Permit GraphShortlistSan Francisco building permits since 2000

Cej Construction Llc

Contractor license
1031309
State license record
Based in
South San Francisco
On San Francisco permits
Jul 2014 to Sep 2026
Last 24 months
21 permits filed

116 permits since 2000: 89 completed, 17 in progress, 6 never finaled, 4 expired or cancelled.

Of the 6 never-finaled permits, 3 are 3 to 5 years old, 3 are 5 to 10 years old.

CompletedIn progressNever finaledExpired or cancelled

This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records

Permits filed each year

How long permits take

Median days to final inspection, citywideMedian days to permit issued, citywideThis contractor’s finished permits

Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.

Bathroom remodel permits

AllRoof deck 6Deck 13Stairs 17Kitchen remodel 35Bathroom remodel 47

47 bathroom remodel permits: 41 completed, 3 in progress, 1 never finaled, 2 expired or cancelled. Typically 22 days from filing to permit and 356 days from permit to final inspection.

FiledOutcomeAddressWork described on the permitDeclared cost
May 1, 2026Completed
final sign-off Jul 2026
1479 40th Avrepair bathroom in kind
Details
Permit
202605010541
Status
complete
Filed
May 1, 2026
Permit issued
May 21, 2026
Final sign-off
Jul 30, 2026
Declared cost
$5,000
Address
1479 40th Av

repair bathroom in kind

Open the permit page

$5,000
Jul 17, 2025Completed
final sign-off Feb 2026
450 Frederick Stunit b: remodel 2 bathrooms on 2nd & 3d floor; including 2 shower pans. install new fan, tiles, faucets, sinks, toilet. one dedicated curcuit for each bathroom. all in-kind.
Details
Permit
202507171021
Status
complete
Filed
Jul 17, 2025
Permit issued
Jul 17, 2025
Final sign-off
Feb 12, 2026
Declared cost
$5,000
Address
450 Frederick St

unit b: remodel 2 bathrooms on 2nd & 3d floor; including 2 shower pans. install new fan, tiles, faucets, sinks, toilet. one dedicated curcuit for each bathroom. all in-kind.

Open the permit page

$5,000
May 21, 2025In progress
issued May 2025
138 Parker Avrevision to pa# 202412237292 at 3rd fl. change sliding dr to folfing dr & reduce opening width. new interior wall to enclose walk in closet. re-arrange fixtures in bathroom. remove 1 skylight from scope & relocate 1 skylight
Details
Permit
202505216958
Status
issued
Filed
May 21, 2025
Permit issued
May 28, 2025
Address
138 Parker Av

revision to pa# 202412237292 at 3rd fl. change sliding dr to folfing dr & reduce opening width. new interior wall to enclose walk in closet. re-arrange fixtures in bathroom. remove 1 skylight from scope & relocate 1 skylight

Open the permit page

Dec 23, 2024In progress
issued Feb 2025
138 Parker Av3/f: remodel 2 bathrooms, combine 2 bedrooms into single bedroom, turn unoccupied roof into roof dek, add roof overhang, new sliding door and windwo, at roof, add 4 (n) skylights, new roof parapet along north property line
Details
Permit
202412237292
Status
issued
Filed
Dec 23, 2024
Permit issued
Feb 25, 2025
Declared cost
$70,000
Address
138 Parker Av

3/f: remodel 2 bathrooms, combine 2 bedrooms into single bedroom, turn unoccupied roof into roof dek, add roof overhang, new sliding door and windwo, at roof, add 4 (n) skylights, new roof parapet along north property line

