Back to bathroom remodel contractors
Cej Construction Llc
- Based in
- South San Francisco
- On San Francisco permits
- Jul 2014 to Sep 2026
- Last 24 months
- 21 permits filed
116 permits since 2000: 89 completed, 17 in progress, 6 never finaled, 4 expired or cancelled.
Of the 6 never-finaled permits, 3 are 3 to 5 years old, 3 are 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
47 bathroom remodel permits: 41 completed, 3 in progress, 1 never finaled, 2 expired or cancelled. Typically 22 days from filing to permit and 356 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| May 1, 2026 | Completed final sign-off Jul 2026 | 1479 40th Av | repair bathroom in kindDetails
repair bathroom in kind | $5,000 |
| Jul 17, 2025 | Completed final sign-off Feb 2026 | 450 Frederick St | unit b: remodel 2 bathrooms on 2nd & 3d floor; including 2 shower pans. install new fan, tiles, faucets, sinks, toilet. one dedicated curcuit for each bathroom. all in-kind.Details
unit b: remodel 2 bathrooms on 2nd & 3d floor; including 2 shower pans. install new fan, tiles, faucets, sinks, toilet. one dedicated curcuit for each bathroom. all in-kind. | $5,000 |
| May 21, 2025 | In progress issued May 2025 | 138 Parker Av | revision to pa# 202412237292 at 3rd fl. change sliding dr to folfing dr & reduce opening width. new interior wall to enclose walk in closet. re-arrange fixtures in bathroom. remove 1 skylight from scope & relocate 1 skylightDetails
revision to pa# 202412237292 at 3rd fl. change sliding dr to folfing dr & reduce opening width. new interior wall to enclose walk in closet. re-arrange fixtures in bathroom. remove 1 skylight from scope & relocate 1 skylight | |
| Dec 23, 2024 | In progress issued Feb 2025 | 138 Parker Av | 3/f: remodel 2 bathrooms, combine 2 bedrooms into single bedroom, turn unoccupied roof into roof dek, add roof overhang, new sliding door and windwo, at roof, add 4 (n) skylights, new roof parapet along north property lineDetails
3/f: remodel 2 bathrooms, combine 2 bedrooms into single bedroom, turn unoccupied roof into roof dek, add roof overhang, new sliding door and windwo, at roof, add 4 (n) skylights, new roof parapet along north property line | $70,000 |
| Oct 10, 2024 | Completed final sign-off Feb 2026 | 1467 29th Av | convert g/l garage storage to n) living space included a den, playroom, 2 bedrooms w/ closets, 2 full baths & laundry. n)g/l space is proposed within e) bldg envelope (860 sf). upper lvl kitchen remodel, add a full bath, install a new gas tankless water heater for whole house hot water supplyDetails
convert g/l garage storage to n) living space included a den, playroom, 2 bedrooms w/ closets, 2 full baths & laundry. n)g/l space is proposed within e) bldg envelope (860 sf). upper lvl kitchen remodel, add a full bath, install a new gas tankless water heater for whole house hot water supply | $150,000 |
| Dec 12, 2023 | Completed final sign-off Mar 2024 | 1236 19th Av | to comply with nov: 202311202: fire damage repair: replace sheetrock on walls and ceiling on kitchen and bath approx 25%. replace flooring and paint.Details
to comply with nov: 202311202: fire damage repair: replace sheetrock on walls and ceiling on kitchen and bath approx 25%. replace flooring and paint. | $35,000 |
| Dec 6, 2023 | Completed final sign-off Jun 2025 | 182 Liberty St | interior remodel, remodel kitchen, baths, switch lving area to top floor, add 1 full bath. no changes to front or visible areas from street,no envelope expansionDetails
interior remodel, remodel kitchen, baths, switch lving area to top floor, add 1 full bath. no changes to front or visible areas from street,no envelope expansion | $100,000 |
