Back to kitchen remodel contractors
Ccm Finish Carpentry & Construction
- Based in
- San Francisco
- On San Francisco permits
- Mar 2012 to Jul 2020
- Last 24 months
- 0 permits filed
16 permits since 2000: 16 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Kitchen remodel permits
3 kitchen remodel permits: 3 completed. Typically 0 days from filing to permit and 73 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jan 12, 2015 | Completed final sign-off Apr 2015 | 1268 Treat Av | the existing kitchen at upper level will be remodeled as shown.the existing kitchen pantry will be expanded for new bathrm, relocate washer/dryer & water will be relocated as shown. (e)bedrm door will be relocated & widened as shown.Details
the existing kitchen at upper level will be remodeled as shown.the existing kitchen pantry will be expanded for new bathrm, relocate washer/dryer & water will be relocated as shown. (e)bedrm door will be relocated & widened as shown. | $35,000 |
| Jun 10, 2013 | Completed final sign-off Aug 2013 | 719 Anderson St | remodel kitchen, remove 2 walls, add structural beams & posts.Details
remodel kitchen, remove 2 walls, add structural beams & posts. | $15,000 |
| Mar 20, 2012 | Completed final sign-off May 2012 | 855 Lincoln Wy | kitchen remodel. no change to floor plan or walls. rewire kitchen, move sub panel from closet to hallway. add recessed lighting to living room use existing plumbing (n) kitchen lighting shall comply with cec 150(k)8Details
kitchen remodel. no change to floor plan or walls. rewire kitchen, move sub panel from closet to hallway. add recessed lighting to living room use existing plumbing (n) kitchen lighting shall comply with cec 150(k)8 | $18,000 |