Back to kitchen remodel contractors
Cal Am Construction Inc.
- Based in
- San Francisco
- On San Francisco permits
- Oct 2006 to Jun 2026
- Last 24 months
- 10 permits filed
69 permits since 2000: 59 completed, 3 in progress, 6 never finaled, 1 expired or cancelled.
Of the 6 never-finaled permits, 3 are 5 to 10 years old, 3 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
17 kitchen remodel permits: 16 completed, 1 in progress. Typically 2 days from filing to permit and 168 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Mar 18, 2022 | Completed final sign-off Sep 2022 | 65 Heather Av | 1 kitchen & 1 bathroom remodel in-kind. replace cabinets, counter tops, replace/repair drywall. remove/replace tiles, vanities, fixtures including kitchen exhaust hood.Details
1 kitchen & 1 bathroom remodel in-kind. replace cabinets, counter tops, replace/repair drywall. remove/replace tiles, vanities, fixtures including kitchen exhaust hood. | $25,000 |
| Sep 21, 2021 | Completed final sign-off Dec 2023 | 4422 17th St | revision to pa 202012080497 to add powder room, bathroom remodel, reconfigure kitchen, new slider at rear.Details
revision to pa 202012080497 to add powder room, bathroom remodel, reconfigure kitchen, new slider at rear. | $30,000 |
| Dec 8, 2020 | Completed final sign-off Dec 2023 | 4422 17th St | interior renovation of existing single family dwelling. replace and reconfigure kitchen. replace and relocate exterior doors and window in rear. reconfigure downstairs family room to have family room stair foyer and officeDetails
interior renovation of existing single family dwelling. replace and reconfigure kitchen. replace and relocate exterior doors and window in rear. reconfigure downstairs family room to have family room stair foyer and office | $150,000 |
| Jul 16, 2019 | In progress issued Oct 2024 | 1300 44th Av | add 2nd dwelling unit (unit #2) at 1st fl, provide accessible entry ramp & bathroom. remodel upper unit #1 at 2nd fl. convert living area to bedroom. add 2nd bath. remodel kitchen & (e) bathroom. new landing & staid for upper unit access to rearyard. upgrade (e) furnace for 2nd fl unit.Details
add 2nd dwelling unit (unit #2) at 1st fl, provide accessible entry ramp & bathroom. remodel upper unit #1 at 2nd fl. convert living area to bedroom. add 2nd bath. remodel kitchen & (e) bathroom. new landing & staid for upper unit access to rearyard. upgrade (e) furnace for 2nd fl unit. | $90,000 |
| Nov 27, 2018 | Completed final sign-off Apr 2022 | 2650 Hyde St | rev to pa# 201507080940, interior revisions at 2nd fl. relocate kitchen and add (2) bathrooms, add denDetails
rev to pa# 201507080940, interior revisions at 2nd fl. relocate kitchen and add (2) bathrooms, add den | $10,000 |
| Apr 20, 2016 | Completed final sign-off Jul 2017 | 621 Lincoln Wy | 2nd flr, unit #2: convert remodel (e) kitchen/dining area, remodel (e) bathroom, upgrade (e) light fixtures. maher naDetails
2nd flr, unit #2: convert remodel (e) kitchen/dining area, remodel (e) bathroom, upgrade (e) light fixtures. maher na | $20,000 |
| Aug 13, 2013 | Completed final sign-off Apr 2014 | 1473 17th Av | remodel bathroom, replace kitchen cabinets and counter top, install insulation in three (3) exterior walls and ceilings. lighting comply with cec 150(k).Details
remodel bathroom, replace kitchen cabinets and counter top, install insulation in three (3) exterior walls and ceilings. lighting comply with cec 150(k). | $25,000 |
| Aug 7, 2013 | Completed final sign-off Mar 2014 | 124 Huntington Dr | 1st floor: add a master bedroom, a family room, and a bath. 2nd floor: add a bath, remodel extg bath and kitchen.Details