| Aug 22, 2023 | Completed final sign-off Aug 2023 | 440 28th St | revision to approved pa# 201810314602, 202105170462, 202203150057. change master bath and walking closet location at 3rd floor.Details
revision to approved pa# 201810314602, 202105170462, 202203150057. change master bath and walking closet location at 3rd floor. | |
| Mar 14, 2023 | Completed final sign-off Nov 2023 | 634 Baker St | unit 3 on 4/f: remodel kitchen and bathroom. add 1 full bath.Details
unit 3 on 4/f: remodel kitchen and bathroom. add 1 full bath. | $35,000 |
| Jan 31, 2023 | Expired or cancelled expired Jul 2025 | 115 03rd Av | add 6 new skylights and remodel 2 bathrooms and bedrooms at top floor at top unit. replace drywall in kind, new insulation and all new electrical. all new skylights to have u factor:0.30 maxDetails
add 6 new skylights and remodel 2 bathrooms and bedrooms at top floor at top unit. replace drywall in kind, new insulation and all new electrical. all new skylights to have u factor:0.30 max | $2,000 |
| Sep 28, 2022 | Completed final sign-off Dec 2022 | 1535 35th Av | 2nd floor: remodel kitchen and bathroom.Details
2nd floor: remodel kitchen and bathroom. | $30,000 |
| Jul 6, 2022 | Expired or cancelled expired Jul 2025 | 115 03rd Av | 1st fl bathroom remodel. 2nd fl: total remodel (except foyer).remove rear stairs on 3rd fl. add new deck. replace rear siding gr fl kitchen sep permitDetails
1st fl bathroom remodel. 2nd fl: total remodel (except foyer).remove rear stairs on 3rd fl. add new deck. replace rear siding gr fl kitchen sep permit | $70,000 |
| Mar 1, 2022 | Completed final sign-off Sep 2023 | 1843 41st Av | 1/f: bathroom remodel, add media room, and 2 bedrooms. 2/f: replace front windows with alum clad-wood. kitchen and bath remodel.Details
1/f: bathroom remodel, add media room, and 2 bedrooms. 2/f: replace front windows with alum clad-wood. kitchen and bath remodel. | $50,000 |
| Feb 22, 2022 | Completed final sign-off May 2023 | 2434 Pacheco St | 1/f: add 1 den (not for sleeping), famly room and 1 full bathroom. 2/f: remodel ktichen. add new deck.Details
1/f: add 1 den (not for sleeping), famly room and 1 full bathroom. 2/f: remodel ktichen. add new deck. | $65,000 |
| Sep 28, 2021 | Completed final sign-off Nov 2023 | 152 04th Av | 1st flr: add 2 bedrooms, 2 full bath, fam rm and laundry. infill at rear. 2nd flr: remodel kitchen and 1/2 bath. 3rd flr: add 3 bedrooms, 2 full baths and cantilever at rear. reconfigure interior stairs. fully sprinkler with nfpa 13d on separate permit. replace front windows in kind.Details
1st flr: add 2 bedrooms, 2 full bath, fam rm and laundry. infill at rear. 2nd flr: remodel kitchen and 1/2 bath. 3rd flr: add 3 bedrooms, 2 full baths and cantilever at rear. reconfigure interior stairs. fully sprinkler with nfpa 13d on separate permit. replace front windows in kind. | $120,000 |
| Aug 27, 2021 | Completed final sign-off Aug 2022 | 87 Springfield Dr | 2/f: remodel existing bathroom, add 1 full bath.Details
2/f: remodel existing bathroom, add 1 full bath. | $25,000 |
| Jul 15, 2021 | Completed final sign-off Dec 2021 | 1754 34th Av | kitchen (110 sq ft) and bathroom (80 sq ft) remodelDetails
kitchen (110 sq ft) and bathroom (80 sq ft) remodel | $25,000 |
| Mar 26, 2021 | Completed final sign-off Mar 2023 | 1675 38th Av | 1st fl: add 2 bedrooms, 1 full bath & media room. 2nd fl: remodel kitchen & bathroom. add 1 full bath. add deck at rear. infill at rear.Details
1st fl: add 2 bedrooms, 1 full bath & media room. 2nd fl: remodel kitchen & bathroom. add 1 full bath. add deck at rear. infill at rear. | $85,000 |
