. relocate bathroom, new bathroom, remove (e) kitchen, repair exterior stairs to back yardDetails
add bedroom, family room & full bathroom at garage floor, add interior stairs from 2nd floor to ground floor. relocate bathroom, new bathroom, remove (e) kitchen, repair exterior stairs to back yard | $35,000 |
| Aug 11, 2009 | Completed final sign-off Jan 2010 | 3756 23rd St | interior renovations. remodel kitchen. add powder room @ 2nd level and remove (e) bath @ 2nd level. create interior stairway from (e) garage to 2nd level. create new master bath @ 3rd level. remodel (e) bath.Details
interior renovations. remodel kitchen. add powder room @ 2nd level and remove (e) bath @ 2nd level. create interior stairway from (e) garage to 2nd level. create new master bath @ 3rd level. remodel (e) bath. | $49,500 |
| Jul 7, 2009 | Completed final sign-off Oct 2009 | 2540 16th Av | revision to appl #200703267215 -keep(e) kitchen & bedroom #1 @ 2nd floor, eliminate 1/2 bath @ 2nd floor, add full bath & 1 bedroom @ ground floor, relocate family room from 2nf floor to ground floor.Details
revision to appl #200703267215 -keep(e) kitchen & bedroom #1 @ 2nd floor, eliminate 1/2 bath @ 2nd floor, add full bath & 1 bedroom @ ground floor, relocate family room from 2nf floor to ground floor. | $8,000 |
| Mar 10, 2009 | Completed final sign-off Aug 2009 | 1435 12th Av | interior kitchen remodel, interior bathroom remodel, interior master bedroom remodel, master bathroom added on 2nd floor, replace (e) aluminum windows at front with new wood windowsDetails
interior kitchen remodel, interior bathroom remodel, interior master bedroom remodel, master bathroom added on 2nd floor, replace (e) aluminum windows at front with new wood windows | $68,000 |