Centric Construction Inc
- Based in
- Brisbane
- On San Francisco permits
- Mar 2007 to Oct 2026
- Last 24 months
- 14 permits filed
313 permits since 2000: 237 completed, 6 in progress, 58 never finaled, 12 expired or cancelled.
Of the 58 never-finaled permits, 3 are 3 to 5 years old, 23 are 5 to 10 years old, 32 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Stairs permits
21 stairs permits: 19 completed, 2 never finaled. Typically 29 days from filing to permit and 265 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 17, 2022 | Completed final sign-off Dec 2023 | 333 Battery St | level 1: new paving, drains, finishes, exterior screen, entry door at porte-cochere; new lighting, mech, finishes, ff&e @new pre-arrival lobby; new handrail extensions (level 1 only) & floor finishes @ grand stair (levels 1-3).Details
level 1: new paving, drains, finishes, exterior screen, entry door at porte-cochere; new lighting, mech, finishes, ff&e @new pre-arrival lobby; new handrail extensions (level 1 only) & floor finishes @ grand stair (levels 1-3). | $600,000 |
| Nov 20, 2020 | Completed final sign-off Dec 2021 | 500 Sansome St | demo and removal of (e) walls and (1) run of stairs within stairwell 1. construction of (n) walls, stairs and landing to accomodate (n) layout within stairwell 1.Details
demo and removal of (e) walls and (1) run of stairs within stairwell 1. construction of (n) walls, stairs and landing to accomodate (n) layout within stairwell 1. | $150,000 |
| Jul 11, 2019 | Never finaled issued Aug 2019, no final | 1333 Columbus Av | fire repair exterior and interior: new accessible restroom on ground floor. new bathroom 3rd floor residence. new interior stairs throughout, new elevator, new storefront at ground floor. comply with nov #201876901. tenant improvement under separate permitDetails
fire repair exterior and interior: new accessible restroom on ground floor. new bathroom 3rd floor residence. new interior stairs throughout, new elevator, new storefront at ground floor. comply with nov #201876901. tenant improvement under separate permit | $320,000 |
| May 9, 2019 | Completed final sign-off Feb 2020 | 2741 16th St | revision to pa 2018-1018-3533, split production 110 into two equal size rooms. add new secure door at stair @ ground floor with panic hardware for free egress at all timesDetails
revision to pa 2018-1018-3533, split production 110 into two equal size rooms. add new secure door at stair @ ground floor with panic hardware for free egress at all times | |
| Sep 1, 2016 | Completed final sign-off Oct 2017 | 425 North Point St | ground floor lobby arch/mep: interior non structural renovation of lobby, meeting rooms and public spaces. merge one office space and one meeting room to larger meeting room. new ramp and stair to courtyard, reno of courtyard finishes, and replacement of storefronts at lobby & courtyard. n/a maherDetails
ground floor lobby arch/mep: interior non structural renovation of lobby, meeting rooms and public spaces. merge one office space and one meeting room to larger meeting room. new ramp and stair to courtyard, reno of courtyard finishes, and replacement of storefronts at lobby & courtyard. n/a maher | $810,700 |
| Aug 10, 2015 | Completed final sign-off Nov 2015 | 2575 Marin St | demo (e) non-compliant exterior concrete stairs, ramps & guardrails, construct (n) exterior concrete stairs & pedestrian ramp, (n) guardrails & 2 (n) bathrooms. n/a ordinance #155-13Details
demo (e) non-compliant exterior concrete stairs, ramps & guardrails, construct (n) exterior concrete stairs & pedestrian ramp, (n) guardrails & 2 (n) bathrooms. n/a ordinance #155-13 | $400,000 |
| Jul 24, 2015 | Completed final sign-off Feb 2016 | 334 Grant Av | demolition of (e) floor, stair, walls, equipment + finishes. construction of (n) floor to replace (e), walls, stairs, + finishes. mep under separate permit. compliance with maher ordinance no 155-13 not required.Details
demolition of (e) floor, stair, walls, equipment + finishes. construction of (n) floor to replace (e), walls, stairs, + finishes. mep under separate permit. compliance with maher ordinance no 155-13 not required. | $188,905 |
| Jul 15, 2015 | Completed final sign-off Aug 2016 | 1023 Mission St | demo: non load bearing walls, concrete slab, mezzanine & exterior wall cuts. construction: (n) stairs, (n) mezzanine, 2 (n) means of egress. maher n/aDetails
demo: non load bearing walls, concrete slab, mezzanine & exterior wall cuts. construction: (n) stairs, (n) mezzanine, 2 (n) means of egress. maher n/a | $370,000 |
| May 29, 2015 | Completed final sign-off Jul 2016 | 545 Post St | selective demolition of wall, doors, stairs, kitchen equipment, cabinetry & plumbing fixtures/accessories in the basement, lobby & 1.5 level. ref pa 201504163818 & 201504062895.Details
selective demolition of wall, doors, stairs, kitchen equipment, cabinetry & plumbing fixtures/accessories in the basement, lobby & 1.5 level. ref pa 201504163818 & 201504062895. | |
| Mar 28, 2014 | Completed final sign-off Sep 2014 | 500 Sansome St | (rooftop): construction of new stairs and new raised walkways at e equipment platformsDetails
