Back to kitchen remodel contractors
Caleb Kinser Construction
- Based in
- San Francisco
- On San Francisco permits
- Aug 2013 to Jul 2018
- Last 24 months
- 0 permits filed
18 permits since 2000: 16 completed, 1 never finaled, 1 expired or cancelled.
Of the 1 never-finaled permit, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Kitchen remodel permits
2 kitchen remodel permits: 2 completed. Typically 0 days from filing to permit and 96 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Dec 14, 2016 | Completed final sign-off Mar 2017 | 28 Winfield St | windows not visible from street. new bath & demo upper level bath w/ same footprint. demo windows at upper level rear & replace w/ new slider 5 windows. kitchen remodel. sand & refinish upper level hardwood floors. electrical recessed lights.Details
windows not visible from street. new bath & demo upper level bath w/ same footprint. demo windows at upper level rear & replace w/ new slider 5 windows. kitchen remodel. sand & refinish upper level hardwood floors. electrical recessed lights. | $31,000 |
| Aug 30, 2013 | Completed final sign-off Dec 2013 | 237 Arguello Bl | r & r kitchen cabs, new linoleum floor, new counter top, new hot & cold angle stops, are=8'x9' electrical: 3 new additional outlets to kitchen counter (2) small appliance circuits to be installed. move refridge outlet, (n) flourescent light (4) title 24; power (4) future hood fan, new sub panelDetails
r & r kitchen cabs, new linoleum floor, new counter top, new hot & cold angle stops, are=8'x9' electrical: 3 new additional outlets to kitchen counter (2) small appliance circuits to be installed. move refridge outlet, (n) flourescent light (4) title 24; power (4) future hood fan, new sub panel | $13,970 |