| Mar 25, 2021 | Completed final sign-off Dec 2023 | 630 11th Av | 1st fl: add 1 bedroom, 1 full bath, family & mudroom. 2nd fl: remodel bedrooms & bathroom. add 1 full bath. relocate interior stairs. add deck at rear. replace all front windows in-kind.Details
1st fl: add 1 bedroom, 1 full bath, family & mudroom. 2nd fl: remodel bedrooms & bathroom. add 1 full bath. relocate interior stairs. add deck at rear. replace all front windows in-kind. | $85,000 |
| Feb 6, 2020 | Completed final sign-off Nov 2021 | 2388 Greenwich St | 1st fl add 1 bedroom, 1 full bath, family rm, 2nd fl remodel kitchen, bedrooms, bath. add 1 full bath, 3rd fl remodel kitchen, bedrooms, bath, add 1 bedroom, full bathDetails
1st fl add 1 bedroom, 1 full bath, family rm, 2nd fl remodel kitchen, bedrooms, bath. add 1 full bath, 3rd fl remodel kitchen, bedrooms, bath, add 1 bedroom, full bath | $5,000 |
| Feb 3, 2020 | Completed final sign-off Oct 2020 | 1493 Masonic Av | legalize rooms on 1st floor: 1 bedroom, 1 playroom, and 1 full bathDetails
legalize rooms on 1st floor: 1 bedroom, 1 playroom, and 1 full bath | $30,000 |
| Dec 30, 2019 | Completed final sign-off Aug 2025 | 619 Bosworth St | add 2 bedrooms to 1st fl. add 1 bath to 1st fl, rebuild staircase from ground to 2nd fl. add laundry rm with sink to 1st fl. relocate water heater. relocated gas meter. remove central furnace and ducts. rebuild back staircase. relocate door on 2nd fl denDetails
add 2 bedrooms to 1st fl. add 1 bath to 1st fl, rebuild staircase from ground to 2nd fl. add laundry rm with sink to 1st fl. relocate water heater. relocated gas meter. remove central furnace and ducts. rebuild back staircase. relocate door on 2nd fl den | $40,000 |
| Nov 6, 2019 | Completed final sign-off Oct 2020 | 1493 Masonic Av | remodel kitchen & 2 bathrooms on 3/f & remodel powder room on 2/f.Details
remodel kitchen & 2 bathrooms on 3/f & remodel powder room on 2/f. | $35,000 |
| Oct 22, 2019 | Completed final sign-off Jun 2021 | 1097 Green St | unit 10: 4th fl: kitchen remodel, replace kitchen cabinets, sink,stove, install recessed lights. 2 bath remodel, remove replace e toilets, sinks, remove e tub and replace with new shower, add shower at existing powder roomDetails
unit 10: 4th fl: kitchen remodel, replace kitchen cabinets, sink,stove, install recessed lights. 2 bath remodel, remove replace e toilets, sinks, remove e tub and replace with new shower, add shower at existing powder room | $40,000 |
| Oct 7, 2019 | Completed final sign-off Oct 2020 | 2027 17th Av | interior remodel: convert (e) garage to 1 bedroom, 1 entertainment room & 1 bath, add 1 bike parking 1st fl. remove (e) door from (e) stair to (e) kitchen of 2nd fl. mech elec plumbing under separate permitsDetails
interior remodel: convert (e) garage to 1 bedroom, 1 entertainment room & 1 bath, add 1 bike parking 1st fl. remove (e) door from (e) stair to (e) kitchen of 2nd fl. mech elec plumbing under separate permits | $100,000 |
| Oct 4, 2019 | Completed final sign-off Sep 2020 | 1867 34th Av | remodel 10x10 kitchen and one bathroom 5x7. add 23 new lights.Details
remodel 10x10 kitchen and one bathroom 5x7. add 23 new lights. | $25,000 |
| Sep 30, 2019 | Completed final sign-off Sep 2020 | 521 Ellsworth St | 1sr flr - add master bedroom, 1 full bath and family rm, 2nd flr - remodel kitchen and bathDetails
1sr flr - add master bedroom, 1 full bath and family rm, 2nd flr - remodel kitchen and bath | $55,000 |
| Sep 19, 2019 | In progress issued Aug 2026 | 880 Pacheco St | basemen: add adu per ord# 95-17. add kitchen, living, 1 bedroom and 1 full bath. comply w/ complaint # 201831925.**maher n/a** note: fire sprinkler required as a 4-story structure per sfbc/infill & change of use at lowest level. mgwDetails
