Back to bathroom remodel contractors
Cairn Construction
- Based in
- San Francisco
- On San Francisco permits
- Mar 2000 to Sep 2026
- Last 24 months
- 6 permits filed
233 permits since 2000: 183 completed, 5 in progress, 16 never finaled, 29 expired or cancelled.
Of the 16 never-finaled permits, 1 is 3 to 5 years old, 4 are 5 to 10 years old, 11 are over 10 years old. 2 were filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
55 bathroom remodel permits: 49 completed, 1 in progress, 5 expired or cancelled. Typically 3 days from filing to permit and 343 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 19, 2024 | Completed final sign-off Sep 2025 | 2721 Pierce St | kitchen remodel, new powder room, remodel 1 bath, and new primary bath. no exterior workDetails
kitchen remodel, new powder room, remodel 1 bath, and new primary bath. no exterior work | $268,000 |
| Aug 20, 2024 | Completed final sign-off Nov 2025 | 21 Presidio Tr | remodel bathroom, kitchen, laundry room, new heat pump space heating at top floor, replace select windows in kind, non visible to the street.Details
remodel bathroom, kitchen, laundry room, new heat pump space heating at top floor, replace select windows in kind, non visible to the street. | $436,665 |
| May 2, 2024 | In progress filed May 2024, not yet issued | 102 Walnut St | interior remodel of bathroom only. new hydronic radiant warmboard floor heatingDetails
interior remodel of bathroom only. new hydronic radiant warmboard floor heating | $25,000 |
| Dec 6, 2023 | Completed final sign-off Jan 2024 | 2090 Pacific Av | #503: add new stackable washer and dryer in entry closet. dryer will be an electric, ductless dryer. the water supply and the drain will be conected to the adjacent bathroom's plumbing. no structural work and no exterior work.Details
#503: add new stackable washer and dryer in entry closet. dryer will be an electric, ductless dryer. the water supply and the drain will be conected to the adjacent bathroom's plumbing. no structural work and no exterior work. | $3,500 |
| Feb 5, 2021 | Completed final sign-off Feb 2023 | 635 Broderick St | (unit 635). 3rd fl renovate (e) kitchen & laundry. (n) lighting, appliances & finishes. remove wall between kitchen & laundry. renovate (e) bathroom to (n) 3/4 bath. renovate (e) toilet room to 3/4 bath. (e) office to be (n) bedroom.Details
(unit 635). 3rd fl renovate (e) kitchen & laundry. (n) lighting, appliances & finishes. remove wall between kitchen & laundry. renovate (e) bathroom to (n) 3/4 bath. renovate (e) toilet room to 3/4 bath. (e) office to be (n) bedroom. | $55,000 |
| Feb 5, 2021 | Completed final sign-off Feb 2023 | 633 Broderick St | (unit 633). 2nd fl renovate (e) kitchen & laundry. (n) lighting, appliances & finishes. remove wall between kitchen & laundry. renovate (e) bathroom to (n) 3/4 bath. renovate (e) toilet room to 3/4 bath. 2 (e) rooms to be (n) bedrooms.Details
(unit 633). 2nd fl renovate (e) kitchen & laundry. (n) lighting, appliances & finishes. remove wall between kitchen & laundry. renovate (e) bathroom to (n) 3/4 bath. renovate (e) toilet room to 3/4 bath. 2 (e) rooms to be (n) bedrooms. | $55,000 |
| Dec 9, 2020 | Completed final sign-off Nov 2022 | 3103 Clay St | revision to pa# 202010065947. floor plan change to upper floor kitchen & main bath & bedroom structural work to reflect changes. interior only.Details
revision to pa# 202010065947. floor plan change to upper floor kitchen & main bath & bedroom structural work to reflect changes. interior only. | $5,000 |
| Nov 20, 2020 | Completed final sign-off Sep 2022 | 3398 Baker St | priority processing ab-004. remodel kitchen & 3 bathrooms.partial renovation of 1/f. renovation of levels 2 and 3. repair stucco in-kind, replacement of all mech/electrical/plmbing.no horizontal/vertical changes.Details
priority processing ab-004. remodel kitchen & 3 bathrooms.partial renovation of 1/f. renovation of levels 2 and 3. repair stucco in-kind, replacement of all mech/electrical/plmbing.no horizontal/vertical changes. | $800,000 |
