Camello Inc.
- Based in
- San Leandro
- On San Francisco permits
- Jun 2010 to May 2026
- Last 24 months
- 6 permits filed
43 permits since 2000: 39 completed, 2 never finaled, 2 expired or cancelled.
Of the 2 never-finaled permits, 2 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Stairs permits
3 stairs permits: 3 completed. Typically 46 days from filing to permit and 233 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 28, 2024 | Completed final sign-off Mar 2025 | 201 Pine St | rev 202304045050- basement,1st, 2nd floor- includes mijor work on 3 floors : basement- structrually modify (e) steel beam, leave door @ fire control panel room, leave (e) elevator machine room walls. 1st flr- relocated access seating, (n) bathroom sink, leave stair wall. exterior work under separteDetails
rev 202304045050- basement,1st, 2nd floor- includes mijor work on 3 floors : basement- structrually modify (e) steel beam, leave door @ fire control panel room, leave (e) elevator machine room walls. 1st flr- relocated access seating, (n) bathroom sink, leave stair wall. exterior work under separte | |
| Apr 4, 2023 | Completed final sign-off Mar 2025 | 201 Pine St | remodel basement, 1st & 2nd fl. for (n) restaurant in an (e) 6 story bldg. 1st & 2nd fl. will be a change of use to an assembly occupancy. work includes (n) main stair, (n) kitchens at all 3 fls, (n) bathrooms, seating areas & bars. exterior work under sep permit. sprinklers under sep permit.Details
remodel basement, 1st & 2nd fl. for (n) restaurant in an (e) 6 story bldg. 1st & 2nd fl. will be a change of use to an assembly occupancy. work includes (n) main stair, (n) kitchens at all 3 fls, (n) bathrooms, seating areas & bars. exterior work under sep permit. sprinklers under sep permit. | $980,000 |
| Apr 18, 2011 | Completed final sign-off Aug 2011 | 2509 Bush St | coversion of extg 2 unit (r) occupancy to (e) ocupancy day-care(pre-school). remodel (e) bathrooms, partition walls, rated walls at basement, re-build the rear stair way partial and sprinkler the entire bldg.Details
coversion of extg 2 unit (r) occupancy to (e) ocupancy day-care(pre-school). remodel (e) bathrooms, partition walls, rated walls at basement, re-build the rear stair way partial and sprinkler the entire bldg. | $50,000 |