Back to kitchen remodel contractors
Cesar Caro
- Based in
- Santa Rosa
- On San Francisco permits
- Aug 2015 to Aug 2023
- Last 24 months
- 0 permits filed
10 permits since 2000: 3 completed, 7 never finaled.
Of the 7 never-finaled permits, 1 is 3 to 5 years old, 5 are 5 to 10 years old, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Kitchen remodel permits
2 kitchen remodel permits: 2 never finaled. Typically 34 days from filing to permit.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 22, 2023 | Never finaled issued Sep 2023, no final | 1001 Laguna St | apt a: remove replace kitchen cabinets. remove replace bathtub. remove main panel out of closet. remove and replace flooring. update electrical bathroom & kitchen. kitchen and bath remodel.Details
apt a: remove replace kitchen cabinets. remove replace bathtub. remove main panel out of closet. remove and replace flooring. update electrical bathroom & kitchen. kitchen and bath remodel. | $30,000 |
| May 28, 2019 | Never finaled issued Jul 2019, no final | 62 02nd St | revised pa 201805179441. revise ground floor accessible single-accommodation restroom. no change to plumbing fixtures or kitchen equipment.Details
revised pa 201805179441. revise ground floor accessible single-accommodation restroom. no change to plumbing fixtures or kitchen equipment. |