| Oct 6, 2020 | Completed final sign-off Nov 2022 | 3103 Clay St | residential improvement: replace in kind front stairs, kitchen, and two bathroom remodels. new plumbing and new electrical. widen interior stairway. no work outside property line or in public right of way. legalize 664 sq feet of habitable space on ground floor.Details
residential improvement: replace in kind front stairs, kitchen, and two bathroom remodels. new plumbing and new electrical. widen interior stairway. no work outside property line or in public right of way. legalize 664 sq feet of habitable space on ground floor. | $650,000 |
| Sep 24, 2020 | Completed final sign-off Jul 2022 | 3398 Baker St | 3rd fl bathroom (not master bath) remodel in kind. no change in layout.Details
3rd fl bathroom (not master bath) remodel in kind. no change in layout. | $25,000 |
| Sep 4, 2020 | Expired or cancelled cancelled Feb 2021 | 3531 Clay St | lowest level in-kind bathroom remodel. one bathroom only. powder room: new sink & toilet.Details
lowest level in-kind bathroom remodel. one bathroom only. powder room: new sink & toilet. | $10,000 |
| Aug 28, 2020 | Completed final sign-off Sep 2022 | 3103 Clay St | remodel upper level bathroom, replace in-kind, no structural, no walls moved.Details
remodel upper level bathroom, replace in-kind, no structural, no walls moved. | $25,000 |
| Nov 20, 2019 | Completed final sign-off Jan 2022 | 3838 Clay St | to comply w/nov #201815151. repair to fire damage structure. work includes reconfig. of floor plates, addition of dormer at rear, excavation in basement to create (n) habitable space, (n) kitchen, baths, structural upgrades, envelope upgrades, (n) windows & doors, (n) deck less than 3' from grade.Details
to comply w/nov #201815151. repair to fire damage structure. work includes reconfig. of floor plates, addition of dormer at rear, excavation in basement to create (n) habitable space, (n) kitchen, baths, structural upgrades, envelope upgrades, (n) windows & doors, (n) deck less than 3' from grade. | $800,000 |
| Oct 21, 2019 | Completed final sign-off Sep 2020 | 3364 Washington St | interior remodel replace plubing fixtures and lighting. 1st fl remodel mudroom and laundry, replace plumbing in bath. 2nd fl replace guardrails, lighting, plumbing fixtures. 3rd fl replace lighting, plumbing fixtures, roofdeck replace guardrailDetails
interior remodel replace plubing fixtures and lighting. 1st fl remodel mudroom and laundry, replace plumbing in bath. 2nd fl replace guardrails, lighting, plumbing fixtures. 3rd fl replace lighting, plumbing fixtures, roofdeck replace guardrail | $25,000 |
| Oct 7, 2019 | Completed final sign-off Feb 2021 | 2201 Baker St | remodel of (e) entry level including associated structural work. bath remodel and new stair connecting 1-4th levels. new steel door at 2nd levelDetails
remodel of (e) entry level including associated structural work. bath remodel and new stair connecting 1-4th levels. new steel door at 2nd level | $150,000 |
| Sep 16, 2019 | Completed final sign-off Mar 2021 | 2714 Pacific Av | interior remodel within (e) building-g/f convert utility rooms into bedroom, convert closet to bathroom,remodel (e) bathroom;1/f remove wall between kit/din, remodel kitch, remodel bathroom, new int stairs; 2/f reconfig bedroom/remodel mast bathroom.(n) glass railing to replace (e) guardrail at roofDetails
interior remodel within (e) building-g/f convert utility rooms into bedroom, convert closet to bathroom,remodel (e) bathroom;1/f remove wall between kit/din, remodel kitch, remodel bathroom, new int stairs; 2/f reconfig bedroom/remodel mast bathroom.(n) glass railing to replace (e) guardrail at roof | $422,000 |
| Nov 1, 2018 | Completed final sign-off Feb 2020 | 2511 Pacific Av | revision to existing permit 2017-1222-7244. add new powder room at basement. remodeling 3rd floor bath.Details
revision to existing permit 2017-1222-7244. add new powder room at basement. remodeling 3rd floor bath. | $10,000 |
| Oct 2, 2018 | Completed final sign-off Feb 2020 | 3415 Pacific Av | basement level: conditioning 602 s.f. of extg space, remodeling laundry room,adding bathroom, wine room, new furnace and on demand water heater, adding storage closets in hall, & new elect. level one: open up wall between kitchen and family room, remodel kitchen, relocate powder room,Details