Open the permit page

$70,000
Oct 10, 2024Completed
final sign-off Feb 2026
1467 29th Avconvert g/l garage storage to n) living space included a den, playroom, 2 bedrooms w/ closets, 2 full baths & laundry. n)g/l space is proposed within e) bldg envelope (860 sf). upper lvl kitchen remodel, add a full bath, install a new gas tankless water heater for whole house hot water supply
Details
Permit
202410102727
Status
complete
Filed
Oct 10, 2024
Permit issued
Mar 28, 2025
Final sign-off
Feb 11, 2026
Declared cost
$150,000
Address
1467 29th Av

convert g/l garage storage to n) living space included a den, playroom, 2 bedrooms w/ closets, 2 full baths & laundry. n)g/l space is proposed within e) bldg envelope (860 sf). upper lvl kitchen remodel, add a full bath, install a new gas tankless water heater for whole house hot water supply

Open the permit page

$150,000
Dec 12, 2023Completed
final sign-off Mar 2024
1236 19th Avto comply with nov: 202311202: fire damage repair: replace sheetrock on walls and ceiling on kitchen and bath approx 25%. replace flooring and paint.
Details
Permit
202312122365
Status
complete
Filed
Dec 12, 2023
Permit issued
Dec 12, 2023
Final sign-off
Mar 19, 2024
Declared cost
$35,000
Address
1236 19th Av

to comply with nov: 202311202: fire damage repair: replace sheetrock on walls and ceiling on kitchen and bath approx 25%. replace flooring and paint.

Open the permit page

$35,000
Dec 6, 2023Completed
final sign-off Jun 2025
182 Liberty Stinterior remodel, remodel kitchen, baths, switch lving area to top floor, add 1 full bath. no changes to front or visible areas from street,no envelope expansion
Details
Permit
202312061994
Status
complete
Filed
Dec 6, 2023
Permit issued
Feb 13, 2024
Final sign-off
Jun 26, 2025
Declared cost
$100,000
Address
182 Liberty St

interior remodel, remodel kitchen, baths, switch lving area to top floor, add 1 full bath. no changes to front or visible areas from street,no envelope expansion

Open the permit page

$100,000
Aug 22, 2023Completed
final sign-off Aug 2023
440 28th Strevision to approved pa# 201810314602, 202105170462, 202203150057. change master bath and walking closet location at 3rd floor.
Details
Permit
202308224909
Status
complete
Filed
Aug 22, 2023
Permit issued
Aug 22, 2023
Final sign-off
Aug 25, 2023
Address
440 28th St

revision to approved pa# 201810314602, 202105170462, 202203150057. change master bath and walking closet location at 3rd floor.

Open the permit page

Mar 14, 2023Completed
final sign-off Nov 2023
634 Baker Stunit 3 on 4/f: remodel kitchen and bathroom. add 1 full bath.
Details
Permit
202303143672
Status
complete
Filed
Mar 14, 2023
Permit issued
Mar 23, 2023
Final sign-off
Nov 3, 2023
Declared cost
$35,000
Address
634 Baker St

unit 3 on 4/f: remodel kitchen and bathroom. add 1 full bath.

Open the permit page

$35,000
Jan 31, 2023Expired or cancelled
expired Jul 2025
115 03rd Avadd 6 new skylights and remodel 2 bathrooms and bedrooms at top floor at top unit. replace drywall in kind, new insulation and all new electrical. all new skylights to have u factor:0.30 max
Details
Permit
202301311121
Status
expired
Filed
Jan 31, 2023
Permit issued
Feb 2, 2023
Declared cost
$2,000
Address
115 03rd Av

add 6 new skylights and remodel 2 bathrooms and bedrooms at top floor at top unit. replace drywall in kind, new insulation and all new electrical. all new skylights to have u factor:0.30 max

Open the permit page

$2,000
Sep 28, 2022Completed
final sign-off Dec 2022
1535 35th Av2nd floor: remodel kitchen and bathroom.
Details
Permit
202209283360
Status
complete
Filed
Sep 28, 2022
Permit issued
Oct 3, 2022
Final sign-off
Dec 20, 2022
Declared cost
$30,000
Address
1535 35th Av

2nd floor: remodel kitchen and bathroom.

