Back to kitchen remodel contractors
Cark Construction
- Based in
- Novato
- On San Francisco permits
- Dec 2006 to Nov 2014
- Last 24 months
- 0 permits filed
6 permits since 2000: 5 completed, 1 never finaled.
Of the 1 never-finaled permit, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Kitchen remodel permits
1 kitchen remodel permit: 1 completed. Typically 104 days from filing to permit and 282 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jan 4, 2007 | Completed final sign-off Jan 2008 | 579 Moultrie St | remodelng of existing two story over garage dwellings new foundation partial and remodeling at lower floor level. reworking bathroom new bath fixtures and tile work and remodeling part of kitchen area at main floor replacing received second means of egress at rear.Details
remodelng of existing two story over garage dwellings new foundation partial and remodeling at lower floor level. reworking bathroom new bath fixtures and tile work and remodeling part of kitchen area at main floor replacing received second means of egress at rear. | $35,000 |