Permit GraphSan Francisco building permits since 2000

Block 0975, lot 003

2201 Baker St

28 permits filed for this property since 2000.

CompletedIn progressNever finaledExpired or cancelled
FiledOutcomeAddressContractorWork described on the permitDeclared cost
May 20, 2020Never finaled
issued May 2020, no final
2201 Baker Ststreet space
Oct 7, 2019Completed
final sign-off Feb 2021
2201 Baker StCairn Constructionremodel of (e) entry level including associated structural work. bath remodel and new stair connecting 1-4th levels. new steel door at 2nd level$150,000
May 16, 2017Never finaled
issued May 2017, no final
2201 Baker Ststreet space permit
Aug 4, 2014Never finaled
issued Aug 2014, no final
2201 Baker Ststreet space
Aug 19, 2009Expired or cancelled
cancelled Nov 2009
2201 Baker Stto obtain final inspection for work approved under pa 200601031370; sp insp required
Aug 19, 2009Completed
final sign-off Aug 2009
2201 Baker Stto obtain final inspection for work approved under pa 200810083709; all work has been completed
Aug 19, 2009Never finaled
issued Aug 2009, no final
2201 Baker Stto obtain final inspection for work approved under pa 200804149657; all work has been completed.
Aug 19, 2009Never finaled
issued Aug 2009, no final
2201 Baker Stto obtain final inspection for work approved under pa 200806275593; all work has been completed.
Aug 19, 2009Never finaled
issued Aug 2009, no final
2201 Baker Stto obtain final inspection for work approved under pa 200803066540; sp insp required
Aug 19, 2009Completed
final sign-off Aug 2009
2201 Baker Stto complete and obtain final inspection for work approved under pa 200802064121; all work has been completed; sp insp reqd
Aug 19, 2009Expired or cancelled
cancelled Nov 2009
2201 Baker Stto obtain final inspection for work approved under pa 200812047794; all work has been completed
Jun 17, 2009Completed
final sign-off Jun 2009
2201 Baker StSerrano Fire Protection Systemsas built to previous pa# 2008-1204-7794-using 2" fire service instead of 2" combo, addition of (2) heads in garage storage units.
Mar 18, 2009Completed
final sign-off Aug 2009
2201 Baker Stto rebuilt and enlarge extg dormer on extg roof and top floor area only.$5,500
Jan 14, 2009Never finaled
issued Jan 2009, no final
2201 Baker Ststreet space permit only.
Dec 4, 2008Completed
final sign-off Aug 2009
2201 Baker StSerrano Fire Protection Systemsfull installation of nfpa 13 fire sprinkler system throughout the building total 111 sprinkler heads. ord. 1 for garage, light haz for residential- includes new underground & 2" inches combo meter.$20,000
Oct 14, 2008Never finaled
issued Oct 2008, no final
2201 Baker Ststreet space permit
Oct 8, 2008Expired or cancelled
expired Aug 2009
2201 Baker Stcomply (partially) with nov# 200802064121 to restore roof to (e), original condition as per request by dcp. lower approx 21" per city planning approval. additional permit will be filed to comply with n.o.v$10,000
Jun 27, 2008Never finaled
issued Jun 2008, no final
2201 Baker StOccidental Expressreplacing roof shingles including composition shingles.$28,000
Apr 14, 2008Expired or cancelled
expired Mar 2026
2201 Baker Stto install new interior elevator at all floors.$10,000
Mar 12, 2008Never finaled
issued Mar 2008, no final
2201 Baker Ststreet space
Mar 6, 2008Never finaled
issued Mar 2008, no final
2201 Baker Streplace cracked slab with new slab on grade & grade beam$8,000
Feb 6, 2008Expired or cancelled
expired Aug 2009
2201 Baker StCullinane Plasteringint. alterations to (e)4 story bldg,(n) systems, minor ext. alterations, all int. walls removed. 1st flr.:2(n) windows added & 11 to be replaced; 2nd. flr.:7(n) windows & 8 to be replaced; 3rd flr.:6(n) windows & 9 to be replaced.$300,000
Sep 5, 2006Expired or cancelled
cancelled Oct 2007
2201 Baker Stenlarge a section of the building on the north side to create a new set of stairs to connect all floors$20,000
Jan 3, 2006Expired or cancelled
cancelled Nov 2009
2201 Baker Stremove brick foundation & replace it with a concrete foundation + replace partition walls + replace center support beam /wall.$100,000
Dec 20, 2005Expired or cancelled
cancelled Nov 2009
2201 Baker Stphase i of remodeling of (e) building. remodeling of (e) bedrooms & bathrooms on 2nd floors. no exterior work. work on 1st floor to remove 1/2 bath, closet & a wall.$40,000
Dec 2, 2005Expired or cancelled
cancelled Nov 2009
2201 Baker Stenlarge extg 2 car garage within the extg envelope of the bldg/ perform some preliminary demolition opening 3x3 holes at ceilings on each room or the bldg for future remodel$30,000
Sep 13, 2005Expired or cancelled
cancelled Nov 2009
2201 Baker Stremoval of (e)stair as shown on sheet a2.3$1,000
Apr 12, 2005Completed
final sign-off Nov 2005
2201 Baker Stchange of joccupancy class only no constructiion to takeplace on property all drawings are shown