Open the permit page

$30,000
Jul 6, 2022Expired or cancelled
expired Jul 2025
115 03rd Av1st fl bathroom remodel. 2nd fl: total remodel (except foyer).remove rear stairs on 3rd fl. add new deck. replace rear siding gr fl kitchen sep permit
Details
Permit
202207067871
Status
expired
Filed
Jul 6, 2022
Permit issued
Sep 1, 2022
Declared cost
$70,000
Address
115 03rd Av

1st fl bathroom remodel. 2nd fl: total remodel (except foyer).remove rear stairs on 3rd fl. add new deck. replace rear siding gr fl kitchen sep permit

Open the permit page

$70,000
Mar 1, 2022Completed
final sign-off Sep 2023
1843 41st Av1/f: bathroom remodel, add media room, and 2 bedrooms. 2/f: replace front windows with alum clad-wood. kitchen and bath remodel.
Details
Permit
202203018982
Status
complete
Filed
Mar 1, 2022
Permit issued
Jun 1, 2022
Final sign-off
Sep 15, 2023
Declared cost
$50,000
Address
1843 41st Av

1/f: bathroom remodel, add media room, and 2 bedrooms. 2/f: replace front windows with alum clad-wood. kitchen and bath remodel.

Open the permit page

$50,000
Feb 22, 2022Completed
final sign-off May 2023
2434 Pacheco St1/f: add 1 den (not for sleeping), famly room and 1 full bathroom. 2/f: remodel ktichen. add new deck.
Details
Permit
202202228444
Status
complete
Filed
Feb 22, 2022
Permit issued
Mar 7, 2022
Final sign-off
May 12, 2023
Declared cost
$65,000
Address
2434 Pacheco St

1/f: add 1 den (not for sleeping), famly room and 1 full bathroom. 2/f: remodel ktichen. add new deck.

Open the permit page

$65,000
Sep 28, 2021Completed
final sign-off Nov 2023
152 04th Av1st flr: add 2 bedrooms, 2 full bath, fam rm and laundry. infill at rear. 2nd flr: remodel kitchen and 1/2 bath. 3rd flr: add 3 bedrooms, 2 full baths and cantilever at rear. reconfigure interior stairs. fully sprinkler with nfpa 13d on separate permit. replace front windows in kind.
Details
Permit
202109289335
Status
complete
Filed
Sep 28, 2021
Permit issued
Oct 29, 2021
Final sign-off
Nov 1, 2023
Declared cost
$120,000
Address
152 04th Av

1st flr: add 2 bedrooms, 2 full bath, fam rm and laundry. infill at rear. 2nd flr: remodel kitchen and 1/2 bath. 3rd flr: add 3 bedrooms, 2 full baths and cantilever at rear. reconfigure interior stairs. fully sprinkler with nfpa 13d on separate permit. replace front windows in kind.

Open the permit page

$120,000
Aug 27, 2021Completed
final sign-off Aug 2022
87 Springfield Dr2/f: remodel existing bathroom, add 1 full bath.
Details
Permit
202108277322
Status
complete
Filed
Aug 27, 2021
Permit issued
Sep 8, 2021
Final sign-off
Aug 26, 2022
Declared cost
$25,000
Address
87 Springfield Dr

2/f: remodel existing bathroom, add 1 full bath.

Open the permit page

$25,000
Jul 15, 2021Completed
final sign-off Dec 2021
1754 34th Avkitchen (110 sq ft) and bathroom (80 sq ft) remodel
Details
Permit
202107154457
Status
complete
Filed
Jul 15, 2021
Permit issued
Jul 15, 2021
Final sign-off
Dec 22, 2021
Declared cost
$25,000
Address
1754 34th Av

kitchen (110 sq ft) and bathroom (80 sq ft) remodel

Open the permit page

$25,000
Mar 26, 2021Completed
final sign-off Mar 2023
1675 38th Av1st fl: add 2 bedrooms, 1 full bath & media room. 2nd fl: remodel kitchen & bathroom. add 1 full bath. add deck at rear. infill at rear.
Details
Permit
202103267356
Status
complete
Filed
Mar 26, 2021
Permit issued
May 25, 2021
Final sign-off
Mar 2, 2023
Declared cost
$85,000
Address
1675 38th Av

1st fl: add 2 bedrooms, 1 full bath & media room. 2nd fl: remodel kitchen & bathroom. add 1 full bath. add deck at rear. infill at rear.