basement level: conditioning 602 s.f. of extg space, remodeling laundry room,adding bathroom, wine room, new furnace and on demand water heater, adding storage closets in hall, & new elect. level one: open up wall between kitchen and family room, remodel kitchen, relocate powder room, | $375,000 |
| Jun 27, 2018 | Completed final sign-off Jun 2019 | 3565 Clay St | remove stucco on the exterior on the south side elevation to repair leaks. remodel (e) bathroom in kind. install radiant heat throughout. replace stucco in-kind (not visible from street)Details
remove stucco on the exterior on the south side elevation to repair leaks. remodel (e) bathroom in kind. install radiant heat throughout. replace stucco in-kind (not visible from street) | $55,000 |
| Feb 15, 2018 | Completed final sign-off Dec 2018 | 20 Walnut St | revision to 201712045342 basemenet level - relocate bathroom, relocate mechanical, conditioning 171 sf of space, new electrical. excavate less than 30 yards, max ht 5'Details
revision to 201712045342 basemenet level - relocate bathroom, relocate mechanical, conditioning 171 sf of space, new electrical. excavate less than 30 yards, max ht 5' | $40,000 |
| Nov 28, 2017 | Completed final sign-off Dec 2018 | 20 Walnut St | basement no work. 1st level - remodel kitchen in-kind, relocate powder room, new electrical; level 2 - remodel 3 bathrooms in-kind, new electrical; level 3 - washer & dryer relocated from basement, new electrical.Details
basement no work. 1st level - remodel kitchen in-kind, relocate powder room, new electrical; level 2 - remodel 3 bathrooms in-kind, new electrical; level 3 - washer & dryer relocated from basement, new electrical. | $210,000 |
| Nov 22, 2017 | Completed final sign-off Jul 2019 | 3565 Clay St | second story rear yard addition over existing deck, new glass roof over existing 1st story deck, remodel existing bath on 2nd fl. new windows on south elevation to match existing. new siding to replace stucco on south elevationDetails
second story rear yard addition over existing deck, new glass roof over existing 1st story deck, remodel existing bath on 2nd fl. new windows on south elevation to match existing. new siding to replace stucco on south elevation | $100,000 |
| Aug 2, 2017 | Completed final sign-off Nov 2017 | 3401 Geary Bl | g/f -tenant improvement includes new ada ramp & ada bathroom, accessory office. interior retail t.i. , no change in use of space, no additional sq ft, existing windows to remain, existing heating & cooling to remain.Details
g/f -tenant improvement includes new ada ramp & ada bathroom, accessory office. interior retail t.i. , no change in use of space, no additional sq ft, existing windows to remain, existing heating & cooling to remain. | $52,500 |
| Jul 17, 2017 | Completed final sign-off May 2019 | 3515 Washington St | exploratory kitchen and bath demolition less than 500 sq ft. 1st and 2nd floors-3 bathrooms total. no frame workDetails
exploratory kitchen and bath demolition less than 500 sq ft. 1st and 2nd floors-3 bathrooms total. no frame work | $5,000 |
| May 3, 2017 | Completed final sign-off Sep 2017 | 2633 Steiner St | interior bathroom remodel to 2 bathrooms. fill in small (e) jog in lightwell at bathroom level only. revision of bathroom 201001265354Details
interior bathroom remodel to 2 bathrooms. fill in small (e) jog in lightwell at bathroom level only. revision of bathroom 201001265354 | $20,000 |
| Jul 22, 2016 | Completed final sign-off Apr 2018 | 3421 Jackson St | remodel of exisitng s.f.h. remove & replace (e) rear stucco, damaged by dryrot. repair dryrot as required. remodel existing kitchen in -kind. remodel exisitng master bath in-kind. n/a maher ordinanceDetails
remodel of exisitng s.f.h. remove & replace (e) rear stucco, damaged by dryrot. repair dryrot as required. remodel existing kitchen in -kind. remodel exisitng master bath in-kind. n/a maher ordinance | $94,000 |
| Jul 13, 2016 | Completed final sign-off May 2019 | 3515 Washington St | horizontal & vertical addition, interior renovation including bathroom & kitchen. exclude foundation work & interior remodel & expansion of basement level (under separate permit)Details