(rooftop): construction of new stairs and new raised walkways at e equipment platforms | $55,000 |
| Feb 12, 2014 | Never finaled issued Feb 2014, no final | 1 Jefferson St | demolition of non structural partitions, light fixtures, and air distribution systems, elevator, and staircase #4. add non-structural partitions. work to be performed on level 1 & 2 of a 4 story building. n/a for the maher ordinance #155-13Details
demolition of non structural partitions, light fixtures, and air distribution systems, elevator, and staircase #4. add non-structural partitions. work to be performed on level 1 & 2 of a 4 story building. n/a for the maher ordinance #155-13 | $30,000 |
| Aug 12, 2013 | Completed final sign-off Apr 2014 | 500 Sansome St | 1st floor & mezz - interior tenant improvement including new partitions, ceilings, finishes, new stair & guardrail. mep deferred.Details
1st floor & mezz - interior tenant improvement including new partitions, ceilings, finishes, new stair & guardrail. mep deferred. | $1,122,600 |
| Apr 26, 2013 | Completed final sign-off Apr 2014 | 500 Sansome St | demolition of (e) non load bearing walls & stairs, construction of (n) wall, doors, stairs, construction of (n) concrete slab, structural support. add (n) elevator smoke door.Details
demolition of (e) non load bearing walls & stairs, construction of (n) wall, doors, stairs, construction of (n) concrete slab, structural support. add (n) elevator smoke door. | $35,000 |
| Mar 26, 2013 | Completed final sign-off Jun 2013 | 450 Powell St | revision to appl#2012.10.22.2547 - reduce in scope work on 2nd level (no work to ramp,stair railings, mens & womens room)or unisex restroom.Details
revision to appl#2012.10.22.2547 - reduce in scope work on 2nd level (no work to ramp,stair railings, mens & womens room)or unisex restroom. | |
| Oct 22, 2012 | Completed final sign-off Jun 2013 | 450 Powell St | 2nd & 3rd floors-3rd fl-reconfiguration of 3 rooms to refinish guest bathrooms. 2nd fl-replacing sinks in (e) restrooms & replacing a ramp handrail & stair handrailDetails
2nd & 3rd floors-3rd fl-reconfiguration of 3 rooms to refinish guest bathrooms. 2nd fl-replacing sinks in (e) restrooms & replacing a ramp handrail & stair handrail | $75,000 |
| Sep 7, 2012 | Completed final sign-off Jun 2013 | 631 Howard St | level 1 tenant improvement. removal of abandoned stair at basement. structural work for new stair. skylights at bldg annexDetails
level 1 tenant improvement. removal of abandoned stair at basement. structural work for new stair. skylights at bldg annex | $85,000 |
| Jul 20, 2012 | Completed final sign-off Jun 2013 | 799 Van Ness Av | demolition of existing slab and auto ramps for new elevator, stairs,pedestrial and auto ramps. building is vacant per ab-017. disabled access will not be performed until future permitDetails
demolition of existing slab and auto ramps for new elevator, stairs,pedestrial and auto ramps. building is vacant per ab-017. disabled access will not be performed until future permit | $180,310 |
| Jun 25, 2012 | Completed final sign-off Dec 2014 | 500 Sansome St | 1st fl & bsmt - construction of new transformer room, new exit passageway, stairs & accessible restrooms. removal of (e) non load bearing walls, exit passageway & non complying stairs & ramps.Details
1st fl & bsmt - construction of new transformer room, new exit passageway, stairs & accessible restrooms. removal of (e) non load bearing walls, exit passageway & non complying stairs & ramps. | $500,000 |
| Mar 7, 2012 | Completed final sign-off Apr 2013 | 631 Howard St | int. voluntary seismic & shell improvements on basement, 1st & 2nd flrs.work includes demo of (e)slabs (n) concrete reinforcing panels, strengthening floor diaphragms. (n) partitions (n) bathrooms.(n) concrete stairways. no exterior work. fire protection under separate permit.Details
int. voluntary seismic & shell improvements on basement, 1st & 2nd flrs.work includes demo of (e)slabs (n) concrete reinforcing panels, strengthening floor diaphragms. (n) partitions (n) bathrooms.(n) concrete stairways. no exterior work. fire protection under separate permit. | $420,000 |
| Jan 9, 2012 | Completed final sign-off Jun 2013 | 301 Twin Peaks Bl | revision to pa #200810295441: add guardrail closets, bedrm, data closet,bath,concrete planters,stairs,landing, storage space & associated doors,wall are removed. panty,toilet rm,elevator doors are reconfigured. balcony rails are glass & custom metal. stairs are reconfigured,balcony is cantileavered.Details
revision to pa #200810295441: add guardrail closets, bedrm, data closet,bath,concrete planters,stairs,landing, storage space & associated doors,wall are removed. panty,toilet rm,elevator doors are reconfigured. balcony rails are glass & custom metal. stairs are reconfigured,balcony is cantileavered. | $3,000 |
| May 17, 2007 | Completed final sign-off Jan 2008 | 340 Brannan St | foundatio for planters and stair wallsDetails
foundatio for planters and stair walls | $10,000 |