Open the permit page

$85,000
Mar 25, 2021Completed
final sign-off Dec 2023
630 11th Av1st fl: add 1 bedroom, 1 full bath, family & mudroom. 2nd fl: remodel bedrooms & bathroom. add 1 full bath. relocate interior stairs. add deck at rear. replace all front windows in-kind.
Details
Permit
202103257292
Status
complete
Filed
Mar 25, 2021
Permit issued
May 21, 2021
Final sign-off
Dec 19, 2023
Declared cost
$85,000
Address
630 11th Av

1st fl: add 1 bedroom, 1 full bath, family & mudroom. 2nd fl: remodel bedrooms & bathroom. add 1 full bath. relocate interior stairs. add deck at rear. replace all front windows in-kind.

Open the permit page

$85,000
Feb 6, 2020Completed
final sign-off Nov 2021
2388 Greenwich St1st fl add 1 bedroom, 1 full bath, family rm, 2nd fl remodel kitchen, bedrooms, bath. add 1 full bath, 3rd fl remodel kitchen, bedrooms, bath, add 1 bedroom, full bath
Details
Permit
202002063772
Status
complete
Filed
Feb 6, 2020
Permit issued
May 20, 2020
Final sign-off
Nov 30, 2021
Declared cost
$5,000
Address
2388 Greenwich St

1st fl add 1 bedroom, 1 full bath, family rm, 2nd fl remodel kitchen, bedrooms, bath. add 1 full bath, 3rd fl remodel kitchen, bedrooms, bath, add 1 bedroom, full bath

Open the permit page

$5,000
Feb 3, 2020Completed
final sign-off Oct 2020
1493 Masonic Avlegalize rooms on 1st floor: 1 bedroom, 1 playroom, and 1 full bath
Details
Permit
202002033405
Status
complete
Filed
Feb 3, 2020
Permit issued
Feb 6, 2020
Final sign-off
Oct 2, 2020
Declared cost
$30,000
Address
1493 Masonic Av

legalize rooms on 1st floor: 1 bedroom, 1 playroom, and 1 full bath

Open the permit page

$30,000
Dec 30, 2019Completed
final sign-off Aug 2025
619 Bosworth Stadd 2 bedrooms to 1st fl. add 1 bath to 1st fl, rebuild staircase from ground to 2nd fl. add laundry rm with sink to 1st fl. relocate water heater. relocated gas meter. remove central furnace and ducts. rebuild back staircase. relocate door on 2nd fl den
Details
Permit
201912300893
Status
complete
Filed
Dec 30, 2019
Permit issued
Apr 15, 2021
Final sign-off
Aug 14, 2025
Declared cost
$40,000
Address
619 Bosworth St

add 2 bedrooms to 1st fl. add 1 bath to 1st fl, rebuild staircase from ground to 2nd fl. add laundry rm with sink to 1st fl. relocate water heater. relocated gas meter. remove central furnace and ducts. rebuild back staircase. relocate door on 2nd fl den

Open the permit page

$40,000
Nov 6, 2019Completed
final sign-off Oct 2020
1493 Masonic Avremodel kitchen & 2 bathrooms on 3/f & remodel powder room on 2/f.
Details
Permit
201911066629
Status
complete
Filed
Nov 6, 2019
Permit issued
Nov 6, 2019
Final sign-off
Oct 2, 2020
Declared cost
$35,000
Address
1493 Masonic Av

remodel kitchen & 2 bathrooms on 3/f & remodel powder room on 2/f.