horizontal & vertical addition, interior renovation including bathroom & kitchen. exclude foundation work & interior remodel & expansion of basement level (under separate permit) | $350,000 |
| Jun 14, 2016 | Completed final sign-off Mar 2017 | 3737 Clay St | interior remodel including limited structural. remodel kitchen and master bath 2/f, powder room and mud room at 1st fl, stair to basement family roomDetails
interior remodel including limited structural. remodel kitchen and master bath 2/f, powder room and mud room at 1st fl, stair to basement family room | $250,000 |
| May 18, 2016 | Completed final sign-off Apr 2017 | 2730 Broderick St | interior remodel within extg bldg, includes limited structural work. remodel 3 extg full bath and 1 half bath, remodel kitchen, (e) garage door and planter to remain. replace 1 glas block window on front facade w/ (n) double hung wood window to match adjacent. n/a for maherDetails
interior remodel within extg bldg, includes limited structural work. remodel 3 extg full bath and 1 half bath, remodel kitchen, (e) garage door and planter to remain. replace 1 glas block window on front facade w/ (n) double hung wood window to match adjacent. n/a for maher | $750,000 |
| Mar 3, 2016 | Expired or cancelled withdrawn Jul 2016 | 2409 Green St | basement level - lower floor in raised areas for family room, bathroom & office. level one - remodel ktichen, breakfast room & powder room. no work on level two. n/a maher ordinanceDetails
basement level - lower floor in raised areas for family room, bathroom & office. level one - remodel ktichen, breakfast room & powder room. no work on level two. n/a maher ordinance | $250,000 |
| Feb 23, 2016 | Completed final sign-off Apr 2017 | 3808 Clay St | excavation of 1st floor rear; interior remodel within existing building @ 2nd & 3rd floor; replace portion of roof & includes structural work. remodel (2) baths @ 3rd floor & one additional @ 1st floor.Details
excavation of 1st floor rear; interior remodel within existing building @ 2nd & 3rd floor; replace portion of roof & includes structural work. remodel (2) baths @ 3rd floor & one additional @ 1st floor. | $650,000 |
| Aug 14, 2015 | Completed final sign-off Mar 2016 | 200 Laurel St | basement level: add laundry room and mud room. level 1: no additional work. level 2: extend master bedroom closet & add seperate toilet compartment (master bathroom). level 3: add wet bar.Details
basement level: add laundry room and mud room. level 1: no additional work. level 2: extend master bedroom closet & add seperate toilet compartment (master bathroom). level 3: add wet bar. | $50,000 |
| Jun 11, 2015 | Completed final sign-off Feb 2016 | 2427 Vallejo St | enlarge interior of garage, new laundry, new 3 stop hydraulic elevator, 2nd fl new kitchen remodel, removal of e 2nd stair, new library room, new bath in 3rd fl. compliance with maher ordinance no 155-13 not required.Details
enlarge interior of garage, new laundry, new 3 stop hydraulic elevator, 2nd fl new kitchen remodel, removal of e 2nd stair, new library room, new bath in 3rd fl. compliance with maher ordinance no 155-13 not required. | $250,000 |
| May 27, 2015 | Completed final sign-off Nov 2015 | 2457 Buchanan St | remodel kitchen and 2 bathsDetails
remodel kitchen and 2 baths | $100,000 |
| Apr 20, 2015 | Completed final sign-off Mar 2016 | 200 Laurel St | basement level, move south wall in garage. waterproof wall a sw corner. level 1, remodel kitchen, pantry, butlers pantry, level 2 remodel powder room, 1 bath, add 1 bath, level 3 open up flat portion of ceiling in north tv room, create pitched ceiling, add skylights. no expansion of bldg envelope.Details
basement level, move south wall in garage. waterproof wall a sw corner. level 1, remodel kitchen, pantry, butlers pantry, level 2 remodel powder room, 1 bath, add 1 bath, level 3 open up flat portion of ceiling in north tv room, create pitched ceiling, add skylights. no expansion of bldg envelope. | $300,000 |
| Apr 13, 2015 | Completed final sign-off Aug 2015 | 1819 Alabama St | new bathroom at basement, unit 1, revonate bathroom at 1st fl, unit 1. new skylight. renovate bath unit 2, renovate kitchenette unit 2Details
