Back to bathroom remodel contractors
Chavez Plumbing
- Based in
- San Francisco
- On San Francisco permits
- Feb 2009 to Sep 2026
- Last 24 months
- 8 permits filed
97 permits since 2000: 81 completed, 4 in progress, 10 never finaled, 2 expired or cancelled.
Of the 10 never-finaled permits, 3 are 3 to 5 years old, 7 are over 10 years old. 1 was filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
38 bathroom remodel permits: 32 completed, 2 in progress, 3 never finaled, 1 expired or cancelled. Typically 1 days from filing to permit and 106 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Feb 23, 2026 | In progress issued Mar 2026 | 2917 25th St | rev to 202512302942: at top floor, add shower to (e) 1/2 bath, replace 1 window in-kind at rear yard. install new ventless washer/dryer.Details
rev to 202512302942: at top floor, add shower to (e) 1/2 bath, replace 1 window in-kind at rear yard. install new ventless washer/dryer. | $14,000 |
| Dec 30, 2025 | Completed final sign-off Sep 2026 | 2917 25th St | at top level: remodel of one full bathroom and one half bathroom located at top level, replace plumbing fixture, flooring, cabinets, electrical fixtures, no structural work to be done. replace electrical as needed.Details
at top level: remodel of one full bathroom and one half bathroom located at top level, replace plumbing fixture, flooring, cabinets, electrical fixtures, no structural work to be done. replace electrical as needed. | $38,000 |
| Nov 17, 2025 | In progress issued Nov 2025 | 2917 25th St | kitchen and bathroom remodel including- replacement of plumbing and electrical fixtures. flooring cabinets and appliances. no structural work to be done and existing layout to remain. all like for like.Details
kitchen and bathroom remodel including- replacement of plumbing and electrical fixtures. flooring cabinets and appliances. no structural work to be done and existing layout to remain. all like for like. | $65,000 |
| Jun 14, 2023 | Completed final sign-off Nov 2023 | 3425 16th St | convert closet in to half bath addition. new skylight. installation of new gas fireplace.Details
convert closet in to half bath addition. new skylight. installation of new gas fireplace. | $48,000 |
| Aug 11, 2022 | Completed final sign-off Feb 2023 | 1595 37th Av | kitchen & bathroom remodel. replace plumbing and electrical fixtures. new cabinets. install flooring, drywall. no walls to be removed or relocated. all walls to remain. all work in kind.Details
kitchen & bathroom remodel. replace plumbing and electrical fixtures. new cabinets. install flooring, drywall. no walls to be removed or relocated. all walls to remain. all work in kind. | $48,000 |
| Mar 19, 2018 | Completed final sign-off Jun 2018 | 263 Missouri St | bathroom remodel, replace plumbing and electrical fixtures. new insulation, drywall, tile, no structural work to be done.Details
bathroom remodel, replace plumbing and electrical fixtures. new insulation, drywall, tile, no structural work to be done. | $9,000 |
| Feb 15, 2018 | Completed final sign-off Aug 2018 | 143 Jersey St | 3rd fl: renovate master bedroom, relocate master bath.Details
3rd fl: renovate master bedroom, relocate master bath. | $26,000 |
| Oct 19, 2016 | Completed final sign-off Dec 2017 | 160 Marview Wy | at ground floor, remove bathroom, add new bathroom, bedroom and family room. replace washer and dryer. replace one window facing side yard. at 2nd floor: renovate extg bathrom, remove one bedroom, add walk in closet, and replace 2 windows facing street.Details
at ground floor, remove bathroom, add new bathroom, bedroom and family room. replace washer and dryer. replace one window facing side yard. at 2nd floor: renovate extg bathrom, remove one bedroom, add walk in closet, and replace 2 windows facing street. | $80,000 |
| Sep 21, 2016 | Completed final sign-off Feb 2017 | 162 Flood Av | revision to 201608124928: interior renovation at 2nd floor - reconfigure floor plan. move location of bathroom add sink & toilet, kitchen, replace 2 windows in kind at light wellsDetails