Open the permit page

$35,000
Oct 22, 2019Completed
final sign-off Jun 2021
1097 Green Stunit 10: 4th fl: kitchen remodel, replace kitchen cabinets, sink,stove, install recessed lights. 2 bath remodel, remove replace e toilets, sinks, remove e tub and replace with new shower, add shower at existing powder room
Details
Permit
201910225127
Status
complete
Filed
Oct 22, 2019
Permit issued
Nov 6, 2019
Final sign-off
Jun 4, 2021
Declared cost
$40,000
Address
1097 Green St

unit 10: 4th fl: kitchen remodel, replace kitchen cabinets, sink,stove, install recessed lights. 2 bath remodel, remove replace e toilets, sinks, remove e tub and replace with new shower, add shower at existing powder room

Open the permit page

$40,000
Oct 7, 2019Completed
final sign-off Oct 2020
2027 17th Avinterior remodel: convert (e) garage to 1 bedroom, 1 entertainment room & 1 bath, add 1 bike parking 1st fl. remove (e) door from (e) stair to (e) kitchen of 2nd fl. mech elec plumbing under separate permits
Details
Permit
201910073665
Status
complete
Filed
Oct 7, 2019
Permit issued
Nov 25, 2019
Final sign-off
Oct 14, 2020
Declared cost
$100,000
Address
2027 17th Av

interior remodel: convert (e) garage to 1 bedroom, 1 entertainment room & 1 bath, add 1 bike parking 1st fl. remove (e) door from (e) stair to (e) kitchen of 2nd fl. mech elec plumbing under separate permits

Open the permit page

$100,000
Oct 4, 2019Completed
final sign-off Sep 2020
1867 34th Avremodel 10x10 kitchen and one bathroom 5x7. add 23 new lights.
Details
Permit
201910043634
Status
complete
Filed
Oct 4, 2019
Permit issued
Oct 4, 2019
Final sign-off
Sep 24, 2020
Declared cost
$25,000
Address
1867 34th Av

remodel 10x10 kitchen and one bathroom 5x7. add 23 new lights.

Open the permit page

$25,000
Sep 30, 2019Completed
final sign-off Sep 2020
521 Ellsworth St1sr flr - add master bedroom, 1 full bath and family rm, 2nd flr - remodel kitchen and bath
Details
Permit
201909303064
Status
complete
Filed
Sep 30, 2019
Permit issued
Jan 27, 2020
Final sign-off
Sep 22, 2020
Declared cost
$55,000
Address
521 Ellsworth St

1sr flr - add master bedroom, 1 full bath and family rm, 2nd flr - remodel kitchen and bath

Open the permit page

$55,000
Sep 19, 2019In progress
issued Aug 2026
880 Pacheco Stbasemen: add adu per ord# 95-17. add kitchen, living, 1 bedroom and 1 full bath. comply w/ complaint # 201831925.**maher n/a** note: fire sprinkler required as a 4-story structure per sfbc/infill & change of use at lowest level. mgw
Details
Permit
201909192171
Status
issued
Filed
Sep 19, 2019
Permit issued
Aug 27, 2026
Declared cost
$76,000
Address
880 Pacheco St

basemen: add adu per ord# 95-17. add kitchen, living, 1 bedroom and 1 full bath. comply w/ complaint # 201831925.**maher n/a** note: fire sprinkler required as a 4-story structure per sfbc/infill & change of use at lowest level. mgw

Open the permit page

$76,000
Aug 23, 2019Completed
final sign-off Mar 2022
766 Moscow Stto comply w/ nov 201933241. 1st fl - add w bedrooms, 1 full bath, media & family; 2nd fl - remodel kitchen & bathroom. add 1 bedroom, home office & 2 full bathrooms; add new deck 2 rear. remove storage @ rear
Details
Permit
201908239725
Status
complete
Filed
Aug 23, 2019
Permit issued
May 28, 2020
Final sign-off
Mar 23, 2022
Declared cost
$70,000
Address
766 Moscow St

to comply w/ nov 201933241. 1st fl - add w bedrooms, 1 full bath, media & family; 2nd fl - remodel kitchen & bathroom. add 1 bedroom, home office & 2 full bathrooms; add new deck 2 rear. remove storage @ rear

