Back to kitchen remodel contractors
Cej Construction Llc
- Based in
- South San Francisco
- On San Francisco permits
- Jul 2014 to Sep 2026
- Last 24 months
- 21 permits filed
116 permits since 2000: 89 completed, 17 in progress, 6 never finaled, 4 expired or cancelled.
Of the 6 never-finaled permits, 3 are 3 to 5 years old, 3 are 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
35 kitchen remodel permits: 29 completed, 2 in progress, 2 never finaled, 2 expired or cancelled. Typically 22 days from filing to permit and 352 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 11, 2026 | In progress issued Sep 2026 | 2095 15th Av | replace kitchen cabinets & replace with new vinyl window.(fiberglass)Details
replace kitchen cabinets & replace with new vinyl window.(fiberglass) | $14,000 |
| Oct 17, 2025 | Completed final sign-off Dec 2025 | 859 26th Av | replace kitchen cabinet and countertop; add electrical oulets, replace garbage disposal, dish washer, floor.Details
replace kitchen cabinet and countertop; add electrical oulets, replace garbage disposal, dish washer, floor. | $15,000 |
| Oct 10, 2024 | Completed final sign-off Feb 2026 | 1467 29th Av | convert g/l garage storage to n) living space included a den, playroom, 2 bedrooms w/ closets, 2 full baths & laundry. n)g/l space is proposed within e) bldg envelope (860 sf). upper lvl kitchen remodel, add a full bath, install a new gas tankless water heater for whole house hot water supplyDetails
convert g/l garage storage to n) living space included a den, playroom, 2 bedrooms w/ closets, 2 full baths & laundry. n)g/l space is proposed within e) bldg envelope (860 sf). upper lvl kitchen remodel, add a full bath, install a new gas tankless water heater for whole house hot water supply | $150,000 |
| Dec 12, 2023 | Completed final sign-off Mar 2024 | 1236 19th Av | to comply with nov: 202311202: fire damage repair: replace sheetrock on walls and ceiling on kitchen and bath approx 25%. replace flooring and paint.Details
to comply with nov: 202311202: fire damage repair: replace sheetrock on walls and ceiling on kitchen and bath approx 25%. replace flooring and paint. | $35,000 |
| Dec 6, 2023 | Completed final sign-off Jun 2025 | 182 Liberty St | interior remodel, remodel kitchen, baths, switch lving area to top floor, add 1 full bath. no changes to front or visible areas from street,no envelope expansionDetails
interior remodel, remodel kitchen, baths, switch lving area to top floor, add 1 full bath. no changes to front or visible areas from street,no envelope expansion | $100,000 |
| Aug 7, 2023 | Completed final sign-off Aug 2025 | 619 Bosworth St | revision to 201912300893. revision to exterior staircase per inspector request. change 2/f kitchen layout.Details
revision to 201912300893. revision to exterior staircase per inspector request. change 2/f kitchen layout. | |
| Mar 14, 2023 | Completed final sign-off Nov 2023 | 634 Baker St | unit 3 on 4/f: remodel kitchen and bathroom. add 1 full bath.Details
unit 3 on 4/f: remodel kitchen and bathroom. add 1 full bath. | $35,000 |
| Oct 14, 2022 | Never finaled issued Oct 2022, no final | 634 Baker St | unit #3: replace counters in kitchen in-kind.Details
unit #3: replace counters in kitchen in-kind. | $500 |
| Sep 28, 2022 | Completed final sign-off Dec 2022 | 1535 35th Av | 2nd floor: remodel kitchen and bathroom.Details
2nd floor: remodel kitchen and bathroom. | $30,000 |
| Sep 22, 2022 | Completed final sign-off Sep 2023 | 1843 41st Av | revision to pa# 202203018982. 1st flr: bedrm reconfigure per layout. 2nd flr: kitchen & bathrm remodel per layout. 3rd flr: new skylight, new deck at rear.Details
revision to pa# 202203018982. 1st flr: bedrm reconfigure per layout. 2nd flr: kitchen & bathrm remodel per layout. 3rd flr: new skylight, new deck at rear. | $3,000 |
| Jul 6, 2022 | Expired or cancelled expired Jul 2025 | 115 03rd Av | 1st fl bathroom remodel. 2nd fl: total remodel (except foyer).remove rear stairs on 3rd fl. add new deck. replace rear siding gr fl kitchen sep permitDetails
1st fl bathroom remodel. 2nd fl: total remodel (except foyer).remove rear stairs on 3rd fl. add new deck. replace rear siding gr fl kitchen sep permit | $70,000 |
