Back to bathroom remodel contractors
Cark Construction
- Based in
- Novato
- On San Francisco permits
- Dec 2006 to Nov 2014
- Last 24 months
- 0 permits filed
6 permits since 2000: 5 completed, 1 never finaled.
Of the 1 never-finaled permit, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
2 bathroom remodel permits: 2 completed. Typically 58 days from filing to permit and 1234 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Nov 21, 2014 | Completed final sign-off Nov 2020 | 1632 Broderick St | convert existing space at 1/f to conditioned living space, add bedroom and replacing (e) winder stairs. work is in addition to pa# 201406209011 that added a bath at 1/fDetails
convert existing space at 1/f to conditioned living space, add bedroom and replacing (e) winder stairs. work is in addition to pa# 201406209011 that added a bath at 1/f | $20,000 |
| Jan 4, 2007 | Completed final sign-off Jan 2008 | 579 Moultrie St | remodelng of existing two story over garage dwellings new foundation partial and remodeling at lower floor level. reworking bathroom new bath fixtures and tile work and remodeling part of kitchen area at main floor replacing received second means of egress at rear.Details
remodelng of existing two story over garage dwellings new foundation partial and remodeling at lower floor level. reworking bathroom new bath fixtures and tile work and remodeling part of kitchen area at main floor replacing received second means of egress at rear. | $35,000 |