Open the permit page

$70,000
Jul 18, 2019Completed
final sign-off Oct 2020
123 Westwood Dr1st fl - add 2 bedrooms, 1 full bath and laundry; 2nd fl- remodel kitchen and bath; replace front window at attic in-kind
Details
Permit
201907186242
Status
complete
Filed
Jul 18, 2019
Permit issued
Aug 9, 2019
Final sign-off
Oct 8, 2020
Declared cost
$60,000
Address
123 Westwood Dr

1st fl - add 2 bedrooms, 1 full bath and laundry; 2nd fl- remodel kitchen and bath; replace front window at attic in-kind

Open the permit page

$60,000
Jul 18, 2019Completed
final sign-off Apr 2022
2046 44th Avadditional of dwelling unit at 1st flr per ordinance no. 95-17. remodel both floors, rear 2-story horizontal addition for new bedroom & bathroom, 1-level wood deck.
Details
Permit
201907186189
Status
complete
Filed
Jul 18, 2019
Permit issued
Sep 10, 2020
Final sign-off
Apr 4, 2022
Declared cost
$90,000
Address
2046 44th Av

additional of dwelling unit at 1st flr per ordinance no. 95-17. remodel both floors, rear 2-story horizontal addition for new bedroom & bathroom, 1-level wood deck.

Open the permit page

$90,000
May 21, 2019Completed
final sign-off Jan 2021
4319 25th Stremodel single fam dwelling:infill below (e) habitable space at rear rooms down at 1st flr. bedrooms & bathrooms:(n) windows & doors at rear. replace (e) windows in-kind all windows visible from street.
Details
Permit
201905211258
Status
complete
Filed
May 21, 2019
Permit issued
Jun 7, 2019
Final sign-off
Jan 22, 2021
Declared cost
$140,000
Address
4319 25th St

remodel single fam dwelling:infill below (e) habitable space at rear rooms down at 1st flr. bedrooms & bathrooms:(n) windows & doors at rear. replace (e) windows in-kind all windows visible from street.

Open the permit page

$140,000
Apr 18, 2019Completed
final sign-off Jan 2021
4319 25th Strenovation of (e) single family dwelling adding dormers to extg attic space for addition of (n) bathroom & bedroom, family room at attic. new stair to attic level (3rd floor level). new windows at dormers and back elevation. ref app#201905211258
Details
Permit
201904188412
Status
complete
Filed
Apr 18, 2019
Permit issued
Jul 3, 2019
Final sign-off
Jan 22, 2021
Declared cost
$60,000
Address
4319 25th St

renovation of (e) single family dwelling adding dormers to extg attic space for addition of (n) bathroom & bedroom, family room at attic. new stair to attic level (3rd floor level). new windows at dormers and back elevation. ref app#201905211258

Open the permit page

$60,000
Feb 20, 2019Completed
final sign-off Sep 2020
1627 37th Av1st flr - add 2 bedrooms, 2 full bathrooms, media and laundry. 2nd flr - remodel kitchen and bath, ass 1 full bath. reconfigure interior stairs and infill south lightwell
Details
Permit
201902203375
Status
complete
Filed
Feb 20, 2019
Permit issued
Feb 28, 2019
Final sign-off
Sep 11, 2020
Declared cost
$80,000
Address
1627 37th Av

1st flr - add 2 bedrooms, 2 full bathrooms, media and laundry. 2nd flr - remodel kitchen and bath, ass 1 full bath. reconfigure interior stairs and infill south lightwell

