Cal Am Construction Inc.
- Based in
- San Francisco
- On San Francisco permits
- Oct 2006 to Jun 2026
- Last 24 months
- 10 permits filed
69 permits since 2000: 59 completed, 3 in progress, 6 never finaled, 1 expired or cancelled.
Of the 6 never-finaled permits, 3 are 5 to 10 years old, 3 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
17 bathroom remodel permits: 16 completed, 1 in progress. Typically 27 days from filing to permit and 258 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Oct 31, 2022 | Completed final sign-off Jul 2023 | 4422 17th St | in-kind remodeling of 1 bathroom(s) in 1st fl with 0 shower pan(s).Details
in-kind remodeling of 1 bathroom(s) in 1st fl with 0 shower pan(s). | $8,500 |
| Mar 18, 2022 | Completed final sign-off Sep 2022 | 65 Heather Av | 1 kitchen & 1 bathroom remodel in-kind. replace cabinets, counter tops, replace/repair drywall. remove/replace tiles, vanities, fixtures including kitchen exhaust hood.Details
1 kitchen & 1 bathroom remodel in-kind. replace cabinets, counter tops, replace/repair drywall. remove/replace tiles, vanities, fixtures including kitchen exhaust hood. | $25,000 |
| Sep 21, 2021 | Completed final sign-off Dec 2023 | 4422 17th St | revision to pa 202012080497 to add powder room, bathroom remodel, reconfigure kitchen, new slider at rear.Details
revision to pa 202012080497 to add powder room, bathroom remodel, reconfigure kitchen, new slider at rear. | $30,000 |
| Oct 5, 2020 | Completed final sign-off Jun 2023 | 1800 Noriega St | revision to bpa # 201910043604. 2/fl:remodel two 3-fixture bathrooms. add laundry room. reconfigure mech. shaft. relocate laundry and mech room. add a skylight.Details
revision to bpa # 201910043604. 2/fl:remodel two 3-fixture bathrooms. add laundry room. reconfigure mech. shaft. relocate laundry and mech room. add a skylight. | |
| Oct 4, 2019 | Completed final sign-off Jun 2023 | 1800 Noriega St | rev to pa#201810254135. 2nd floor: 1)remodel extg bathroom, 2)add laundry room 3) add mech shaft, 4)exterior stair repair in kind <50%. 5)relocate wet bar, 6)reduce scope of work per plan.Details
rev to pa#201810254135. 2nd floor: 1)remodel extg bathroom, 2)add laundry room 3) add mech shaft, 4)exterior stair repair in kind <50%. 5)relocate wet bar, 6)reduce scope of work per plan. | $30,000 |
| Jul 16, 2019 | In progress issued Oct 2024 | 1300 44th Av | add 2nd dwelling unit (unit #2) at 1st fl, provide accessible entry ramp & bathroom. remodel upper unit #1 at 2nd fl. convert living area to bedroom. add 2nd bath. remodel kitchen & (e) bathroom. new landing & staid for upper unit access to rearyard. upgrade (e) furnace for 2nd fl unit.Details
add 2nd dwelling unit (unit #2) at 1st fl, provide accessible entry ramp & bathroom. remodel upper unit #1 at 2nd fl. convert living area to bedroom. add 2nd bath. remodel kitchen & (e) bathroom. new landing & staid for upper unit access to rearyard. upgrade (e) furnace for 2nd fl unit. | $90,000 |
| Nov 27, 2018 | Completed final sign-off Apr 2022 | 2650 Hyde St | rev to pa# 201507080940, interior revisions at 2nd fl. relocate kitchen and add (2) bathrooms, add denDetails
rev to pa# 201507080940, interior revisions at 2nd fl. relocate kitchen and add (2) bathrooms, add den | $10,000 |
| Apr 20, 2016 | Completed final sign-off Jul 2017 | 621 Lincoln Wy | 2nd flr, unit #2: convert remodel (e) kitchen/dining area, remodel (e) bathroom, upgrade (e) light fixtures. maher naDetails
2nd flr, unit #2: convert remodel (e) kitchen/dining area, remodel (e) bathroom, upgrade (e) light fixtures. maher na | $20,000 |
| Mar 11, 2016 | Completed final sign-off Mar 2017 | 251 Country Club Dr | convert part of garage space to a bedroom & a bath & reserve enough space for a 1 car garage. house will change from a 2 bedroom, 1 bath to a 3 bedroom 2 bath house s.f.d.Details