basemen: add adu per ord# 95-17. add kitchen, living, 1 bedroom and 1 full bath. comply w/ complaint # 201831925.**maher n/a** note: fire sprinkler required as a 4-story structure per sfbc/infill & change of use at lowest level. mgw | $76,000 |
| Aug 23, 2019 | Completed final sign-off Mar 2022 | 766 Moscow St | to comply w/ nov 201933241. 1st fl - add w bedrooms, 1 full bath, media & family; 2nd fl - remodel kitchen & bathroom. add 1 bedroom, home office & 2 full bathrooms; add new deck 2 rear. remove storage @ rearDetails
to comply w/ nov 201933241. 1st fl - add w bedrooms, 1 full bath, media & family; 2nd fl - remodel kitchen & bathroom. add 1 bedroom, home office & 2 full bathrooms; add new deck 2 rear. remove storage @ rear | $70,000 |
| Jul 18, 2019 | Completed final sign-off Oct 2020 | 123 Westwood Dr | 1st fl - add 2 bedrooms, 1 full bath and laundry; 2nd fl- remodel kitchen and bath; replace front window at attic in-kindDetails
1st fl - add 2 bedrooms, 1 full bath and laundry; 2nd fl- remodel kitchen and bath; replace front window at attic in-kind | $60,000 |
| Jul 18, 2019 | Completed final sign-off Apr 2022 | 2046 44th Av | additional of dwelling unit at 1st flr per ordinance no. 95-17. remodel both floors, rear 2-story horizontal addition for new bedroom & bathroom, 1-level wood deck.Details
additional of dwelling unit at 1st flr per ordinance no. 95-17. remodel both floors, rear 2-story horizontal addition for new bedroom & bathroom, 1-level wood deck. | $90,000 |
| May 21, 2019 | Completed final sign-off Jan 2021 | 4319 25th St | remodel single fam dwelling:infill below (e) habitable space at rear rooms down at 1st flr. bedrooms & bathrooms:(n) windows & doors at rear. replace (e) windows in-kind all windows visible from street.Details
remodel single fam dwelling:infill below (e) habitable space at rear rooms down at 1st flr. bedrooms & bathrooms:(n) windows & doors at rear. replace (e) windows in-kind all windows visible from street. | $140,000 |
| Apr 18, 2019 | Completed final sign-off Jan 2021 | 4319 25th St | renovation of (e) single family dwelling adding dormers to extg attic space for addition of (n) bathroom & bedroom, family room at attic. new stair to attic level (3rd floor level). new windows at dormers and back elevation. ref app#201905211258Details
renovation of (e) single family dwelling adding dormers to extg attic space for addition of (n) bathroom & bedroom, family room at attic. new stair to attic level (3rd floor level). new windows at dormers and back elevation. ref app#201905211258 | $60,000 |
| Feb 20, 2019 | Completed final sign-off Sep 2020 | 1627 37th Av | 1st flr - add 2 bedrooms, 2 full bathrooms, media and laundry. 2nd flr - remodel kitchen and bath, ass 1 full bath. reconfigure interior stairs and infill south lightwellDetails
1st flr - add 2 bedrooms, 2 full bathrooms, media and laundry. 2nd flr - remodel kitchen and bath, ass 1 full bath. reconfigure interior stairs and infill south lightwell | $80,000 |
| Feb 11, 2019 | Completed final sign-off May 2019 | 518 46th Av | unit 518 & 520: remodel (2) kitchens (115 sq. ft. each) & (2) bathrooms (40 sq. ft. each), no change in fixture locationDetails
unit 518 & 520: remodel (2) kitchens (115 sq. ft. each) & (2) bathrooms (40 sq. ft. each), no change in fixture location | $45,000 |
| Feb 1, 2019 | Completed final sign-off Jun 2020 | 2074 45th Av | interior renovation to include removal of walls between kitchen and living room. enlarge royer, new bathroom and laundry @ ground floor.Details
interior renovation to include removal of walls between kitchen and living room. enlarge royer, new bathroom and laundry @ ground floor. | $90,000 |
| Dec 31, 2018 | Completed final sign-off Apr 2019 | 619 Bosworth St | remodel 2nd floor bathroom with shower pan.Details