revision to 201608124928: interior renovation at 2nd floor - reconfigure floor plan. move location of bathroom add sink & toilet, kitchen, replace 2 windows in kind at light wells | $68,000 |
| Dec 17, 2015 | Never finaled issued Dec 2015, no final | 90 Ravenwood Dr | interior renovation of 1st floor bedroom and bathrooms and lower level basement in-law suite. cosmetic and lighting upgrades throughoutDetails
interior renovation of 1st floor bedroom and bathrooms and lower level basement in-law suite. cosmetic and lighting upgrades throughout | $75,000 |
| Nov 5, 2015 | Completed final sign-off Apr 2016 | 363 29th St | kitchen & bathroom remodel, new bathroom addition at (e) closet on 2nd floor.Details
kitchen & bathroom remodel, new bathroom addition at (e) closet on 2nd floor. | $20,000 |
| Oct 6, 2015 | Expired or cancelled expired Jul 2018 | 3330 23rd St | build a division between (e) garage and new storage. addition of plumbing for future bathroom and laundry room. replacing garage door.Details
build a division between (e) garage and new storage. addition of plumbing for future bathroom and laundry room. replacing garage door. | $20,000 |
| Oct 1, 2015 | Completed final sign-off Nov 2015 | 1630 42nd Av | bath remodel: replace pedestal sink,water closet & remove bath tub in order to install shower stall. with custom shower pan,no structural work to be done.Details
bath remodel: replace pedestal sink,water closet & remove bath tub in order to install shower stall. with custom shower pan,no structural work to be done. | $9,000 |
| Jul 7, 2015 | Completed final sign-off Sep 2015 | 280 Valdez Av | revision to 201406178609. upper floor e 1/2 bath converted into full bath. lower floor new full bath. e bath layout change. closet in bedroom to be relocatedDetails
revision to 201406178609. upper floor e 1/2 bath converted into full bath. lower floor new full bath. e bath layout change. closet in bedroom to be relocated | $30,000 |
| Feb 24, 2015 | Completed final sign-off Oct 2016 | 2142 28th Av | remodel to ground flr to create new condtioned space. remodel to (e) second flr. 2 new bedrooms and bath with stairs at ground flr. new masterbath and (e) bath remodel at second flr. infill 2nd floor lightwell.Details
remodel to ground flr to create new condtioned space. remodel to (e) second flr. 2 new bedrooms and bath with stairs at ground flr. new masterbath and (e) bath remodel at second flr. infill 2nd floor lightwell. | $80,000 |
| Jan 15, 2015 | Completed final sign-off Mar 2015 | 4537 20th St | bathroom remodel at main floor, replace plumbing and electrical fixtures. install new tile and painting. no walls moved, removed or added. all layouts to remain unchanged.Details
bathroom remodel at main floor, replace plumbing and electrical fixtures. install new tile and painting. no walls moved, removed or added. all layouts to remain unchanged. | $14,000 |
| Jun 3, 2014 | Never finaled issued Jun 2014, no final | 143 Jersey St | revision to 9926237, renewal of bpa#201406037382. kitchen and bathroom remodel on 2nd floor and other work per plan. convert green house to office. 3rd fl wash/dryerDetails
revision to 9926237, renewal of bpa#201406037382. kitchen and bathroom remodel on 2nd floor and other work per plan. convert green house to office. 3rd fl wash/dryer | $55,000 |
| May 27, 2014 | Completed final sign-off Sep 2014 | 3326 Cabrillo St | infill window in hallway, remove non-bearing wall in kitchen, remove partition wall in breakfast room. remodel kitchen and one bath.Details
infill window in hallway, remove non-bearing wall in kitchen, remove partition wall in breakfast room. remodel kitchen and one bath. | $21,000 |
| May 14, 2014 | Completed final sign-off Jul 2014 | 3332 Cabrillo St | remodel bath remodel, infill window and remove 3' of wall at breakfast room, infill 2 doors at master bedroom. infill window at bedroom closet wall for interior staircase. single family use from residential careDetails