new bathroom at basement, unit 1, revonate bathroom at 1st fl, unit 1. new skylight. renovate bath unit 2, renovate kitchenette unit 2 | $60,000 |
| Sep 10, 2014 | Completed final sign-off Sep 2015 | 156 Commonwealth Av | interior remodel: remodle of kitchen, demo (e) service stair, new powder room, replace (e) rear deck with new @ 1st floor, remodel of master & guest baths, (n) laundery closet @ 2nd floor.Details
interior remodel: remodle of kitchen, demo (e) service stair, new powder room, replace (e) rear deck with new @ 1st floor, remodel of master & guest baths, (n) laundery closet @ 2nd floor. | $50,000 |
| May 28, 2014 | Completed final sign-off Jul 2014 | 2823 Pine St | remodel (e) bath & kitchen, new fixtures/appliances at (e) locations, remodel (e) bedroom (finish only), remodel (e) fireplace area (finish only), new bi fold door at (e) in entry, new trim throughout, new bedroom and dining lighting on dimmer swithces, new kitchen exhaust hood.Details
remodel (e) bath & kitchen, new fixtures/appliances at (e) locations, remodel (e) bedroom (finish only), remodel (e) fireplace area (finish only), new bi fold door at (e) in entry, new trim throughout, new bedroom and dining lighting on dimmer swithces, new kitchen exhaust hood. | $30,000 |
| Apr 25, 2014 | Completed final sign-off Dec 2015 | 4367 24th St | horizontal addition to 1st & 2nd floors of (e) residence. renovate /enlarge (e) kitchen add breakfast room on first flr. enlarge (e) bedrooms and add new bathroom on 2nd flr.Details
horizontal addition to 1st & 2nd floors of (e) residence. renovate /enlarge (e) kitchen add breakfast room on first flr. enlarge (e) bedrooms and add new bathroom on 2nd flr. | $150,000 |
| Jan 29, 2014 | Completed final sign-off Mar 2022 | 1148 Dolores St | new 351 sq ft conditioned space (hallway) at 1st fl level, renovate existing bathroom at 1st fl., renovate 2 baths and mster bath at 3rd fl, new skylightDetails
new 351 sq ft conditioned space (hallway) at 1st fl level, renovate existing bathroom at 1st fl., renovate 2 baths and mster bath at 3rd fl, new skylight | $75,000 |
| Nov 26, 2013 | Completed final sign-off Jul 2014 | 29 Delmar St | 2nd and 3rd fls: enovate existing kitchens, renovate existing bathrooms, new bath at 2nd and 3rd floorsDetails
2nd and 3rd fls: enovate existing kitchens, renovate existing bathrooms, new bath at 2nd and 3rd floors | $75,000 |
| Jul 18, 2013 | Completed final sign-off Sep 2013 | 1011 Church St | remodel guest bathroom & powder room in kind. all fixtures in exact same location. new tile, paint and cabinet. no structural work.Details
remodel guest bathroom & powder room in kind. all fixtures in exact same location. new tile, paint and cabinet. no structural work. | $12,000 |
| Aug 5, 2011 | Expired or cancelled expired Jun 2014 | 2426 Vallejo St | remodel of 4th floor bathroom in kind. exploratory at 1st and 2nd floor, non-structural holes. 8- 16" x 16" holes @ rear exterior wall to review framing - all holes to be repaired.Details
remodel of 4th floor bathroom in kind. exploratory at 1st and 2nd floor, non-structural holes. 8- 16" x 16" holes @ rear exterior wall to review framing - all holes to be repaired. | $7,500 |
| May 6, 2011 | Expired or cancelled cancelled Dec 2011 | 410 Jessie St | remodel (e) kitchen, remodel (e) bathroom. add new powder room, add new skylight. add built in bbq, sink & fridge (kitchen) & planters on (e) roof deck.Details
remodel (e) kitchen, remodel (e) bathroom. add new powder room, add new skylight. add built in bbq, sink & fridge (kitchen) & planters on (e) roof deck. | $70,000 |
| Apr 5, 2011 | Completed final sign-off Feb 2012 | 215 Lansdale Av | excavate crawl space at level one to create media room, wine room, bathroom, & storage rooms; add windows to rear of houseDetails
excavate crawl space at level one to create media room, wine room, bathroom, & storage rooms; add windows to rear of house | $200,000 |