Open the permit page

$80,000
Feb 11, 2019Completed
final sign-off May 2019
518 46th Avunit 518 & 520: remodel (2) kitchens (115 sq. ft. each) & (2) bathrooms (40 sq. ft. each), no change in fixture location
Details
Permit
201902112612
Status
complete
Filed
Feb 11, 2019
Permit issued
Feb 11, 2019
Final sign-off
May 6, 2019
Declared cost
$45,000
Address
518 46th Av

unit 518 & 520: remodel (2) kitchens (115 sq. ft. each) & (2) bathrooms (40 sq. ft. each), no change in fixture location

Open the permit page

$45,000
Feb 1, 2019Completed
final sign-off Jun 2020
2074 45th Avinterior renovation to include removal of walls between kitchen and living room. enlarge royer, new bathroom and laundry @ ground floor.
Details
Permit
201902011875
Status
complete
Filed
Feb 1, 2019
Permit issued
May 1, 2019
Final sign-off
Jun 15, 2020
Declared cost
$90,000
Address
2074 45th Av

interior renovation to include removal of walls between kitchen and living room. enlarge royer, new bathroom and laundry @ ground floor.

Open the permit page

$90,000
Dec 31, 2018Completed
final sign-off Apr 2019
619 Bosworth Stremodel 2nd floor bathroom with shower pan.
Details
Permit
201812319388
Status
complete
Filed
Dec 31, 2018
Permit issued
Dec 31, 2018
Final sign-off
Apr 19, 2019
Declared cost
$6,000
Address
619 Bosworth St

remodel 2nd floor bathroom with shower pan.

Open the permit page

$6,000
Dec 18, 2018Completed
final sign-off Apr 2019
727 Delano Avrevision to bap# 2017-1020-1835. adding a new laundry area, revise bathroom layout on ground floor. remove window in bathroom. new independent heating unit for accessary unit "727 delano ave"
Details
Permit
201812188574
Status
complete
Filed
Dec 18, 2018
Permit issued
Dec 18, 2018
Final sign-off
Apr 12, 2019
Declared cost
$3,000
Address
727 Delano Av

revision to bap# 2017-1020-1835. adding a new laundry area, revise bathroom layout on ground floor. remove window in bathroom. new independent heating unit for accessary unit "727 delano ave"

Open the permit page

$3,000
Nov 20, 2018Completed
final sign-off May 2019
518 46th Av1st flr - convert (e) half bath to full. 2nd flr - add laundry and interior stairs to connect floors. 3rd flr - add laundry and stairs to roof. add roof deck. infill south lightwell at 1st and 2nd flr against blind wall
Details
Permit
201811206468
Status
complete
Filed
Nov 20, 2018
Permit issued
Dec 13, 2018
Final sign-off
May 7, 2019
Declared cost
$30,000
Address
518 46th Av

1st flr - convert (e) half bath to full. 2nd flr - add laundry and interior stairs to connect floors. 3rd flr - add laundry and stairs to roof. add roof deck. infill south lightwell at 1st and 2nd flr against blind wall

Open the permit page

$30,000
Nov 19, 2018Completed
final sign-off Feb 2019
729 Rolph Ston 2nd fl - to comply with his nov 201835213 dated 4/2/2018, convert closet to a powder room, exhaust fan in 1/2 bath.
Details
Permit
201811196216
Status
complete
Filed
Nov 19, 2018
Permit issued
Dec 5, 2018
Final sign-off
Feb 25, 2019
Declared cost
$8,000
Address
729 Rolph St

on 2nd fl - to comply with his nov 201835213 dated 4/2/2018, convert closet to a powder room, exhaust fan in 1/2 bath.