remodel bath remodel, infill window and remove 3' of wall at breakfast room, infill 2 doors at master bedroom. infill window at bedroom closet wall for interior staircase. single family use from residential care | $21,000 |
| May 5, 2014 | Completed final sign-off May 2014 | 727 35th Av | revision to 201401156397. change layout of 3rd fl master bath. infill window. 2nd fl : change layout at kitchen. relocate windowsDetails
revision to 201401156397. change layout of 3rd fl master bath. infill window. 2nd fl : change layout at kitchen. relocate windows | $1,000 |
| Feb 3, 2014 | Completed final sign-off Feb 2014 | 1101 Bosworth St | bath remodel including replacing countertop and sinks, faucets for 2 bathrooms onlyDetails
bath remodel including replacing countertop and sinks, faucets for 2 bathrooms only | $2,000 |
| Dec 9, 2013 | Completed final sign-off Feb 2014 | 723 35th Av | kitchen remodel, replace plumbing and electrical fixtures. remodel 2 bathrooms, replace plumbing and electrical fixtures. existing wall to remain, no structural work to be done. no wall modificationsDetails
kitchen remodel, replace plumbing and electrical fixtures. remodel 2 bathrooms, replace plumbing and electrical fixtures. existing wall to remain, no structural work to be done. no wall modifications | $30,000 |
| Oct 30, 2013 | Completed final sign-off Feb 2014 | 723 35th Av | bathroom remodel including installation of new plumbing and electrical fixtures of new location to downstairs bathroomDetails
bathroom remodel including installation of new plumbing and electrical fixtures of new location to downstairs bathroom | $12,000 |
| Aug 5, 2013 | Completed final sign-off Nov 2013 | 32 Ridgewood Av | relocate kitchen to rear bedroom. install new 1/2 bath at former kitchen area, new window at new kitchen area in existing opening, 6'0" sliding glass door at rearDetails
relocate kitchen to rear bedroom. install new 1/2 bath at former kitchen area, new window at new kitchen area in existing opening, 6'0" sliding glass door at rear | $25,000 |
| Jul 3, 2013 | Completed final sign-off Dec 2013 | 2261 Bush St | revision to 201304154492.reconfigure laundy/bath area, change 3 fixed windows at kitchen to 1 fixed window, change pane of doors at living room to sliding doorDetails
revision to 201304154492.reconfigure laundy/bath area, change 3 fixed windows at kitchen to 1 fixed window, change pane of doors at living room to sliding door | |
| May 14, 2013 | Completed final sign-off Jul 2013 | 1613 Baker St | bathroom remodel. relocate toilet, replace plumbing & electrical fixtures, replace tile for tub walls and floor. no structural work to be done, walls to remain.Details
bathroom remodel. relocate toilet, replace plumbing & electrical fixtures, replace tile for tub walls and floor. no structural work to be done, walls to remain. | $9,800 |
| Apr 15, 2013 | Completed final sign-off Dec 2013 | 2261 Bush St | unit #6-relocate kitchen & half bathroom & laundry, replace single door with french doors, add 2 windows at new kitchen. replace master bathroom tub with shower. replace vanity at bathroom #2, replace closet doors at bedrooms 1 & 2Details
unit #6-relocate kitchen & half bathroom & laundry, replace single door with french doors, add 2 windows at new kitchen. replace master bathroom tub with shower. replace vanity at bathroom #2, replace closet doors at bedrooms 1 & 2 | $53,000 |
| Jun 18, 2012 | Completed final sign-off Aug 2012 | 1 Quartz Wy | bathroom remodeling: including relocate plumbing and electrical fixtures, (e) walls to remain.Details
bathroom remodeling: including relocate plumbing and electrical fixtures, (e) walls to remain. | $9,000 |
| Oct 7, 2010 | Never finaled issued Oct 2010, no final | 1955 Beach St | remodel one bathroom, plumbing and electrical fixtures relocation. high efficacy lighting or occupancy sensor. kitchen work open walls to inspect electrical wires only. at least 50% high efficacy in kitchen, no chagne to exhaust system.Details
remodel one bathroom, plumbing and electrical fixtures relocation. high efficacy lighting or occupancy sensor. kitchen work open walls to inspect electrical wires only. at least 50% high efficacy in kitchen, no chagne to exhaust system. | $10,000 |