convert part of garage space to a bedroom & a bath & reserve enough space for a 1 car garage. house will change from a 2 bedroom, 1 bath to a 3 bedroom 2 bath house s.f.d. | $40,000 |
| Jul 8, 2015 | Completed final sign-off Apr 2022 | 2650 Hyde St | remodel to upper unit of 2 unit building. change rear portion of (e) gable roof to flat roof w/ roof deck above. interior remodel of 3rd floor below roof, including remodeled bathroom. new stair to roof. remodel interior stair. new small deck at level 3. ** maher: n/a **Details
remodel to upper unit of 2 unit building. change rear portion of (e) gable roof to flat roof w/ roof deck above. interior remodel of 3rd floor below roof, including remodeled bathroom. new stair to roof. remodel interior stair. new small deck at level 3. ** maher: n/a ** | $125,000 |
| Aug 13, 2013 | Completed final sign-off Apr 2014 | 1473 17th Av | remodel bathroom, replace kitchen cabinets and counter top, install insulation in three (3) exterior walls and ceilings. lighting comply with cec 150(k).Details
remodel bathroom, replace kitchen cabinets and counter top, install insulation in three (3) exterior walls and ceilings. lighting comply with cec 150(k). | $25,000 |
| Aug 7, 2013 | Completed final sign-off Mar 2014 | 124 Huntington Dr | 1st floor: add a master bedroom, a family room, and a bath. 2nd floor: add a bath, remodel extg bath and kitchen.Details
1st floor: add a master bedroom, a family room, and a bath. 2nd floor: add a bath, remodel extg bath and kitchen. | $48,000 |
| Jun 11, 2013 | Completed final sign-off Sep 2013 | 78 Lobos St | remodel 1st floor to have a family room, a bath, a bedroom. add a bath, a wood deck on 2nd floor. remodel kitchen, change dining area to bedroom.Details
remodel 1st floor to have a family room, a bath, a bedroom. add a bath, a wood deck on 2nd floor. remodel kitchen, change dining area to bedroom. | $58,000 |
| Sep 14, 2012 | Completed final sign-off Aug 2013 | 1471 17th Av | interior work only-remodel 3rd floor (unit #2), remodel (e) kitchen, bathroom & master bedroom on 3rd floor. structural lateral strengthening of third floor only.Details
interior work only-remodel 3rd floor (unit #2), remodel (e) kitchen, bathroom & master bedroom on 3rd floor. structural lateral strengthening of third floor only. | $35,000 |
| Jan 11, 2012 | Completed final sign-off May 2012 | 559 46th Av | level1:master suite with full bath, replace window, replace door with glass door. replace windows with outswing glass floors, relocate water heater, new furnace and utility sink. 1 hr rated wall between int. space and extg garage. level 2:no work. renewal to pa 201201122148Details
level1:master suite with full bath, replace window, replace door with glass door. replace windows with outswing glass floors, relocate water heater, new furnace and utility sink. 1 hr rated wall between int. space and extg garage. level 2:no work. renewal to pa 201201122148 | $47,000 |
| Aug 23, 2011 | Completed final sign-off Nov 2011 | 632 25th Av | unit #3: remodel kitchen: replace cabinet & counter tops. bath remodel; replace tub, tiles & vanity (some location).Details
unit #3: remodel kitchen: replace cabinet & counter tops. bath remodel; replace tub, tiles & vanity (some location). | $6,500 |
| Oct 12, 2006 | Completed final sign-off May 2009 | 2427 37th Av | rear horizontal extension. 2 levels. 2 beds, 2 baths, 1 family room. remodel of 2nd floor bath (remove shower stall) convert to closet.Details
rear horizontal extension. 2 levels. 2 beds, 2 baths, 1 family room. remodel of 2nd floor bath (remove shower stall) convert to closet. | $55,000 |