Cairn Construction
- Based in
- San Francisco
- On San Francisco permits
- Mar 2000 to Sep 2026
- Last 24 months
- 6 permits filed
233 permits since 2000: 183 completed, 5 in progress, 16 never finaled, 29 expired or cancelled.
Of the 16 never-finaled permits, 1 is 3 to 5 years old, 4 are 5 to 10 years old, 11 are over 10 years old. 2 were filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for pergola or trellis across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Pergola or trellis permits
1 pergola or trellis permit: 1 completed. Typically 80 days from filing to permit and 672 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 4, 2024 | Completed final sign-off Jun 2026 | 2880 Green St | 2nd fl: add (n) bifold door system, (n) counter top & awning window. (n) bbq area, remove sunroom & trellis. replace deck railing. plumbing work includes (n) gas connection for bbq but no (n) plumbing fixturesDetails
2nd fl: add (n) bifold door system, (n) counter top & awning window. (n) bbq area, remove sunroom & trellis. replace deck railing. plumbing work includes (n) gas connection for bbq but no (n) plumbing fixtures | $85,000 |