| Jul 14, 2010 | Completed final sign-off Oct 2010 | 1221 Noe St | kitchen & one bathroom remodeling, plumbing & electrical fixtures relocation for kitchen and bath only. no wall relocation or remove. kitchen: replace counter & cabinet. bathroom: replace plumbing fixtures, new lighting.Details
kitchen & one bathroom remodeling, plumbing & electrical fixtures relocation for kitchen and bath only. no wall relocation or remove. kitchen: replace counter & cabinet. bathroom: replace plumbing fixtures, new lighting. | $38,000 |
| Apr 9, 2010 | Completed final sign-off Apr 2011 | 1302 Cortland Av | add bedroom, family room & full bathroom at garage floor, add interior stairs from 2nd floor to ground floor. relocate bathroom, new bathroom, remove (e) kitchen, repair exterior stairs to back yardDetails
add bedroom, family room & full bathroom at garage floor, add interior stairs from 2nd floor to ground floor. relocate bathroom, new bathroom, remove (e) kitchen, repair exterior stairs to back yard | $35,000 |
| Mar 23, 2010 | Completed final sign-off May 2010 | 2010 Lyon St | remodel 3 bathroom on 1st floor:relocate toilet(30"x24" clear in front), sink replacement and electrical upgrade. 3rd floor replacement of medicine cabinets, toilets, 2 sinks on master bathroom. 4th floor: replace shower valve, sink toilet and electrical upgrade.Details
remodel 3 bathroom on 1st floor:relocate toilet(30"x24" clear in front), sink replacement and electrical upgrade. 3rd floor replacement of medicine cabinets, toilets, 2 sinks on master bathroom. 4th floor: replace shower valve, sink toilet and electrical upgrade. | $20,000 |
| Nov 6, 2009 | Completed final sign-off Jul 2010 | 34 Fairfield Wy | bathroom remodel: relocate plumbing and electrical fixturesDetails
bathroom remodel: relocate plumbing and electrical fixtures | $7,000 |
| Sep 25, 2009 | Completed final sign-off Dec 2009 | 2289 15th St | replace bathroom fixtures, relocate water closet, enlarge shower and replace window not visible from street in the bathroom on second floor.Details
replace bathroom fixtures, relocate water closet, enlarge shower and replace window not visible from street in the bathroom on second floor. | $20,000 |
| Aug 26, 2009 | Completed final sign-off Jan 2010 | 3756 23rd St | new windows at sunroom @ rear. new skylight at master bedroom, new parapet at skylight. enlarge 3rd. level bath into lightwell.Details
new windows at sunroom @ rear. new skylight at master bedroom, new parapet at skylight. enlarge 3rd. level bath into lightwell. | $150,000 |
| Aug 11, 2009 | Completed final sign-off Jan 2010 | 3756 23rd St | interior renovations. remodel kitchen. add powder room @ 2nd level and remove (e) bath @ 2nd level. create interior stairway from (e) garage to 2nd level. create new master bath @ 3rd level. remodel (e) bath.Details
interior renovations. remodel kitchen. add powder room @ 2nd level and remove (e) bath @ 2nd level. create interior stairway from (e) garage to 2nd level. create new master bath @ 3rd level. remodel (e) bath. | $49,500 |
| Jul 7, 2009 | Completed final sign-off Oct 2009 | 2540 16th Av | revision to appl #200703267215 -keep(e) kitchen & bedroom #1 @ 2nd floor, eliminate 1/2 bath @ 2nd floor, add full bath & 1 bedroom @ ground floor, relocate family room from 2nf floor to ground floor.Details
revision to appl #200703267215 -keep(e) kitchen & bedroom #1 @ 2nd floor, eliminate 1/2 bath @ 2nd floor, add full bath & 1 bedroom @ ground floor, relocate family room from 2nf floor to ground floor. | $8,000 |
| Mar 10, 2009 | Completed final sign-off Aug 2009 | 1435 12th Av | interior kitchen remodel, interior bathroom remodel, interior master bedroom remodel, master bathroom added on 2nd floor, replace (e) aluminum windows at front with new wood windowsDetails
interior kitchen remodel, interior bathroom remodel, interior master bedroom remodel, master bathroom added on 2nd floor, replace (e) aluminum windows at front with new wood windows | $68,000 |