Back to bathroom remodel contractors
California Construction Bay Area Inc
- Based in
- San Jose
- On San Francisco permits
- Jul 2018 to May 2026
- Last 24 months
- 1 permit filed
19 permits since 2000: 15 completed, 4 never finaled.
Of the 4 never-finaled permits, 1 is 3 to 5 years old, 3 are 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
10 bathroom remodel permits: 7 completed, 3 never finaled. Typically 0 days from filing to permit and 131 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Feb 22, 2024 | Completed final sign-off Jun 2024 | 2875 Jackson St | unit 1; non-structural. no exterior work. bathroom remodeling - replace double sink vanity, install new 6fci (2), install light fixtures (2).Details
unit 1; non-structural. no exterior work. bathroom remodeling - replace double sink vanity, install new 6fci (2), install light fixtures (2). | $17,450 |
| Sep 27, 2022 | Completed final sign-off Apr 2023 | 1970 Sutter St | kitchen remodel like to like, bath remodel convert tub to shower, 16 recessed lights in liiving rm, kitchen and bedroom, add pendant lights. no structural work.Details
kitchen remodel like to like, bath remodel convert tub to shower, 16 recessed lights in liiving rm, kitchen and bedroom, add pendant lights. no structural work. | $170,000 |
| Jun 27, 2022 | Never finaled issued Aug 2023, no final | 168 Delano Av | convert (e) basement to habitable space (612 sqft). add master bedroom, bathroom, closet, powder room, family room. remodel laundry area. replace furnace. add mini split unit. install (n) tankless water heater.Details
convert (e) basement to habitable space (612 sqft). add master bedroom, bathroom, closet, powder room, family room. remodel laundry area. replace furnace. add mini split unit. install (n) tankless water heater. | $427,000 |
| Mar 22, 2022 | Completed final sign-off Mar 2023 | 2367 12th Av | no exterior changes. bathroom remodeling: add 1 sink (double sink vanity) relocate toilet, showerremodel. replace exhaust fan , add 2 gfci, add 2 recess lights, add 2 light fixtures.Details
no exterior changes. bathroom remodeling: add 1 sink (double sink vanity) relocate toilet, showerremodel. replace exhaust fan , add 2 gfci, add 2 recess lights, add 2 light fixtures. | $28,480 |
| Oct 26, 2021 | Completed final sign-off Jan 2022 | 1867 Stockton St | bathroom remodeling non structural replace free standing tub and replace vanity add gfciDetails
bathroom remodeling non structural replace free standing tub and replace vanity add gfci | $18,500 |
| Oct 14, 2021 | Completed final sign-off Feb 2022 | 557 Leland Av | kitchen remodeling- non structural (like for like) replace sink/ faucet, replace hood, replace range. bathroom remodeling- non structural (like for like) replace sink, toilet, tub, shower.Details
kitchen remodeling- non structural (like for like) replace sink/ faucet, replace hood, replace range. bathroom remodeling- non structural (like for like) replace sink, toilet, tub, shower. | $59,000 |
| Feb 25, 2021 | Never finaled issued Feb 2021, no final | 631 Folsom St | bathroom remodel like for like add 1 recessed light replace exhaust fan. add 1 outlet. no structural work. all walls to remainDetails
bathroom remodel like for like add 1 recessed light replace exhaust fan. add 1 outlet. no structural work. all walls to remain | $30,000 |
| Oct 19, 2020 | Completed final sign-off Dec 2020 | 1939 46th Av | kitchen remodel like to like bathroom remodel like to like replace sky light same location same size. enlarge subpanel box.Details
kitchen remodel like to like bathroom remodel like to like replace sky light same location same size. enlarge subpanel box. | $85,000 |
| Nov 4, 2019 | Completed final sign-off Oct 2020 | 19 Southwood Dr | 2nd fl bathroom remodel (like for like). replace fixturesDetails
2nd fl bathroom remodel (like for like). replace fixtures | $20,000 |
| Jul 6, 2018 | Never finaled issued Jul 2018, no final | 1363 Palou Av | bathroom remodel in-kindDetails
bathroom remodel in-kind | $26,000 |