| Jul 6, 2022 | Expired or cancelled expired Jul 2025 | 115 03rd Av | remodel kitchen in kind (90 sqft)Details
remodel kitchen in kind (90 sqft) | $10,000 |
| Mar 1, 2022 | Completed final sign-off Sep 2023 | 1843 41st Av | 1/f: bathroom remodel, add media room, and 2 bedrooms. 2/f: replace front windows with alum clad-wood. kitchen and bath remodel.Details
1/f: bathroom remodel, add media room, and 2 bedrooms. 2/f: replace front windows with alum clad-wood. kitchen and bath remodel. | $50,000 |
| Sep 28, 2021 | Completed final sign-off Nov 2023 | 152 04th Av | 1st flr: add 2 bedrooms, 2 full bath, fam rm and laundry. infill at rear. 2nd flr: remodel kitchen and 1/2 bath. 3rd flr: add 3 bedrooms, 2 full baths and cantilever at rear. reconfigure interior stairs. fully sprinkler with nfpa 13d on separate permit. replace front windows in kind.Details
1st flr: add 2 bedrooms, 2 full bath, fam rm and laundry. infill at rear. 2nd flr: remodel kitchen and 1/2 bath. 3rd flr: add 3 bedrooms, 2 full baths and cantilever at rear. reconfigure interior stairs. fully sprinkler with nfpa 13d on separate permit. replace front windows in kind. | $120,000 |
| Jul 15, 2021 | Completed final sign-off Dec 2021 | 1754 34th Av | kitchen (110 sq ft) and bathroom (80 sq ft) remodelDetails
kitchen (110 sq ft) and bathroom (80 sq ft) remodel | $25,000 |
| Mar 26, 2021 | Completed final sign-off Mar 2023 | 1675 38th Av | 1st fl: add 2 bedrooms, 1 full bath & media room. 2nd fl: remodel kitchen & bathroom. add 1 full bath. add deck at rear. infill at rear.Details
1st fl: add 2 bedrooms, 1 full bath & media room. 2nd fl: remodel kitchen & bathroom. add 1 full bath. add deck at rear. infill at rear. | $85,000 |
| Feb 6, 2020 | Completed final sign-off Nov 2021 | 2388 Greenwich St | 1st fl add 1 bedroom, 1 full bath, family rm, 2nd fl remodel kitchen, bedrooms, bath. add 1 full bath, 3rd fl remodel kitchen, bedrooms, bath, add 1 bedroom, full bathDetails
1st fl add 1 bedroom, 1 full bath, family rm, 2nd fl remodel kitchen, bedrooms, bath. add 1 full bath, 3rd fl remodel kitchen, bedrooms, bath, add 1 bedroom, full bath | $5,000 |
| Nov 6, 2019 | Completed final sign-off Oct 2020 | 1493 Masonic Av | remodel kitchen & 2 bathrooms on 3/f & remodel powder room on 2/f.Details
remodel kitchen & 2 bathrooms on 3/f & remodel powder room on 2/f. | $35,000 |
| Oct 22, 2019 | Completed final sign-off Jun 2021 | 1097 Green St | unit 10: 4th fl: kitchen remodel, replace kitchen cabinets, sink,stove, install recessed lights. 2 bath remodel, remove replace e toilets, sinks, remove e tub and replace with new shower, add shower at existing powder roomDetails
unit 10: 4th fl: kitchen remodel, replace kitchen cabinets, sink,stove, install recessed lights. 2 bath remodel, remove replace e toilets, sinks, remove e tub and replace with new shower, add shower at existing powder room | $40,000 |
| Oct 21, 2019 | Completed final sign-off Nov 2019 | 200 Brannan St | #410 -remodel kitchen, 2 bahtrooms, no removal of walls.Details
#410 -remodel kitchen, 2 bahtrooms, no removal of walls. | $18,000 |
| Oct 7, 2019 | Completed final sign-off Oct 2020 | 2027 17th Av | interior remodel: convert (e) garage to 1 bedroom, 1 entertainment room & 1 bath, add 1 bike parking 1st fl. remove (e) door from (e) stair to (e) kitchen of 2nd fl. mech elec plumbing under separate permitsDetails
interior remodel: convert (e) garage to 1 bedroom, 1 entertainment room & 1 bath, add 1 bike parking 1st fl. remove (e) door from (e) stair to (e) kitchen of 2nd fl. mech elec plumbing under separate permits | $100,000 |
| Oct 4, 2019 | Completed final sign-off Sep 2020 | 1867 34th Av | remodel 10x10 kitchen and one bathroom 5x7. add 23 new lights.Details
remodel 10x10 kitchen and one bathroom 5x7. add 23 new lights. | $25,000 |
| Sep 30, 2019 | Completed final sign-off Sep 2020 | 521 Ellsworth St | 1sr flr - add master bedroom, 1 full bath and family rm, 2nd flr - remodel kitchen and bathDetails
1sr flr - add master bedroom, 1 full bath and family rm, 2nd flr - remodel kitchen and bath | $55,000 |