Open the permit page

$8,000
Oct 31, 2018Completed
final sign-off Aug 2023
440 28th St1. excavate basement crawl space to add living space(194 sf) including a full bath. 2. expand main flr to rear(207 sf), remodel kitchen, bath & stair. 3. 2nd flr bedroom expansion @ rear(400 sf), add a bathroom.
Details
Permit
201810314602
Status
complete
Filed
Oct 31, 2018
Permit issued
Nov 26, 2019
Final sign-off
Aug 25, 2023
Declared cost
$200,000
Address
440 28th St

1. excavate basement crawl space to add living space(194 sf) including a full bath. 2. expand main flr to rear(207 sf), remodel kitchen, bath & stair. 3. 2nd flr bedroom expansion @ rear(400 sf), add a bathroom.

Open the permit page

$200,000
Oct 9, 2018Completed
final sign-off Mar 2020
1955 San Jose Av1st fl. add (2) bedrooms, (1) bath, and media room, 2nd fl: total remodel. add (1) full bath; replace water heat and furnace
Details
Permit
201810092657
Status
complete
Filed
Oct 9, 2018
Permit issued
Oct 23, 2018
Final sign-off
Mar 12, 2020
Declared cost
$55,000
Address
1955 San Jose Av

1st fl. add (2) bedrooms, (1) bath, and media room, 2nd fl: total remodel. add (1) full bath; replace water heat and furnace

Open the permit page

$55,000
May 8, 2018Completed
final sign-off May 2019
2048 14th Av1st floor: add half bath, study room and laundry. 2nd floor: remodel bathroom. 3rd floor: remodel bathroom.
Details
Permit
201805088545
Status
complete
Filed
May 8, 2018
Permit issued
Jun 25, 2018
Final sign-off
May 8, 2019
Declared cost
$50,000
Address
2048 14th Av

1st floor: add half bath, study room and laundry. 2nd floor: remodel bathroom. 3rd floor: remodel bathroom.

Open the permit page

$50,000
Jan 10, 2018Completed
final sign-off May 2019
151 Laidley St1st fl: remodel kitchen and bath. add interior stairs. basement: add 2 bedrooms, 1 full bath and deck.
Details
Permit
201801108299
Status
complete
Filed
Jan 10, 2018
Permit issued
Feb 16, 2018
Final sign-off
May 13, 2019
Declared cost
$75,000
Address
151 Laidley St

1st fl: remodel kitchen and bath. add interior stairs. basement: add 2 bedrooms, 1 full bath and deck.

Open the permit page

$75,000
Dec 5, 2017Completed
final sign-off Apr 2019
108 Palm Av1st floor: add 1 bedroom, 2 full baths, family room & den. 2nd floor: remodel ktichen & 2 baths.
Details
Permit
201712055550
Status
complete
Filed
Dec 5, 2017
Permit issued
Jan 8, 2018
Final sign-off
Apr 19, 2019
Declared cost
$120,000
Address
108 Palm Av

1st floor: add 1 bedroom, 2 full baths, family room & den. 2nd floor: remodel ktichen & 2 baths.

Open the permit page

$120,000
Oct 31, 2017Completed
final sign-off Aug 2018
393 30th Av2nd floor: remodel kitchen and bath. 3rd floor: remodel bath and add 1 bath
Details
Permit
201710312776
Status
complete
Filed
Oct 31, 2017
Permit issued
Nov 6, 2017
Final sign-off
Aug 9, 2018
Declared cost
$30,000
Address
393 30th Av

2nd floor: remodel kitchen and bath. 3rd floor: remodel bath and add 1 bath

Open the permit page

$30,000
Jul 1, 2014Never finaled
issued Feb 2017, no final
1419 Funston Avremodel 2nd level & add 2nd unit on 3rd floor including kitchen and bathroom. also rear horizontal addition.
Details
Permit
201407010196
Status
reinstated
Filed
Jul 1, 2014
Permit issued
Feb 3, 2017
Declared cost
$200,000
Address
1419 Funston Av

remodel 2nd level & add 2nd unit on 3rd floor including kitchen and bathroom. also rear horizontal addition.

Open the permit page

$200,000