1st floor: add a master bedroom, a family room, and a bath. 2nd floor: add a bath, remodel extg bath and kitchen. | $48,000 |
| Jul 31, 2013 | Completed final sign-off Dec 2014 | 407 39th Av | interior remodel of kitchen, living room, master suite,wall and ceiling finishes and lighing. new balcony on third floor. addition of 2 new fixed glass skylights, replace garage door. install insulation through out 2nd & 3rd floor, replace windows in room 109, 111, 105, 104 & 201.Details
interior remodel of kitchen, living room, master suite,wall and ceiling finishes and lighing. new balcony on third floor. addition of 2 new fixed glass skylights, replace garage door. install insulation through out 2nd & 3rd floor, replace windows in room 109, 111, 105, 104 & 201. | $87,000 |
| Jun 11, 2013 | Completed final sign-off Sep 2013 | 78 Lobos St | remodel 1st floor to have a family room, a bath, a bedroom. add a bath, a wood deck on 2nd floor. remodel kitchen, change dining area to bedroom.Details
remodel 1st floor to have a family room, a bath, a bedroom. add a bath, a wood deck on 2nd floor. remodel kitchen, change dining area to bedroom. | $58,000 |
| Sep 14, 2012 | Completed final sign-off Aug 2013 | 1471 17th Av | interior work only-remodel 3rd floor (unit #2), remodel (e) kitchen, bathroom & master bedroom on 3rd floor. structural lateral strengthening of third floor only.Details
interior work only-remodel 3rd floor (unit #2), remodel (e) kitchen, bathroom & master bedroom on 3rd floor. structural lateral strengthening of third floor only. | $35,000 |
| Nov 3, 2011 | Completed final sign-off Feb 2012 | 632 25th Av | apt. # 4: replace kitchen cabinets and counter top - replace floor tiles. no change to appliances.Details
apt. # 4: replace kitchen cabinets and counter top - replace floor tiles. no change to appliances. | $6,500 |
| Aug 23, 2011 | Completed final sign-off Nov 2011 | 632 25th Av | unit #3: remodel kitchen: replace cabinet & counter tops. bath remodel; replace tub, tiles & vanity (some location).Details
unit #3: remodel kitchen: replace cabinet & counter tops. bath remodel; replace tub, tiles & vanity (some location). | $6,500 |
| Oct 16, 2009 | Completed final sign-off Dec 2009 | 2958 Bush St | remove & replace kitchen cabinets, island and counter tops. same size and same location.Details
remove & replace kitchen cabinets, island and counter tops. same size and same location. | $6,800 |
| May 12, 2008 | Completed final sign-off Aug 2008 | 327 Jersey St | kitchen remodel. remove & install all new cabinets & counter top. remove & replace dry wall. install new lighting. update electrical & plumbing to code.Details
kitchen remodel. remove & install all new cabinets & counter top. remove & replace dry wall. install new lighting. update electrical & plumbing to code. | $10,000 |
| May 12, 2008 | Completed final sign-off Jul 2008 | 1403 Golden Gate Av | work @ unit# 1403 only. kitchen remodel. remove & install all new cabinets & counter top. install under-cabinet lighting, recessed lights & update electrical / plumbing to code.Details
work @ unit# 1403 only. kitchen remodel. remove & install all new cabinets & counter top. install under-cabinet lighting, recessed lights & update electrical / plumbing to code. | $10,000 |
| Oct 24, 2007 | Completed final sign-off Dec 2007 | 180 Seal Rock Dr | remove & replace kitchen cabinets, upgrade electrical to gfi's, install gas shut-off valve and move exhaust hood in kitchen, patch drywall. work to occur in the lower unit onlyDetails
remove & replace kitchen cabinets, upgrade electrical to gfi's, install gas shut-off valve and move exhaust hood in kitchen, patch drywall. work to occur in the lower unit only | $9,500 |