| Sep 19, 2019 | In progress issued Aug 2026 | 880 Pacheco St | basemen: add adu per ord# 95-17. add kitchen, living, 1 bedroom and 1 full bath. comply w/ complaint # 201831925.**maher n/a** note: fire sprinkler required as a 4-story structure per sfbc/infill & change of use at lowest level. mgwDetails
basemen: add adu per ord# 95-17. add kitchen, living, 1 bedroom and 1 full bath. comply w/ complaint # 201831925.**maher n/a** note: fire sprinkler required as a 4-story structure per sfbc/infill & change of use at lowest level. mgw | $76,000 |
| Aug 23, 2019 | Completed final sign-off Mar 2022 | 766 Moscow St | to comply w/ nov 201933241. 1st fl - add w bedrooms, 1 full bath, media & family; 2nd fl - remodel kitchen & bathroom. add 1 bedroom, home office & 2 full bathrooms; add new deck 2 rear. remove storage @ rearDetails
to comply w/ nov 201933241. 1st fl - add w bedrooms, 1 full bath, media & family; 2nd fl - remodel kitchen & bathroom. add 1 bedroom, home office & 2 full bathrooms; add new deck 2 rear. remove storage @ rear | $70,000 |
| Jul 18, 2019 | Completed final sign-off Oct 2020 | 123 Westwood Dr | 1st fl - add 2 bedrooms, 1 full bath and laundry; 2nd fl- remodel kitchen and bath; replace front window at attic in-kindDetails
1st fl - add 2 bedrooms, 1 full bath and laundry; 2nd fl- remodel kitchen and bath; replace front window at attic in-kind | $60,000 |
| Feb 20, 2019 | Completed final sign-off Sep 2020 | 1627 37th Av | 1st flr - add 2 bedrooms, 2 full bathrooms, media and laundry. 2nd flr - remodel kitchen and bath, ass 1 full bath. reconfigure interior stairs and infill south lightwellDetails
1st flr - add 2 bedrooms, 2 full bathrooms, media and laundry. 2nd flr - remodel kitchen and bath, ass 1 full bath. reconfigure interior stairs and infill south lightwell | $80,000 |
| Feb 11, 2019 | Completed final sign-off May 2019 | 518 46th Av | unit 518 & 520: remodel (2) kitchens (115 sq. ft. each) & (2) bathrooms (40 sq. ft. each), no change in fixture locationDetails
unit 518 & 520: remodel (2) kitchens (115 sq. ft. each) & (2) bathrooms (40 sq. ft. each), no change in fixture location | $45,000 |
| Feb 1, 2019 | Completed final sign-off Jun 2020 | 2074 45th Av | interior renovation to include removal of walls between kitchen and living room. enlarge royer, new bathroom and laundry @ ground floor.Details
interior renovation to include removal of walls between kitchen and living room. enlarge royer, new bathroom and laundry @ ground floor. | $90,000 |
| Jan 29, 2019 | Completed final sign-off Sep 2019 | 1938 18th Av | kitchen remodel. remove and replace existing kitchen cabinets, sink, stove, add island and install recessed lights. n/a for maherDetails
kitchen remodel. remove and replace existing kitchen cabinets, sink, stove, add island and install recessed lights. n/a for maher | $35,000 |
| Oct 31, 2018 | Completed final sign-off Aug 2023 | 440 28th St | 1. excavate basement crawl space to add living space(194 sf) including a full bath. 2. expand main flr to rear(207 sf), remodel kitchen, bath & stair. 3. 2nd flr bedroom expansion @ rear(400 sf), add a bathroom.Details
1. excavate basement crawl space to add living space(194 sf) including a full bath. 2. expand main flr to rear(207 sf), remodel kitchen, bath & stair. 3. 2nd flr bedroom expansion @ rear(400 sf), add a bathroom. | $200,000 |
| Apr 2, 2018 | Completed final sign-off Jun 2018 | 156 Hermann St | unit a: replace kitchen cabinetDetails
unit a: replace kitchen cabinet | $5,000 |
| Jan 10, 2018 | Completed final sign-off May 2019 | 151 Laidley St | 1st fl: remodel kitchen and bath. add interior stairs. basement: add 2 bedrooms, 1 full bath and deck.Details
1st fl: remodel kitchen and bath. add interior stairs. basement: add 2 bedrooms, 1 full bath and deck. | $75,000 |
| Oct 31, 2017 | Completed final sign-off Aug 2018 | 393 30th Av | 2nd floor: remodel kitchen and bath. 3rd floor: remodel bath and add 1 bathDetails
2nd floor: remodel kitchen and bath. 3rd floor: remodel bath and add 1 bath | $30,000 |
| Jul 1, 2014 | Never finaled issued Feb 2017, no final | 1419 Funston Av | remodel 2nd level & add 2nd unit on 3rd floor including kitchen and bathroom. also rear horizontal addition.Details
remodel 2nd level & add 2nd unit on 3rd floor including kitchen and bathroom. also rear horizontal addition. | $200,000 |