| Feb 22, 2011 | Completed final sign-off Aug 2012 | 325 27th St | vertical additon. updated kitchen & powder room, layout, add bathroom&bedroom at upper level (no additional square footage). new siding & replacement windows at rear. new roof & front wall at street side of upper floor where vertical additions are to be added.Details
vertical additon. updated kitchen & powder room, layout, add bathroom&bedroom at upper level (no additional square footage). new siding & replacement windows at rear. new roof & front wall at street side of upper floor where vertical additions are to be added. | $150,000 |
| Dec 15, 2010 | Completed final sign-off Jul 2011 | 2717 Union St | remodel 2 bathrooms & 1 kitchen. replace damage windows in kind, not visible from the street. new walls 1 hr fire ratedDetails
remodel 2 bathrooms & 1 kitchen. replace damage windows in kind, not visible from the street. new walls 1 hr fire rated | $100,000 |
| Nov 19, 2010 | Completed final sign-off Jun 2014 | 2426 Vallejo St | addition of office & bedroom, new bathroom to 1st floor. new family room, new deck and move kitchen on 2nd floor.Details
addition of office & bedroom, new bathroom to 1st floor. new family room, new deck and move kitchen on 2nd floor. | $380,000 |
| Oct 15, 2009 | Completed final sign-off Jun 2010 | 1531 16th Av | legalize downstair/lower floor incl. full bath, laundry, bedroom and den. 2nd fl: interior kitchen , bathroom renovation,new half bathroom, replace (e) kitchen window. voluntary structural upgrade incl. add stiffening at garage level and new foundation at crawl space.Details
legalize downstair/lower floor incl. full bath, laundry, bedroom and den. 2nd fl: interior kitchen , bathroom renovation,new half bathroom, replace (e) kitchen window. voluntary structural upgrade incl. add stiffening at garage level and new foundation at crawl space. | $100,000 |
| Sep 18, 2009 | Completed final sign-off Dec 2009 | 519 10th Av | interior remodel of (e) bathroom, replace fixtures, millwork, finishes, elec. no changing of (e) walls, no added sq. footage, no change to bldg footprint/exterior.Details
interior remodel of (e) bathroom, replace fixtures, millwork, finishes, elec. no changing of (e) walls, no added sq. footage, no change to bldg footprint/exterior. | $25,000 |
| Aug 4, 2009 | Completed final sign-off Nov 2009 | 1531 16th Av | remove cabinets and wall coverings in kitchen and bathrooms to expose existing rough plumbing and elec work. architect is working on drawings for remodel work. kitchen and bath. needs to verify existing structure, no structural work.Details
remove cabinets and wall coverings in kitchen and bathrooms to expose existing rough plumbing and elec work. architect is working on drawings for remodel work. kitchen and bath. needs to verify existing structure, no structural work. | $1,500 |
| Nov 8, 2006 | Expired or cancelled expired Apr 2008 | 845 El Camino Del Mar | (e) windows to be replaced with new wood frame insulated glass units with simulated divided lites, remove & replace (e) stucco finish & wood detailing. complete voluntary seismic shear wall upgrade wtih hold-downs into (e) foundation. interior kitchen & bathroom renovation. remove & replace (e)Details
(e) windows to be replaced with new wood frame insulated glass units with simulated divided lites, remove & replace (e) stucco finish & wood detailing. complete voluntary seismic shear wall upgrade wtih hold-downs into (e) foundation. interior kitchen & bathroom renovation. remove & replace (e) | $200,000 |
| Apr 28, 2005 | Completed final sign-off Aug 2005 | 426 Guerrero St | remodel 2 bathrooms,replace fixtures in (e)location.no alterations to doors,walls or windows.Details
remodel 2 bathrooms,replace fixtures in (e)location.no alterations to doors,walls or windows. | $60,000 |
| Jun 25, 2004 | Completed final sign-off Sep 2004 | 633 Broderick St | replace (e)kitchen cabinets/appliances,replace (e)bathroom cabinets & fixtures,scaffold bldg.Details
replace (e)kitchen cabinets/appliances,replace (e)bathroom cabinets & fixtures,scaffold bldg. | $50,000 |
| Mar 5, 2001 | Completed final sign-off Jan 2002 | 1314 Page St | removal of all fire and water damaged bath and plaster and roof damage, membersDetails
removal of all fire and water damaged bath and plaster and roof damage, members | $9,800 |