remodel 2nd floor bathroom with shower pan. | $6,000 |
| Dec 18, 2018 | Completed final sign-off Apr 2019 | 727 Delano Av | revision to bap# 2017-1020-1835. adding a new laundry area, revise bathroom layout on ground floor. remove window in bathroom. new independent heating unit for accessary unit "727 delano ave"Details
revision to bap# 2017-1020-1835. adding a new laundry area, revise bathroom layout on ground floor. remove window in bathroom. new independent heating unit for accessary unit "727 delano ave" | $3,000 |
| Nov 20, 2018 | Completed final sign-off May 2019 | 518 46th Av | 1st flr - convert (e) half bath to full. 2nd flr - add laundry and interior stairs to connect floors. 3rd flr - add laundry and stairs to roof. add roof deck. infill south lightwell at 1st and 2nd flr against blind wallDetails
1st flr - convert (e) half bath to full. 2nd flr - add laundry and interior stairs to connect floors. 3rd flr - add laundry and stairs to roof. add roof deck. infill south lightwell at 1st and 2nd flr against blind wall | $30,000 |
| Nov 19, 2018 | Completed final sign-off Feb 2019 | 729 Rolph St | on 2nd fl - to comply with his nov 201835213 dated 4/2/2018, convert closet to a powder room, exhaust fan in 1/2 bath.Details
on 2nd fl - to comply with his nov 201835213 dated 4/2/2018, convert closet to a powder room, exhaust fan in 1/2 bath. | $8,000 |
| Oct 31, 2018 | Completed final sign-off Aug 2023 | 440 28th St | 1. excavate basement crawl space to add living space(194 sf) including a full bath. 2. expand main flr to rear(207 sf), remodel kitchen, bath & stair. 3. 2nd flr bedroom expansion @ rear(400 sf), add a bathroom.Details
1. excavate basement crawl space to add living space(194 sf) including a full bath. 2. expand main flr to rear(207 sf), remodel kitchen, bath & stair. 3. 2nd flr bedroom expansion @ rear(400 sf), add a bathroom. | $200,000 |
| Oct 9, 2018 | Completed final sign-off Mar 2020 | 1955 San Jose Av | 1st fl. add (2) bedrooms, (1) bath, and media room, 2nd fl: total remodel. add (1) full bath; replace water heat and furnaceDetails
1st fl. add (2) bedrooms, (1) bath, and media room, 2nd fl: total remodel. add (1) full bath; replace water heat and furnace | $55,000 |
| May 8, 2018 | Completed final sign-off May 2019 | 2048 14th Av | 1st floor: add half bath, study room and laundry. 2nd floor: remodel bathroom. 3rd floor: remodel bathroom.Details
1st floor: add half bath, study room and laundry. 2nd floor: remodel bathroom. 3rd floor: remodel bathroom. | $50,000 |
| Jan 10, 2018 | Completed final sign-off May 2019 | 151 Laidley St | 1st fl: remodel kitchen and bath. add interior stairs. basement: add 2 bedrooms, 1 full bath and deck.Details
1st fl: remodel kitchen and bath. add interior stairs. basement: add 2 bedrooms, 1 full bath and deck. | $75,000 |
| Dec 5, 2017 | Completed final sign-off Apr 2019 | 108 Palm Av | 1st floor: add 1 bedroom, 2 full baths, family room & den. 2nd floor: remodel ktichen & 2 baths.Details
1st floor: add 1 bedroom, 2 full baths, family room & den. 2nd floor: remodel ktichen & 2 baths. | $120,000 |
| Oct 31, 2017 | Completed final sign-off Aug 2018 | 393 30th Av | 2nd floor: remodel kitchen and bath. 3rd floor: remodel bath and add 1 bathDetails
2nd floor: remodel kitchen and bath. 3rd floor: remodel bath and add 1 bath | $30,000 |
| Jul 1, 2014 | Never finaled issued Feb 2017, no final | 1419 Funston Av | remodel 2nd level & add 2nd unit on 3rd floor including kitchen and bathroom. also rear horizontal addition.Details
remodel 2nd level & add 2nd unit on 3rd floor including kitchen and bathroom. also rear horizontal addition. | $200,000 |