Back to kitchen remodel contractors
California Construction Bay Area Inc
- Based in
- San Jose
- On San Francisco permits
- Jul 2018 to May 2026
- Last 24 months
- 1 permit filed
19 permits since 2000: 15 completed, 4 never finaled.
Of the 4 never-finaled permits, 1 is 3 to 5 years old, 3 are 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
7 kitchen remodel permits: 7 completed. Typically 0 days from filing to permit and 164 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 27, 2022 | Completed final sign-off Apr 2023 | 1970 Sutter St | kitchen remodel like to like, bath remodel convert tub to shower, 16 recessed lights in liiving rm, kitchen and bedroom, add pendant lights. no structural work.Details
kitchen remodel like to like, bath remodel convert tub to shower, 16 recessed lights in liiving rm, kitchen and bedroom, add pendant lights. no structural work. | $170,000 |
| Sep 8, 2022 | Completed final sign-off Jun 2023 | 100 Country Club Dr | structural work kitchen remodeling (no exterior changes) remove wall, replace sink and faucet add (11) recess lights, gfci to code, 2 pendant lights, upgrade (e) main panel (100-200)Details
structural work kitchen remodeling (no exterior changes) remove wall, replace sink and faucet add (11) recess lights, gfci to code, 2 pendant lights, upgrade (e) main panel (100-200) | $78,000 |
| Jun 27, 2022 | Completed final sign-off Dec 2022 | 90 Valdez Av | kitchen remodeling, replace sink/faucet. relocate hood, install new 6 gfci(3 outlets). no framing modification. no structural work.Details
kitchen remodeling, replace sink/faucet. relocate hood, install new 6 gfci(3 outlets). no framing modification. no structural work. | $60,000 |
| Nov 16, 2021 | Completed final sign-off Apr 2022 | 122 Vienna St | kitchen remodeling:like for like,non-structural ~250sqft. replace sink(same location)replace applicances,add 4 recess lights,add 46gfci,add 2 switches. upgrade main panel(100amp to 200 amp)replace subpanel(same amp)Details
kitchen remodeling:like for like,non-structural ~250sqft. replace sink(same location)replace applicances,add 4 recess lights,add 46gfci,add 2 switches. upgrade main panel(100amp to 200 amp)replace subpanel(same amp) | $80,000 |
| Oct 14, 2021 | Completed final sign-off Feb 2022 | 557 Leland Av | kitchen remodeling- non structural (like for like) replace sink/ faucet, replace hood, replace range. bathroom remodeling- non structural (like for like) replace sink, toilet, tub, shower.Details
kitchen remodeling- non structural (like for like) replace sink/ faucet, replace hood, replace range. bathroom remodeling- non structural (like for like) replace sink, toilet, tub, shower. | $59,000 |
| Jun 17, 2021 | Completed final sign-off Dec 2021 | 600 Saint Francis Bl | structural kitchen remodelingDetails
structural kitchen remodeling | $83,000 |
| Oct 19, 2020 | Completed final sign-off Dec 2020 | 1939 46th Av | kitchen remodel like to like bathroom remodel like to like replace sky light same location same size. enlarge subpanel box.Details
kitchen remodel like to like bathroom remodel like to like replace sky light same location same size. enlarge subpanel box. | $85,000 |