Back to bathroom remodel contractors
Caleb Kinser Construction
- Based in
- San Francisco
- On San Francisco permits
- Aug 2013 to Jul 2018
- Last 24 months
- 0 permits filed
18 permits since 2000: 16 completed, 1 never finaled, 1 expired or cancelled.
Of the 1 never-finaled permit, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
6 bathroom remodel permits: 6 completed. Typically 0 days from filing to permit and 104 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Apr 25, 2018 | Completed final sign-off Jul 2018 | 3550 Market St | apt #302: remodel bathroom-new vanity, tiles, shower, toilet, (3) led cans, fan.Details
apt #302: remodel bathroom-new vanity, tiles, shower, toilet, (3) led cans, fan. | $40,000 |
| Dec 14, 2016 | Completed final sign-off Mar 2017 | 28 Winfield St | windows not visible from street. new bath & demo upper level bath w/ same footprint. demo windows at upper level rear & replace w/ new slider 5 windows. kitchen remodel. sand & refinish upper level hardwood floors. electrical recessed lights.Details
windows not visible from street. new bath & demo upper level bath w/ same footprint. demo windows at upper level rear & replace w/ new slider 5 windows. kitchen remodel. sand & refinish upper level hardwood floors. electrical recessed lights. | $31,000 |
| Jul 12, 2016 | Completed final sign-off Nov 2016 | 95 Keystone Wy | remove bearing & non bearing walls between living, dining & sunroom @ main floor. create new master suite by combining existing bath, bedroom & closet on upper level.Details
remove bearing & non bearing walls between living, dining & sunroom @ main floor. create new master suite by combining existing bath, bedroom & closet on upper level. | $50,000 |
| Mar 17, 2015 | Completed final sign-off Sep 2015 | 1612 York St | revision to permit 201412314762; building inspector asked for further detail on the footing condition on the north side of the new bathroom.Details
revision to permit 201412314762; building inspector asked for further detail on the footing condition on the north side of the new bathroom. | |
| Dec 31, 2014 | Completed final sign-off Sep 2015 | 1612 York St | relocation of washer and dryer. construction of new bathroom on botton floor (full bath)Details
relocation of washer and dryer. construction of new bathroom on botton floor (full bath) | $20,000 |
| Feb 5, 2014 | Completed final sign-off Apr 2014 | 237 Arguello Bl | #7: bathroom remodel (n) tub(n) toilet (n) vanity & sink (n) exhaust fan, remove lathe and plaster & install (n) sheetrock & (n) tile, 2 (n) low voltage recessed cans and new switch for fan. one new window in kind at light well not visible from street, no change of wall & doorDetails
#7: bathroom remodel (n) tub(n) toilet (n) vanity & sink (n) exhaust fan, remove lathe and plaster & install (n) sheetrock & (n) tile, 2 (n) low voltage recessed cans and new switch for fan. one new window in kind at light well not visible from street, no change of wall & door | $25,000 |