Ccm Finish Carpentry & Construction
- Based in
- San Francisco
- On San Francisco permits
- Mar 2012 to Jul 2020
- Last 24 months
- 0 permits filed
16 permits since 2000: 16 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
3 bathroom remodel permits: 3 completed. Typically 3 days from filing to permit and 927 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Nov 13, 2015 | Completed final sign-off May 2018 | 448 Missouri St | demo 3 int walls to accomodate bath relocation. structural beam/posts w/spread footings req'd. demo (e) chimney, relocate water heater. new plywood shear wall w/footing at rear of bldg. new bath addition to 2nd flr, window reconfiguration at rear of bldg as shown.Details
demo 3 int walls to accomodate bath relocation. structural beam/posts w/spread footings req'd. demo (e) chimney, relocate water heater. new plywood shear wall w/footing at rear of bldg. new bath addition to 2nd flr, window reconfiguration at rear of bldg as shown. | $52,500 |
| Nov 13, 2015 | Completed final sign-off May 2018 | 446 Missouri St | demo 3 int walls to accomodate bath relocation. structural beam/posts w/spread footings req'd . demo (e) chimney, relocate water heater. new plywood shear wall w/footing at rear of bldg. new bath addition to 3rd flr, window reconfiguration at rear of bldg as shown.light tubes on upper flr as shown.Details
demo 3 int walls to accomodate bath relocation. structural beam/posts w/spread footings req'd . demo (e) chimney, relocate water heater. new plywood shear wall w/footing at rear of bldg. new bath addition to 3rd flr, window reconfiguration at rear of bldg as shown.light tubes on upper flr as shown. | $52,500 |
| Nov 21, 2012 | Completed final sign-off Jan 2013 | 855 Lincoln Wy | unit #1: bathroom remodel. move (e) drain. shorten 2 feet. install tub. retile shower area. install vinity and sink. new floor tile. drywal.Details
unit #1: bathroom remodel. move (e) drain. shorten 2 feet. install tub. retile shower area. install vinity and sink. new floor tile. drywal. | $7,500 |