Back to kitchen remodel contractors
Chau Construction
- Based in
- Castro Valley
- On San Francisco permits
- May 2000 to Jun 2015
- Last 24 months
- 0 permits filed
30 permits since 2000: 26 completed, 3 never finaled, 1 expired or cancelled.
Of the 3 never-finaled permits, 3 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
12 kitchen remodel permits: 10 completed, 1 never finaled, 1 expired or cancelled. Typically 0 days from filing to permit and 86 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Oct 7, 2014 | Completed final sign-off Dec 2014 | 238 Divisadero St | b- replacing kitchen cabinet & adding electrical outlet, replace bathroom vanity.Details
b- replacing kitchen cabinet & adding electrical outlet, replace bathroom vanity. | $3,500 |
| Jul 19, 2012 | Completed final sign-off Aug 2012 | 1250 Vallejo St | to comply with nov # 201245962. remodeling kitchen and bathroom. replace cabinets, sink top plumbing system, tub, faucet, vanity and electricalDetails
to comply with nov # 201245962. remodeling kitchen and bathroom. replace cabinets, sink top plumbing system, tub, faucet, vanity and electrical | $15,000 |
| Apr 20, 2010 | Expired or cancelled expired Nov 2011 | 2008 Leavenworth St | remodeling unit 2008. kitchen & bathroom, electrical work. provide high efficacy lighting per cec 8151 (k).Details
remodeling unit 2008. kitchen & bathroom, electrical work. provide high efficacy lighting per cec 8151 (k). | $18,000 |
| Oct 15, 2009 | Completed final sign-off Mar 2010 | 1733 Stockton St | remodeling kitchen, upgrade electrical and plumbing, replacing cabinets, faucet and sink, non structural workDetails
remodeling kitchen, upgrade electrical and plumbing, replacing cabinets, faucet and sink, non structural work | $8,000 |
| Feb 12, 2009 | Completed final sign-off Aug 2009 | 3110 Clay St | #1- remodeling 1 kitchen & 1 bathroom. replace cabinets, tub, sink vanity & fgi outlet. non structural work.Details
#1- remodeling 1 kitchen & 1 bathroom. replace cabinets, tub, sink vanity & fgi outlet. non structural work. | $20,000 |
| Jan 6, 2009 | Completed final sign-off Apr 2009 | 3110 Clay St | unit #2 - remodeling kitche & bathroom. replacing cabinets, tub sink, vanity. not wall removing. kitchen floor area = 10x10=150sf. in kind.Details
unit #2 - remodeling kitche & bathroom. replacing cabinets, tub sink, vanity. not wall removing. kitchen floor area = 10x10=150sf. in kind. | $25,250 |
| Sep 4, 2008 | Completed final sign-off Apr 2009 | 3110 Clay St | unit #4 - remodeling 1 kitchen & 1 bathroom. replacing cabinets, faucets, sink, tub & vanity.Details
unit #4 - remodeling 1 kitchen & 1 bathroom. replacing cabinets, faucets, sink, tub & vanity. | $21,000 |
| Aug 10, 2007 | Completed final sign-off Nov 2007 | 2727 Jackson St | work @ unit# 3 only. remodel bathroom & kitchen. tub, vanity, electrical. kitchen new cabinets, sink, outlets.Details
work @ unit# 3 only. remodel bathroom & kitchen. tub, vanity, electrical. kitchen new cabinets, sink, outlets. | $20,000 |
| Jul 16, 2007 | Completed final sign-off Nov 2007 | 2727 Jackson St | work @ unit# 1 only. remodel bathroom & kitchen. 50% lighting shall be florescent.Details
work @ unit# 1 only. remodel bathroom & kitchen. 50% lighting shall be florescent. | $15,000 |
| Sep 7, 2006 | Never finaled issued Sep 2006, no final | 2022 Leavenworth St | unit #2022 remodeling (1) bathroom & (1) kitchen, replacing drainage pipes , add one electrical subpanel. unit#2024: remodeling (1) bathroom only.Details
unit #2022 remodeling (1) bathroom & (1) kitchen, replacing drainage pipes , add one electrical subpanel. unit#2024: remodeling (1) bathroom only. | $20,000 |
| Apr 27, 2005 | Completed final sign-off Jul 2005 | 280 28th St | remodel the bathroom and two kitchens replace the tub tiles vanity faucets sink cabinets and hoodsDetails
remodel the bathroom and two kitchens replace the tub tiles vanity faucets sink cabinets and hoods | $14,000 |
| Feb 23, 2004 | Completed final sign-off May 2004 | 2094 32nd Av | remodel kitchen & electrical service. no structural work.Details
remodel kitchen & electrical service. no structural work. | $8,500 |